Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld ML20195G4591999-06-10010 June 1999 Forwards MORs for May 1999 & Revised Repts for Apr 1999 for LGS Units 1 & 2 ML20195H0531999-06-0909 June 1999 Forwards Revised Bases Pages B3/4 10-2 & B3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7701999-06-0707 June 1999 Provides Notification of Change to NPDES Permit PA0052221, for Bradshaw Reservoir Facility Which Supports Operation of Lgs,Units 1 & 2,per EPP Section 3.2 ML20195C7631999-06-0101 June 1999 Notifies NRC That PECO Energy Has Completed Installation of New Large Capacity,Passive Strainers on RHR & Core Spray Sys Pump Suction Lines at Lgs,Unit 2,in Response to Ieb 96-003 ML20195D5381999-05-26026 May 1999 Forwards 1998 Occupational Exposure Tabulation Rept for LGS Units 1 & 2. Encl Is Diskette & Instructions.Rept Is Being re-submitted to Reset 12 Month Time Period.Without Disk ML20195B2821999-05-24024 May 1999 Requests That NRC Distribution Lists for LGS Be Updated. Marked-up Distribution List Showing Changes Is Attached ML20196L2891999-05-20020 May 1999 Provides Status Update of Thermo-Lag 330-1 Fire Barrier Corrective Actions,Iaw Commitments Made in ML20195B2951999-05-20020 May 1999 Forwards Rev 0 to LGS Unit 2 Reload 5,Cycle 6 COLR, IAW TS Section 6.9.1.12.Values Listed Have Been Determined Using NRC-approved Methodology & Are Established Such That All Applicable Limits of Plants Safety Analysis Are Met 05000352/LER-1999-003, Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv1999-05-19019 May 1999 Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv 05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 9904191999-05-18018 May 1999 Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 ML20206E2001999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept (Non- Radiological) for Limerick Generating Station,Units 1 & 2. Rept Submitted IAW Section 5.4.1 of App B of Fols,Epp (Non- Radiological) & Describes Implementation of EPP for 1998 ML20206D8801999-04-27027 April 1999 Forwards Rev 2 to LGS Unit 1 Reload 7,Cycle 8 COLR, IAW TS Section 6.9.1.12.COLR Provides cycle-specific Parameter Limits for Noted Info ML20206A5461999-04-21021 April 1999 Responds to Conference Call Between Util & NRC on 990420,re TS Change Request 98-07-2,revising TS Section 2.0 to Incorporate Revised MCPR Safety Limits.Attached Ltr Contains Info Requested ML20205T0441999-04-17017 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept 15, IAW TS Section 6.9.1.7.REMP for 1998,confirmed That LGS Environ Effects from Radioactive Release Were Well Below LGS TSs & Other Applicable Regulatory Limits ML20205Q7581999-04-15015 April 1999 Forwards Response to RAI Re ISI Program First & Second 10-Yr Interval Relief Requests.Revs to Identified by Vertical Bar in Right Margin 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K3671990-09-14014 September 1990 Informs of Revised Commitments Re Crud Induced Localized Corrosion Related to Fuel Cladding Failures.Deep Bed Demineralizers Installation Activities Will Be Performed in Unit 1 Subsequent to Third Refueling Outage ML20065D4421990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Proposed Schedules for Operator Licensing Exams, Requalification Exams & Generic Fundamental Exams Encl ML20064A5831990-09-0707 September 1990 Responds to Violations Noted in Insp Repts 50-352/90-17 & 50-353/90-16 Re Differential Pressure for Pumps.Corrective Actions:Licensee Will No Longer Use Expanded Ranges as Acceptance Criteria for Inservice Testing Program Tests ML20064A4821990-08-31031 August 1990 Forwards Rev 20 to Emergency Plan.Changes Necessitated by Annual Emergency Plan Update & Administrative in Nature ML20059E6071990-08-29029 August 1990 Forwards Semiannual Effluent Release Rept,Jan-June 1990 & Rev 8 to Odcm ML20059B0751990-08-24024 August 1990 Forwards Rev 0 