Text

~ _

. 9 .

9 TOLEDO

%s EDISON December 30, 1982 Log No. K82--2082 File: RR 2 (NP-33-81-37)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler, Regional Administrator, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Enclosed are three copies of Revision 6 to Licensee Event Report 81-031, including supplemental information cheets. The changes to the report are indicated by a "6" in the left margin of each page.

Please destroy your previous copies of this report and replace with the attached revision.

Yours truly, w, o*7 Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/lj k Enclosures cc: Mr. Richard DeYoung, Director Office of Inpection and Enforcement Encl: 30 copies Mr. Norman Haller, Director Office of Management and Program Analysis Encl: 3 copies Mr. Tom Peebles NRC Resident Inspector Encl: 1 copy 8301070292 821230 i PDh ADOCK 05000346 O PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652