NRC-84-0135, Forwards Proprietary & Nonproprietary Revised Draft Interim Justification Position for Seismic & Environ Qualification of In-Core ... & Westinghouse Authorization Ltr & Affidavit.Proprietary Version Withheld (Ref 10CFR2.790)

From kanterella
(Redirected from ML20101K234)
Jump to navigation Jump to search
Forwards Proprietary & Nonproprietary Revised Draft Interim Justification Position for Seismic & Environ Qualification of In-Core ... & Westinghouse Authorization Ltr & Affidavit.Proprietary Version Withheld (Ref 10CFR2.790)
ML20101K234
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 12/21/1984
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19274C574 List:
References
SLNRC-84-0135, SLNRC-84-135, NUDOCS 8412310269
Download: ML20101K234 (3)


Text

.

. 1 SNUPPS Standard;aed Nuclear Unit Power Plant System l 5 Choke Cherry Road Rockville, Meryland 20850 Nichofas A. Petrick (301)869 4010 Executive Director December 21, 1984 SLNRC 84- 0135 FILE: 0278 SUBJ: Equipment Qualification Justifications for Interim Operation (JIO)

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Docket Nos.: STN 50-482 and STN 50-483

Reference:

SLNRC 84-0101, dated June 29, 1984: Same Subject

Dear Mr. Denton:

I The enclosure to this letter contains information proprietary to Westing-house Electric Corporation as discussed below.

Current equipment qualification program information and equipment instal-lation plans at the SNUPPS plants - Callaway Plant Unit No. I and Wolf I

Creek Generating Station Unit No. 1 - require the updating of the Justi-fication for Interim Operation (JIO) applicable to NSSS qualification programs ESE-43 and ESE-44, "Incore Thermocouples, Connectors and Refer-ence Junction Box". Enclosed is a revised JIO for ESE-43 and 44 equip-ment.

The JIO reflects current Westinghouse program identification:

ESE-43A, Thermocouples; ESE-43B, Connect o rs (LEMO); ESE-43C, Adaptors (Thermoelectric); ESE-44A, Reference Junction Box; and ESE-44B, Adaptor Cable Splice.

The JIO has been revised to specifically discuss confidence testing on the ESE-43C connector and to permit the SNUPPS plants to use either the old-style or a new-style Reference Junction Box. The seismic testing on the ESE-43C connector was performed to the same test response spectra reported in the previous JIO for the LEMO connector; and the new-style Reference Junction Box was mentioned in the previous JIO without a discus-sion of qualification status. Wolf Creek Generating Station will have the new-style Reference Junction Box installed prior to fuel load. Callaway plant currently has the old-style box installed.

8412310269 841221 PDR ADOCK 05000482 A PDR

[

f. - * * ,ffk, R
eh4 d 0f,q g } ' ) Pol llortfafbd i 00 'get A? TIS A/6/d
  • a _ - _____ _-

.SLNRC 84-

. Pega 2.

With the enclosed revision to the ESE-43 and ESE-44 JIO, all outstanding JI0s applicable to the SNUPPS plants are up-to-date and adequate to support safe plant operation until qualification programs are completed.

At the present time all required equipment - qualification programs for SNUPPS Balance of Plant equipment have been completed, and all. required NSSS qualification programs have been completed by Westinghouse ' with the exception of~two, ESE-43 and HE-7 which are currently scheduled for completion by the second quarter of 1985. Of course, the qualification programs for safety-related electrical equipment in harsh environments are not considered complete until the SNUPPS Utility independent review of documents has been performed. ESE-43 qualification status is discussed in the enclosure. The HE-7, " Crosby Position Indication Device" qualifi-cation program experienced a test setup failure, which was not related to environmental or seismic qualification, but which required the test program to be repeated (i.e. excessive current applied during testing caused failure of the test specimen).

Enclosed are:

1. 3 copies of SNUPPS Interim Justification Position for the Seismic and Environmental Qualification of the Incore Thermocouples, Connectors, and Reference Junction Box (ESE-43 and ESE-44) (Proprietary).
2. 3 copies of SNUPPS Interim Justification Position for the Seismic and Environmental Qualification of the Incore Thermocouples, Connectors and Reference Junction Box (ESE-43 and ESE-44) (Non-Proprietary).

Also enclosed is a Westinghouse authorization letter, CAW-84-117, and the accompanying affidavit.

As item 1 contains information proprietary to Westinghouse Electric Corporation, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the Commission's regulations.

Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public -disclosure in accordance with 10CFR Section 2.790 of the Commission's regulations.

Correspondence with respect to the proprietary aspects of the Application for Withholding or the supporting Westinghouse affidavit should reference CAW-84-117 and should be addressed to R. A. Wiesemann, Manager, Regulatory and Legislative Af fairs, Westinghouse Electric Corporation, P. O. Box 355, Pittsburgh, Pennsylvania 15230.

Ver tr ly yours,

%;:^.=

N' holas A. Petrick 6

MHF/nid13b30 Enclosure cc: See page 3.

SLNRC 84-

- Page 3.

cc: D. F. Schnell UE G.-L. Koester KGE J. M. Evans KCPL H. Bundy .USNRC/WC J. Neisler/B. Little USNRC/ CAL W. L. Forney USNRC/RIII D. R. Hunter .USNRC/RIV

___.__,._m._._.__. . . _ _ . _ . .