to Updated FSAR for Limerick Generating Station,Units 1 & 2,Vols 1-19.W/one Oversize Encl. Proprietary Vol 7A (App 3B) Withheld (Ref 10CFR2.790) ML20064A6471990-08-24024 August 1990 Forwards Public Version of Revised Epips,Consisting of Rev 10 to EP-101,Rev 2 to EP-112,Rev 13 to EP-208,Rev 11 to EP-230 & Rev 22 to EP-291 ML20059E9861990-08-24024 August 1990 Provides Justification for Applicability of Reload Methodology Topical Repts to Facility & Requests NRC Approval for Application of Reload Analysis Methodologies ML20058N9591990-08-13013 August 1990 Forwards Revised Response to Violations Noted in Insp Repts 50-352/90-13 & 50-353/90-13.Corrective Actions:Ltr Issued to All Plant Personnel Providing Instructions on Proper Use & Handling of Controlled Documents in Controlled Locations ML20058N1771990-08-10010 August 1990 Responds to NRC Re Unresolved Items Noted in Insp Repts 50-352/90-80 & 50-353/90-80.Plant-specific Technical Guideline Has Been Revised to Ref Contingency Numbers Rather than Transient Response Implementation Plan Procedures ML20063P9461990-08-10010 August 1990 Provides Plans for Ultimate Disposition of Recirculation Inlet Nozzle to Safe End Weld Indication.Alternative Corrective Actions to Disposition Nozzle to Safe End Weld Indication Include Repair by Weld Overlay W/O Monitoring ML20058N1281990-08-0909 August 1990 Forwards Correction to Rev 10 to EPIP EP-234, Obtaining Containment Gas Samples from Containment Leak Detector During Emergencies ML20058N1991990-08-0909 August 1990 Advises of Change of Address for Correspondence Re Util Operations.All Incoming Correspondence Must Be Directed to One of Listed Addresses ML20058P1261990-08-0909 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Limerick Units 1 & 2 & Rev 1 to June 1990 Rept ML20058M9951990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-352/90-15 & 50-353/90-14.Corrective Actions:Personnel Counseled on Importance of Procedure Compliance & Operations Manual Revised ML18095A3761990-07-26026 July 1990 Forwards Decommissioning Repts & Certification of Financial Assurance for Plants ML20055J0241990-07-26026 July 1990 Forwards Response to NRC Regulatory Effectiveness Review Rept for Plant.Response Withheld Per 10CFR73.21 ML20056A9731990-07-25025 July 1990 Forwards Facility Written Exam Comments for NRC Insp Repts 50-352/90-10 & 50-353/90-11.Written Exam for Reactor Operator & Senior Reactor Operator Considered Comprehensive & Thorough ML20055H8511990-07-24024 July 1990 Responds to NRC 900720 Request for Addl Info Re Util 900516 Request for Exemption from Full Participation During 1990 Onsite/Offsite Emergency Exercise.Nrc Region I & FEMA Support Feb 1991 Exercise,Per 900718 Telcon ML20055H8331990-07-20020 July 1990 Submits Change of Addresses for Correspondence Re Util Nuclear Operations ML20055H0231990-07-12012 July 1990 Forwards Public Version of Revised Epips,Including Rev 10 to EP-210,Rev 19 to EP-231 & Rev 13 to EP-237 ML20044A1041990-06-22022 June 1990 Forwards Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Spec Change Requests 90-03-0 & 90-04-0, Revising Surveillance Requirement 4.9.6.1 for Section 3.9.6 Refueling Platform Re Main Hoists/Auxiliary Hoists ML20043J0371990-06-20020 June 1990 Forwards Description,Scope,Objectives for Plant 1990 Annual Emergency Exercise Scheduled for 900920,per 890809 Ltr.Util Will Submit Revised Objectives for Exercise to Reflect Limited Participation,If Exemption Request Approved ML20043H6081990-06-19019 June 1990 Corrects 900427 Response to Generic Ltr 87-07, Info Transmittal of Final Rulemaking for Revs to Operator Licensing - 10CFR55 & Conforming Amends. ML20055C7621990-06-18018 June 1990 Informs NRC of Plans Re Licensing of Senior Reactor Operators (Sros) Limited to Fuel Handling at Plants.Util in Process of Implementing New Program for Establishment & Maint