|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML20207C9851999-05-28028 May 1999 Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML20206U7441999-05-20020 May 1999 Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date ML20207A8541999-05-20020 May 1999 Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206L4661999-05-10010 May 1999 Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062D7631990-11-0606 November 1990 Forwards FEMA Re Plant Emergency Exercises on 900808.Two Deficiences in Offsite Performance Noted ML20058H0211990-10-29029 October 1990 Forwards Insp Repts 50-338/90-26 & 50-339/90-26 on 900908-24 & 1009-12.No Violations or Deviations Noted ML20058D7431990-10-26026 October 1990 Grants 901004 Request for Waiver from Tech Spec 6.9.1.7 Re Submittal of Core Surveillance Rept ML20058D7291990-10-25025 October 1990 Ack Receipt of Re Violations Noted in Insp Repts 50-338/90-18 & 50-339/90-18 ML20058B4151990-10-24024 October 1990 Ack Receipt of 880808 & 900613 Responses to NRC Bulletin 88-004 Re Potential safety-related Pump Loss ML20058E5771990-10-23023 October 1990 Forwards Requalification Exam Rept 50-338/OL-90-01 for Units 1 & 2 Administered During Wks of 900820 & 27 ML20058E9271990-10-23023 October 1990 Forwards SALP Repts 50-338/90-22 & 50-339/90-22 for June 1989 - Aug 1990 ML20062C4311990-10-18018 October 1990 Forwards SE & TER Concluding That Util Actions Do Not Conform to Requirements of Station Blackout Rule.Plant Emergency Diesel Generators Do Not Have Excess Capacity Available to Qualify Generators as Aac Source ML20062B2531990-10-12012 October 1990 Requests That Analyses of Liquid Samples Spiked W/ Radionuclides Be Completed as Soon as Practicable,But No Later than 60 Days from Receipt of Samples.Results Should Be Sent to DM Collins at Listed Address ML20062B6471990-10-11011 October 1990 Advises That Rev 15 to Guard Training & Qualification Plan Consistent w/10CFR50.54(p) & Acceptable ML20058B4241990-10-10010 October 1990 Confirms Region II Insp of fitness-for-duty Program on 901023-25.Tentative Itinerary Encl ML20058B3871990-10-10010 October 1990 Forwards Details Re Allegation Rept Rii 90-A-0152,per 901001 Telcon.Encl Withheld (Ref 10CFR2.790) ML20058A8481990-10-0909 October 1990 Forwards Insp Repts 50-338/90-23 & 50-339/90-23 on 900819- 0915.Violation Noted But Not Cited ML20059N1011990-09-19019 September 1990 Forwards Insp Repts 50-338/90-19 & 50-339/90-19 on 900820-24.Violations Noted But Not Cited ML20059K7941990-09-11011 September 1990 Forwards Insp Repts 50-338/90-18 & 50-339/90-18 on 900708- 0818 & Notice of Violation ML20059K7301990-09-0707 September 1990 Ack Receipt of in Response to Violations Noted in Insp Repts 50-338/90-11 & 50-399/90-11.Expresses Appreciation Re Issues Concerning EOPs & Abnormal Procedures ML20059K6811990-09-0606 September 1990 Forwards Insp Repts 50-338/90-20 & 50-339/90-20 on 900806- 10.No Violations or Deviations Noted ML20058P8841990-08-0606 August 1990 Forwards Insp Repts 50-338/90-16 & 50-339/90-16 on 900709-13.No Violations or Deviations Noted ML20056A0491990-07-30030 July 1990 Forwards Insp Repts 50-338/90-17 & 50-339/90-17 on 900709-13.No Violations or Deviations Noted ML20055H3831990-07-25025 July 1990 Confirms 900720 Verbally Granted Temporary Waiver of Compliance from Tech Spec 3.3.1.1,Table 3.3-2 Re Response Time Testing of Pressurizer High Level Reactor Trip Function ML20056A5331990-07-20020 July 1990 Forwards Summary of 900718 Mgt Meeting at Plant Re self-assessment of Facility ML20055H4401990-07-0505 July 1990 Ack Receipt of Providing Scenario