ML20041D541

From kanterella
Jump to navigation Jump to search
Forwards LER 82-005/03L-0
ML20041D541
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/24/1982
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20041D543 List:
References
K82-349, NUDOCS 8203050392
Download: ML20041D541 (1)


Text

a O'

TOLEDO

%mm EDISON February 24, 1982 Log No. K82-349 File: RR 2 (NP-33-82-06)

Docket No. 50-346 License No. NPF-3 4 (O Mr. James G. Xeppler O

y Regional Administrator, Region III BECsty&O I i Office of Inspection and Enforcement h

$4 g O s 7 g'--,

U. S. Nuclear Regulatory Commission -

g, 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

D g

Reportable Occurrence 82-005 Davis-Besse Nuclear Power Station Unit 1 Date of Occurrence: January 26, 1982 Enclosed are three copies of Licensee Event Report 82-005 with a supplemental in-formation sheet which are being submitted in accordance with Technical Specification 6.9 to provide 30 day written notification of the subject occurrence.

Yours truly, f D. W *y/Ni'M Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/ljk Enclosure l

l cc: Mr. Richard DeYoung, Director l Office of Inspection and Enforcement Enc 1: 30 copies Mr. Norman Haller, Director Office of Management and Program Analysis Encl: 3 copies Mr. Luis Reyes

., NRC Resident Inspector Encl: 1 copy l

l THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8203050392 820224 r

DRADOCK05ooo$$ p MAR 11982 gi)

, _ .