of Licensed SROs Limited to Fuel Handling at Plants ML20055C7471990-06-15015 June 1990 Requests That Listed Operator Licenses Be Discontinued ML20043G1331990-06-14014 June 1990 Responds to NRC 900614 Ltr Re Violations Noted in Insp Repts 50-352/90-13 & 50-353/90-12.Corrective Actions:Boxes of Completed Procedures Improperly Stored Shipped to Util Storage Vault by 900406 ML20043G9981990-06-12012 June 1990 Forwards, Core Operating Limits Rept for Unit 1 Reload 2, Cycle 3 & Core Operating Limits Rept for Unit 2,Cycle 1. Repts Submitted in Support of Tech Spec Change Request 89-13 Re Parameter Limits,Per Generic Ltr 88-16 ML20043G7311990-06-0808 June 1990 Provides Addl Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. Welds Examined During Last Refueling Outage Addressed ML20043G7501990-06-0808 June 1990 Requests Withdrawal of 900516 Tech Spec Change Request 90-11-1 Re Extension of Snubber Visual Insp Period.Change No Longer Needed Since Unit Shutdown on 900605 & Visual Insp of Three Affected Snubbers Performed on 900607 ML20043F8021990-06-0808 June 1990 Forwards Monthly Operating Repts for May 1990 for Limerick Units 1 & 2 & Revised Pages to Mar 1990 Rept for Unit 2 & Apr 1990 Rept for Units 1 & 2 ML20043D8101990-05-29029 May 1990 Forwards Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Specs Change Request 89-07 to Relocate Radiological Effluent Tech Specs to ODCM or Process Control Program,Per Generic Ltr 89-01 ML20043E6571990-05-25025 May 1990 Forwards Public Version of Rev 135 to Epips,Including Rev 11 to EP-202,Rev 14 to EP-282,Rev 12 to EP-284,Rev 8 to EP-312 & Rev 9 to EP-410.W/DH Grimsley 900607 Release Memo ML20055C5121990-05-18018 May 1990 Provides Info Inadvertently Omitted in Re Property Insurance Coverage for Plants.Limerick Generating Station Unit 2 Should Have Been Ref as Being Included Under Insurance Coverage ML20043A7881990-05-16016 May 1990 Requests Exemption from Requirement to Perform Biennial full-participation Onsite/Offsite Emergency Exercise for Plant During 1990 ML20055C4851990-05-15015 May 1990 Forwards Annual Financial Repts for 1989 for Philadelphia Electric Co,Pse&G,Atlantic Energy,Inc & Delmarva Power & Light Co ML20043B1501990-05-14014 May 1990 Forwards Public Version of Rev 134 to Epips,Consisting of Rev 10 to EP-230,Rev 4 to EP-255,Rev 1 to EP-302,Rev 7 to EP-304 & Rev 3 to EP-314.Release Memo Encl ML20043A2361990-05-14014 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Repts 50-352/90-07 & 50-353/90-06.Corrective Actions:Sampling Review of Plant Baseline Data Will Be Performed to Ensure Product Code Number Correctness for Components ML20042F4481990-05-0101 May 1990 Advises That Plant Transient Response Implementing Plan Procedures & Related Ref Matls Provided to Dj Florek,Nrc Region I,On 900430.Documents Provided in Response to NRC 900327 Ltr Re Preparation for Planned NRC Insp of Procedure ML20042E8741990-04-27027 April 1990 Responds to Generic Ltr 87-07, Info Transmittal of Final Rulemaking for Revs to Operator Licensing. Certifies That Limerick Operator Requalification Training Program Renewed on 900125 & Peach Bottom Subj Program Renewed on 890622 ML20042E0881990-04-0909 April 1990 Forwards Addl Info Re 891011 Tech Spec Change Request 89-09 to Reduce Number of Suppression chamber-to-drywell Vacuum Breakers Required to Be Operable ML20042E0201990-04-0606 April 1990 Forwards Vols 1-3 to Preservice Insp Summary Rept, & Books 1-3 to Form NIS-2 for Preservice Insp Interval 1985-1990, Per 10CFR50.55a(g) & ASME Code Section Xi,Paragraph IWA-6230 ML20012E2151990-03-20020 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants,' for Peach Bottom.Response for Limerick Generating Station Will Be Provided by 900504 ML20012C2931990-03-12012 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey, Per 900118 Request ML20012D9511990-03-0909 March 