for Plume & Injection Pathway Exercise Scheduled on 900807 & 08 ML20055H4491990-07-0303 July 1990 Forwards Summary of 900625 Meeting W/Util in Region II Ofc Re Emergency Preparedness Upgrade Program.List of Attendees Also Encl ML20055H6151990-06-28028 June 1990 Forwards Insp Repts 50-338/90-13 & 50-339/90-13 on 900514-18 & 29.Noncited Violations Noted ML20055H6271990-06-26026 June 1990 Forwards Insp Repts 50-338/90-14 & 50-339/90-14 on 900604-08.No Violations or Deviations Noted ML20059M8771990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248B4731989-09-21021 September 1989 Forwards Insp Repts 50-338/89-26 & 50-339/89-26 on 890716- 0822 & Notice of Violation ML20247P4281989-09-18018 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/89-12 & 50-339/89-12 ML20247C2011989-09-0707 September 1989 Forwards Safety Evaluation Accepting Util 890512 Response to IE Bulletin 80-11, Masonry Wall Design IR 05000338/19890181989-09-0101 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/89-18 & 50-339/89-18.Implementation of Corrective Actions Will Be Examined During Future Insps ML20246M7141989-08-23023 August 1989 Forwards Insp Repts 50-338/89-22 & 50-339/89-22 on 890601-0714.No Violations or Deviations Noted ML20246M5381989-08-22022 August 1989 Forwards Insp Repts 50-338/89-27 & 50-339/89-27 on 890731-0804.No Violations or Deviations Noted ML20246H2371989-08-21021 August 1989 Forwards Safety Sys Outage Mods & Maint Team Insp Repts 50-338/89-200 & 50-339/89-201 During Wks of 890508 & 22.No Violations Noted.Identified Weaknesses Re Performance of Vendor Surveillance Activities IR 05000338/19890141989-08-21021 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/89-14 & 50-339/89-14 ML20246M4781989-08-21021 August 1989 Confirms 890627 Telcon Between Rf Saunders & PE Fredrickson Re 890824 Mgt Meeting.Meeting Requested to Review Results of SALP Program for Facility ML20246L2331989-08-15015 August 1989 Forwards SALP Repts 50-338/89-16 & 50-339/89-16 for May 1988 - May 1989.Overall Performance Satisfactory During Assessment Period ML20245L3381989-08-0707 August 1989 Forwards Insp Repts 50-338/89-24 & 50-339/89-24 on 890710-14.No Violations or Deviations Noted IR 05000338/19890111989-08-0303 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/89-11 & 50-339/89-11 ML20248D9791989-08-0303 August 1989 Forwards Request for Addl Info Re Pipe Stresses Due to Differential Settlement Between Svc Bldg & Main Steam Valve House.Responses Should Be Provided in Forthcoming License Amend Request ML20248D9011989-08-0303 August 1989 Advises That NRC Approval Neither Granted Nor Required in Case of Certification Since Util Assumes Responsibility for Regulatory Compliance w/10CFR55.45(b)(2) ML20248D2571989-07-31031 July 1989 Forwards Corrected Pages 1 & 2 to Insp Repts 50-338/89-12 & 50-339/89-12 Due to Pages Not Being Photocopied Correctly ML20246A3941989-07-28028 July 1989 Forwards Insp Repts 50-338/89-21 & 50-339/89-21 on 890613-14.No Violations or Deviations Noted IR 05000338/19890151989-07-25025 July 1989 Ack Receipt of Re Violations Noted in Insp Repts 50-338/89-15 & 50-339/89-15 ML20247D5211989-07-17017 July 1989 Forwards Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26 & Notice of Violation ML20247D5161989-07-12012 July 1989 Forwards Summary of Mgt Meeting Held on 890619 at Region II Ofc Re self-assessment of Facility.List of Attendees & Handout Encl 1990-09-07
[Table view]Some use of "" in your query was not closed by a matching "". Category:OUTGOING CORRESPONDENCE
Some use of "" in your query was not closed by a matching "".
