Forwards Updated LER 82-009/03L-1
ML20050D616
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/22/1982
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20050D617 List:
References
K82-519, NUDOCS 8204120367
Download: ML20050D616 (1)


Text

..

a.

TOLEDO

% EDISON March 22, 1982 Log No. K82-519 File: RR 2 (NP-33-82-11)

Docket No. 50-346 License No. h*PF-03 e so A

\\

Mr. James G. Keppler D g)$'pfh Regional Director, Region III 7/'

"\9Ny Office of Inspection and Enforcement .c Tg U. S. Nuclear Regulatory Commission G?d -

799 Roosevelt Road ]A ty# f@.

p#

Glen Ellyn, Illinois 60137 D N D

/>).

Dear Mr. Keppler:

fg \ \Y Enclosed are three copies of Revision 1 to Licensee Event Report 82-009. The revision to the report is indicated by a "1" in the left margin to reficct the correct codes in blocks 12 and 13. There has been no change to the supplemental information sheets.

Please replace your previous copies of the LER form only with the attached revision.

Yours truly.

[ Q. W*

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/lj k Enclosure cc: Mr. Richard DeYoung, Director