1990 Forwards Public Version of Revised Epips,Including Rev 10 to EP-203,Rev 12 to EP-317 & Rev 18 to EP-292.W/DH Grimsley 900322 Release Memo ML20012A3631990-03-0101 March 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Rept 50-353/89-32 on 891211-15.Corrective Action:Util Will Document Both Receipt & Shipment of Fuel Loading Chambers on Next Semiannual Doe/Nrc Form 742 ML20012A1151990-02-28028 February 1990 Forwards Semiannual Effluent Release Rept 11,Jul Through Dec 1989 & Annual Tower 1 Joint Frequency Distributions of Wind Direction & Speed by Atmosphere Stability,Rept 5 for 1989. W/O Annual Tower 1 Rept ML20012A2621990-02-16016 February 1990 Forwards Public Version of Revs 124 & 125 to Epips, Consisting of Rev 9 to EP-201,Rev 20 to EP-291 & Rev 21 to EP-291 ML20006E7731990-02-16016 February 1990 Requests Discontinuation of Listed Operator Licenses ML20006E6511990-02-15015 February 1990 Discusses & Forwards Results of Field Verification Testing of Unit Spds,Per Licensee Commitment to Submit Rept within 30 Days After Unit SPDS Declared Operational.No Significant Problems Encountered W/Spds During Power Ascension Testing 1990-09-07
[Table view] |
Text
- - _ _ - _ _ . _ . _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - .
e s
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 1215) 841-4502 S. J. KOW A LSKI VicE PFtFBIDENT
.m.............. May 27,1988 Mr. Edward C. Wenzinger, Chief Docket: 50-352 Projects Branch No. 2 "
Division of Reactor Projects USNRC Region I e ATTN: Doctment Control Desk Washington, DC 20555
Subject:
1.E.Bulletin 85-03 "Motor-0perat' a Valve Ccmnon Mode Failures During Plant Trar lents Due to Inproper Switch Settings" Response to Request for Adr.ltional Infonnation and Supplement 1 Limerick Generating Statlan Unit 1
References:
(1) S. J. Kowalski (Pero) letter to E. C. Wenzinger (NRC),
dated April 29, 1988 (2) E. C. Wenzinger (NRC) letter to J. S. Kemper (PECo),
dated March 29, 1988 (3) J. S. Kenper CPECo) letter to W. T. Russell (NRC),
dated Wvenber 17, 1987 (4) J. S. Kemper (PECo) letter to T. E. Murley (NRC),
dated October 2, 1986 (5) I.E.Bulletin 85-03 Supplement 1, dated April 27, 1988
Dear Mr. Wenzinger:
The purpose of this letter is twofold. First, it responds to
- your request for additional information (RAI) to facilitate your review of our Limerick I.E.Bulletin 85-03 response. Second, it provides our response to I.E.Bulletin 85-03 Supplement 1.
In accordance with the ccmn'tment made in our Referenco (1) letter, the attached docunent provides a complete response to each RAI Item in your Reference (2) letter. This docunent supplements thoser previously submitt.ed by References (3) and (4).
Supplement 1 of I.E.Bulletin 85-03 was issued to clarify the NRC position on valve mispositioning. The notor operated valve program established for Linwrick Unit 1 Includes consideration of mispositioning of valves prior to performing their Intended safety function. This was acconplished by evaluating each valve starting in both the open and closed positions prior to noving to its required saf~ety position. The most I
conservative set of conditions was then selected as the basis fo. setting N
I and maintaining switches to assure valve operability. Therefore, our responses to the RAI Items on inadvertent operation and our previous f
submittals satisfactorily denonstrate cenpliance with the requirements I l of IEB 85-03 Supplement 1. \
t 8806020031 880527 i i FMG A@OCK 05000352 _
If you have any questions or require any additional infornation regarding our 1.E.Bulletin 85-03 program, please do not hesitate to contact us.
Sincerely, O W f 0yk 2I" 33em TSN/pdO5188805 Enclosure Report Copy to: Addressee LGS Resident Site Inspector NRC Division of Operational Events Assessment NRC, Document Control Desk Washington, DC 20555 l
t I
i l
=-. -- - - - - - -_ _.