[Table view]Some use of "" in your query was not closed by a matching "". |
See also: IR 05000338/1990013
Text
%
. *- :OffhCitt);
.,
', jyHs81990
Docket Nos.- 50-338, 50-339
License Nos. ' NPF-4, NPF-7
Virginia Electric'and Power Company
ATTN:' Mr. W. L. Stewart
senior Vice President - Nuclear *
5000 Dom'nien Boulevard
Glen' Allen VA 23060'
Gentiemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-338/90-13 AND 50-339/90-13
This refers. to .the- Nuclear. Regulatory Conunission (NRC) inspection conducted by.
D.- A. -Seymour on ' lay 14-18 and- 29,,1990. The-inspection included a review of
activities autbreized for your North Anna ' facility. At the conclusion:of the
inspection the, findings were discussed with. those members 7 of,your. staff
identified in che' enclosed Inspection Report.
Areas examined - during the inspection are ' identified . in~ thefreport. -Within
these areas, theiinspection consisted of selective examinations of procedures
and representative records, interviewsE with personnel. and observation of
activities in progress. >
The enclosed-Inspection Report identifies activities that appeared to violate
NRC requirements that are not cited;-therefore, a response is not required.
In accordance with 10 CFR 2.790(a), a copy of this . letter and its enclosure -
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, pleash: contact us.
Sincerely,
ORIGINAL SIGNED BY
.
.lOHN P. POTTER .
Douglas M. Collins,-Chief
-
Emergency Preparedness and
Radiological Protection _ Branch
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Inspection Report
l
cc w/ enc 1: (Seepage 2)
9007270000 900628
PDR
E
0 ADOCK 05000338
l PDC
~
,
,
%e o/&_
. _
. .
.,
,
... -.
.- ,
..
,
lVirginiaLElectric an'd' Power ~ Company 2
cc w/ enc 1:
E. W. Harrell-
'Vice President - Nuclear Operations
'
Virginia Electric & Power Company _
5000 Dominion Boulevard-
GlenAllenl,VA 23060
J. P. O'Hanlon _
'Vice President -' Nuclear Services
Virginia-Electric & Power Company
5000 Dominion Boulevard
Glen _ Allen, VA 23060
R. F.:Saunders, Manager <
Nuclear Licensing
Virginia Electric & Power Company. 1
5000 Dominion Boulevard +
-Glen = Allen. VA 23060
G. E. Kane, Station Manager
North Anna Power Station-
P. O. Box 402
Mineral. VA 23117 >
Executive Vice President-
Old Dominion Electric Cooperative <
Innsbrook Corporate Center
4222 Cox Road. Suite 102
-Glen Allen, VA. 23060
W. T. Lough 5
Virginia Corporation Commission .
Division of Energy Regulation
P. O. Box 1197
Richnend,- VA 23209
William C. Porter, Jr. .
County Administrator
!-~" ^3unty
'60
i 23093
.. Maupin, Esq.
. d Williams
F. .
,, 1535
Richmond,144 23212
<
(ccw/ encl: Cont'd on page_3)
. _. _ .
~
.
,
>
- +
9. ~ ,
...
.
. . Virginia' Electric and Power Company 3
I
a
(cc w/ enc 1:- cont'd) >
Patrick-A. O' Hare
Office of the Attorney General
Supreme Court Building
101 North 8th Street
Richmond, VA. 23219
C..M. G.' Buttery, M.D., M.P.H.
Department of Health i
109 Governor Street -
Richmond, VA ~23219 i
Commonwealth of Virginia t
bec w/ encl:
Document Control Desk
NRC. Resident Inspector
U.S. Nuclear Regulatory Commission --s
Route 2, Box 78-A
Mineral, VA 23117 ,
.
-i
, t
i
,
'
1
,
?
i
II: RSS
'
RII:DRSS P I:DR
. 'Q . 48
Se our TDeWer F redr son
6fM/90 6/7790 6fr/90 ;
i
}
.