ML20196E756

From kanterella
Jump to navigation Jump to search
Forwards Corrected Page 3/4 6-2 to Amend 92 to License NPF-7,changing Ref from Third Test to Second Test & Delete Ref to 10-yr ISI Outage in Footnote
ML20196E756
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/06/1988
From: Engle L
Office of Nuclear Reactor Regulation
To: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20196E761 List:
References
NUDOCS 8812120078
Download: ML20196E756 (2)


Text

,

r.

December 6, 1988 Docket No. 50-339 DISTRIBUTION See attached page Mr. W. R. Cartwright Vice President - Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.

Glen Allen, Virginia 23060 l

Dear Mr. Cartwright:

SUBJECT:

NORTH ANNA UNIT 2 - CORRECTION TO AMENDMENT NO. 92 ISSUED NOVEMBER 10, 1988 On November 10, 1988, the Connission issued Amendment Nos.106 and 92 to Facility Operating 1.icensa Nos. NPF-4 and NPF-7, respective'y, for the North Anna Power Station, Unit Nos. I and 2 (NA-182). These amendments modified the requirement to conduct a Type A test at 40 i 10 bonth intervals during each 10-year inservice inspection (IST) and allow the third Type A test of the first 10-year service interval to take place during the NA-1&21989/10-year inservice inspection outages.

By letter dated November 23, 1988, you informed us that your' submittal dated October 6,1988, incorrectly referred to the the current Type A test interval for NA-2 as the third interval test to be conducted during the 10-year inservice inspection outage.

You further stated that the current interval for NA-2 is the second interval with the second interval Type A test scheduled for the NA-21989 refueling outage. Therefore, the correct NA-2 TS should change the reference from the third test to the second test and delete the reference to the 10-year ISI outage in the footnote.

Enclosed is the corrected NA-2 TS page 3/4 6-2 as well as the corresponding over-leaf page to be inserted into the HA-2 TS.

The staff has determined that the correction of this error does not change the staff's evaluation and conclusion which supported the changes to the NA-182 Technical Specifications.

Sincerely,

[priginal Signct! by Leon B. Engle, Project flanager Project Directorate !!-2 Division of Reactor Projects-1/II Office of Nuclear Reactor Regulation i

Enclosure:

I As stated

\\

cc w/ enclosure:

See next page i e @how

[0{

D 2

Pi

^

2 D

er LEng e/jd 12/

/88 12/ Q /88 12/[,/88 f

8G12120078 GS.t206 PDR ADOCK O'.5000339 P

FDC

Mr. W. R. Cartwright North Anna Power Station p

Virginia Electric & Power Company Units 1 and 2 cc:

Mr. William C. Porter, Jr.

C. M. G. Bu ttery, M.D., M.P.H.

County Administrator Department of Health Louisa County 109 Governor Street P.O. Box 160 Richmond, Virginia 23219 Louisa, Virginia 23093 Regional Administrator, Region II Michael W. haupin, Esq.

U.S. Nuclear Regulatory Commission Hunton and Williams 101 Marietta Street N.W., Suite 2900 P. O. Box 1535 Atlanta, Georgia 30323 Richmond, Virginia 23212 Mr. W. T. Lough Virginia Corporation Commission Mr. G. E. Xane Division of Energy Regulation P. O. Box 402 P. O. Box 1197 Mineral, Virginia 23117 Richmond, Virginia 23209 Old Dominion Electric Cooperative Ellyn R. Weiss, Esq.

c/o Executive Vice President Harmon, Weiss and Jordan Innsbrook Corporate Center 2001 S Street HW 4222 Cox Road, Suite 102 Washington, DC 20009 Glen Allen, Virginia 23060 Mr. W. L. Stewart Senior Vice President - Power Virginia Electric and Power Co.

Post Office Box 26666 Richmond, Virginia 23261 Mr. Pa*-ick A. O' Hare Off' s of the Attorney General Sup ocurt Building 101 North 8th Street Richmond, Virginia 23219 i

Resident Inspector / North Anna c/o U.S. NRC Senior Resident Inspector Route 2, Box 78 Mineral, Virginia 23117 i