.0 RESPONSE TO USNRC REQUEST FOR ADDITIONAL INFOPJMTION I.E. BULLETIN 85-03 RESPONSE FOR LIMERICK 1, 2 i
The following provides PECo's response to the USNRC request for additional Information dated March 29, 1988. Each specific requested item is restated followed by the PECo response.
- 1. . NRC Request if MOVATS is planned for appilcation to scme MOVs which are not included in its data base, cmmit to and describe an alternate method for determining the extra thrust necessary to overcome t
pressure differentials for these valves.
PECo Response PECo is not using the MOVATS data base in establishing the MOV thrust requirements for a given differential pressure.. However, we are making use of MOVATS equipment to determine stem thrust and l set torque switches based on minimtm required thrust values determined by the valve vendors. We consider that the valve vendors have an experience base much larger than that of MOVATS.
This experience base includes the use of motor-operated valves in diverse industries such as petrochemical refinerles and fossil power stations.
The Limerick Unit 1 MOVATS test program was completed prior to the issuance of 1.E.Bulletin 85-03. In lieu of re-MOVATS '
1 testing all subject valves under differential pressure conditions, we Justified our selected thrusts and resulting torque switch settings by a :crnbination of the follcwing:
(a) For most valves, margin exists in the original design differential pressure (D-P) with respect to the D-P corresponding to the maximtm design basis.
. (b) For all valves, margin exists in the actual stan thrust with respect to the minimtm required for maximtm D-P conditions.
(c) Actual pre-operational or routine surveillance testing.
(d) Supplemental D-P testing of selected MOVs.
Our response of 11/17/87 provided pertinent Information on each of these items. The data collected for this effort confirms the adequacy of the torque switch setting techniques and, to the extent practical, the vendor's methodology to predict the necessary stem force for a given differential pressure.
~*
2.- NRC Request 1
Revise the table of the response dated 10/2/86 to include values of differential pressure for opening the follmir;g F0Vs, or
. Justify exclusion of those pressures. As required by Action Item (a) of the bulletin, asstme inadvertent equipment operations.
(a) HPCI FOV HV-1F004 is sh w n normally open in Zone F-3 of Drawing M-55 Sheet 1 Revision 32, and as MOV 3 on Page 68 of BWROG Report NEDC-31327 dated Septenter 1986. How would suction frcm the CST be ensured if this MOV were to be (a) actuated Inadvertently to the closed position upon Intended initiation of the system or (b) left closed inadvertently?
(b) RCIC MOV HV-1F010 is shown normally open in Zone E-2 of '
Drawing M-49 Sheet 1 Revision 28, and as MOV 3 on Page 72 of the BWROG Report. The question in item 2(a) above applies here also.
(c) HPCI MOV HV-1F072 Is shcwn normally open In Zone C-6 of Drawing M-55 Sheet 1 Revision 32, and as MOV VI on Page 71 of the BWROG Report. How would exhaust fraa the turbine to the suppression pool be ensured if this MOV were to be (a) actuated Inadvertently to the closed position upon Intended initiation of the system or (b) left closed inadvertently?
(d) RCIC MOV HV-1F060 Is shown normally open in Zone B-5 of Drawing M-49 Sheet 1 Revision 28, and as MOV VI on Page 74 of the BWROG Report. The question in Itan 2(c) above applies here also.
PECo Response Inadvertent valve positioning, particularly t. hose performed during and directly counter to safety system operation are extremely l
unilkely given the extensive training that control room operators and supervision receive. Postulated actions which are directly counter to proper safety system function are considered beyond design basis.
A positive feature of the Limerick program with respect to Inadvertent i operation is that the OPEN and CLOSE torque switch settings are identical.
Therefore, an operator output force at least equal to that required to fully close the valve against maxinun pressure is available to fully open
, the valve when actuated. This progran conservatism helps to assure l l recovery frcm Inadvertent valve operation. {
l
Ca) The HPCI condensate storage tank (CST) suction valve HV-55-1F004 Is normally open to lineup the CST to the HPCI pm p suction. However, the CST is a non-safety related non-seismic Category 11 structure. On loss of the CST, pmp suction autcmatically transfers to the Suppression Pool which serves as the HPCI system safety-related water supply. Therefore, ptmp suction Jrcm the CST does not have to be ensured since during a design basis accident (DBA) the CST is not asstmed to be available. '
The resulting differential pressure across the valve, if it were inadvertently out of position and called upon to open, would correspond to that generated by the CST static head.
This differential pressure is less than the 23 psid ccmputed for the closing direction and well within the capability of the nutor-operated valve assently.
If the valve were inadvertently closed while the system is aligned with the CST, the HPCI pwp suction pressure instrumentation would initiate a trip of the HPCI turbine so as not to damage the turbine driven pmp. Once the cause of 3
the trip was recognized (e.g. via control rocm position Indication), pump suction would be realigned and the HPCI turbine restarted.
(b) Our response to your request regarding the RCIC condensate i
storage tank (CST) suction valve HV-49-1F010 fo11cws the sane logic as that provided for the HPCI CST suction valve.
1 (c) The HPCI turbine exhaust Isolation valve HV-55-1F072 is f normally open to provide a flowpath for turbine steam exhaust to the suppression pool. If this valve were l
inadvertently closed, a VALVE NOT FULL OPEN ALARM and HPCI OUT OF SERVICE ALARM would actuate in the control rocn.
Therefore, the mispositioning of this valve will i be inmediately recognized and responded to by control room i personnel. Inadvertent operation of this valve is considered extremely remote since the control rocm handswitch has a keylock permissive (shift supervision controls access to this key).
If the valve were inadvertently closed while the system is in operation, the HPCI turbine exhaust pressure instrtmentation
- j. would initiate a trip of the HPCI turbine so as not to overpressurize the low pressure piping. Once the cause of the trip was recognized, turbine exhaust would be realigned and the HPCI turbine restarted. As stated earlier, several alarms would be received before the valves were ccrnpletely shut which would Inmediately alert the control room operators to the problem.
l
,-,-,~.-,m,-,--,w-----,,---wn- --nr-~ ,n- , , , ,.-,-,mne,m w- . w - ,rrm 1,w -w--+wwr nn.~,-,,, , - - - , -v- w-,, ,,
- l (d) Our response to your request regarding the RCIC turbine exhaust isolation valve HV-49-1F060 folicws the same logic as that provided for the HPCI turbine exhaust ,
Isolation valve.
- 3. NRC Request ,
Revise the table of the response dated 10/2/86 to include MOVs HV-124 and HV-125, or justify their exclusion. These valves are shown normally open-In series in Zone H-6 of Drawing M-55 Sheet 1-Revisic 32. Simliar valves are not identified in the BWROG Report. How would suction to the HPCI and RCIC systems be ensured if ono.of these valves were to be (a) actuated inadvertently to the closed positiv upon Intended initiation of the system or (b) left closed inadvertently?
PECo Response HV-124 and HV-125 have not been addressed by PEco's Limerick 1.E.
Bulletin 85-03 response based on the following considerations:
(a) HV-124 and HV-125 are infrequently operated maintenance valves that permit work on piping downstream of the CST.
While the HV-124 and HV-125 motor operators are powered from an ernergency motor control center (MCC), the valves and the piping they are Installed in are non-safety related. The CST is a non-safety related water supply. Therefore, ECCS ptrnp suction frcrn the CSI need not be assured during a DBA.
(b) Several checks are performed to assure these valves are properly positioned. First, these valves are included in a monthly ECCS lineup verification check. Secondly, the routine HPCI and RCIC system surveillance testing required by our Technical Specifications verify the proper valve position by derronstrating rated flow from the CST. We believe that these checks and the administrative controls in place provide adequate assurance against inadvertent positioning.
(c) If either of these valves were mispositioned closed, the HPCI and RCIC turbines would trip on low pum suction pressure. Punp suction would be inTnediately diverted by control room operators to the safety related suppression pool.
i
- 4. NRC Request Resolve a discrepency in the table of the response dated 10/2/86, for the following two MOVs with sintlar functions. Also consider the effect of Note (o) on Page 66 of the BWROG Report about providing differential pressures for test valves.
l i _, --_--- - -_-_. --- . , . , . . - _ _ . , _ . - , - - - _ - _ - - ~ - _ - _ . - - - - , _
, _5 (a) HPCI MOV HV-1F007 is shown nonna11y open in Zone D-4 of Drawing M-55 Sheet 1 Revision 32, and as MOV 8 on Page 68 of the BWROG Report. Differential pressure is given for opening only.
(b) RCIC MOV HV-1F012 is shown nonna11y open in Zone D-4 of Drawing M-49 Sheet 1 Revision 28, and as MOV 8 on Page 72 of the BWROG Report. Differential pressure is given for closing only. How would injection to the reactor vessel be ensured if this valve were to be (a) actuated inadvertently to the closed position upon Intended initiation of the systeri or (b) lef t closed inadvertently?
PECo Response The noted discrepancy regarding the design basis safety function of the injection valve test valves in the HPCI and RCIC systans was due to an oversight in our response dated 10/2/86 which vm have subsequently corrected in our response dated 11/17/87. The stated differential pressures should apply in both cases to valve opening rather than closirg. We included these and several other valves In our Linorick I.E.Bulletin 85-03 program specifically to address inadvertent valve operation beyond the original scope recorrended by the BWROG. In this regard, we have already addressed Supplanent 1 of I.E.Bulletin 85-03, dated 4/27/88.
- 5. NRC Request Revise the table of the response dated 10/2/86 to include RCIC Trip and Throttle Valve HV-112, or Justify its exclusion. This valve is shown as a MOV on FSAR Figure 5.4-9 Revision 43, 5/85, and as MOV X on Page 74 of the BWROG Report.
PECo Response The RCIC Turbine Trip and Throttle Valve, KV-50-112, does not have a safety function affecting the valve nntor-operator. The motor-operator is used to only open the valve (reset function) under negligible differential pressure due to equalizing orifices across the valve. The valve's safety function to close is accomplished by a separate spring mechanism. Section 3.3.4.15 of BWROG Report NEDC 31322 further delineates the technical Justification for exclusion of this valve.
The RCIC Trip and Throttle valve is operated during Technical Specification system survelliance testing. This testing provides assurance that the RCIC Trip and Throttle Valve operates properly including recovery from an inadvertent trip. Recovery procedures for an inadvertent trip call for the upstream steam admission valve HV-49-1F045 to be closed prior to resetting the Trip and i
Throttle Valve.
- 6. NRC Request The proposed program for action items b, c, and d of the bulletin is incomlete. Provide the following details as a mininun:
(a) ccnmltment to justify continued operation of a valve detennined to be Lnoperable Cassuned typo),
(b) description of nothod possibly needed to extrapolate valve stem thrust determined by testing at less than maximun differential pressure, (c) consideration of pipe break conditions as required by the bulletin,.and (d) stroke testing when necessary to neet bulletin requirenents.
PECo Response (a) In our response dated 11/17/87 to bulletin item (b), we demonstrated that the subject motor-operated valves had the design capabilities to function as required under design basis conditions. Because these valves met their operability requirenents, there is no need to justify continued operation of a valve' detennined to be Inoperable.
(b) As we described in our response to RAI Itsn 1), PECo justifled the adequacy of the subject valve torque switch settings via an engineering review of design margins and actual differential pressure testing on selected MOVs.
(c) Pipe break conditions were considered in the development of the differential pressures and the resultant thrust requirements.
As described in our response dated 11/17/87, PEco has perforred supplemental testing which closed the HPCI/RCIC stean line Isolation valves with their respective turbine running and acting as a sink for the downstream pressure.
This Is the closest sinulation of actual pipe break conditions that we can safely duplicate and justify.
In addition, we are following and providing input to the Idaho National Engineering Laboratory (INEL) progran to address this concern as USNRC Generic Issue 87. Upon I corrpletion of this program, we will consider reccnmendations to improve valve reliability.
(d) The valves were stroke tested as a matter of course during the initial limit switch and torque switch setting process.
Additional stroke testing is performed as part of the ISI program, surveillance testing and required post-maintenance checkout process. The above actions provide the necessary stroke testing to meet bulletin requirements.
TSN/pdO5178803