Forwards Response to NRC 820816 Ltr Re Violations Noted in IE Insp Rept 50-247/82-14.Corrective actions:post-maint Tests/Insp Per COL-51 Will Be Ensured.All post-maint Activities After 821101 Will Be Verified
ML20027C184
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/15/1982
From: Otoole J
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20027C182 List:
References
NUDOCS 8210130559
Download: ML20027C184 (1)


Text

o e ..6 . - J'ohn D. O'Toole Vse Presx3ent Consohdated Edison Cornpany of New York. Inc.

4 Irving P! ace, New York, NY 10003 Telephone (212) 460 2533 September 15, 1982 Re: Indian Point Unit No. 2 Docket No. 50-247 Mr. Richard W. Starostecki, Director Division of Project and Resident Programs U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pa. 19406

Dear Mr. Starostecki:

This refers to I.E. Inspection 50-247/82-14, conducted by Messrs T.

Rebelowski and P. Koltay of your office on July 1 through 31, 1982 of activities authorized by NRC License No. DPR-26 at Indian Point Unit No.

2. Your August 16, 1982 letter stated that it appeared that one of our activities was not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation enclosed therewith as Appendix A.

Our response to the item of non-compliance is presented in Attachment A to this letter.

Our response is being provided pursuant to Section 182 of the Atomic Energy Act of 1954 as amended. Should you or your staff - have any questions, please contact us.

Ve truly yours,

/

m -f' fy Subscribed and sworn to before me this /.5 iay of September, 1982.

DAVID WATSON

~/ piotary Public State of New York r4(/ffryt- No. 034604876 Quallfled in Bronx Count Notary Public Conwmslon Empires March W,y19#3 l

8210130559 821006 PDR ADOCK 050CO247 0 PDR

e *

. .i s ,

n 50-247/82-14 ATTACHMENT A RESPONSE TO NOTICE OF VIOLATION APPENDIX A VIOLATION Technical Specification 6.8.1 requires that written procedures be established and implemented. Procedure COL-51, Locked Valves, Revision 14, requires the licensee to verify the position of the valves identified in this procedure. Chain and padlock are to be applied to each of these valves.

Contrary to the above, on July 14, 1982, the inspector identified Valve

.No. 1279, a recirculating bypass valve on the No. 23 Charging Pump, which appears on Procedure COL-51, as unchained and not padic:ked.

This is a Severity Level V Violation (Supplement I).

RESPONSE

When Valve No. 1279 was found unlocked during the inspection on July 14, 1982, con Edison verified that the valve was in the correct position and then locked the valve in accordance with COL-51. It should be noted that Procedure COL-51, Locked Valves, requires a monthly check for compliance and the unlocked condition would have been detected and corrected in accordance with station procedure.

On July 8, 1982 the valve had not been locked at the completion of a Post Maintenance Test / Inspection and return tb service of No. 23 Charging Pump. The test did not include a review requirement for compliance with COL-51.

To avoid such a violation in the future, Con Edison will ensure that Post Maintenance Tests / Inspections provide for the requirements of COL-51.

All Post Maintenance Tests / Inspections issued after November 1, 1982 will contain a provision for verification by Operations that the requirements of COL-51 have been met. In the interim the Senior Watch Supervisors have been instructed to conduct appropriate reviews of equipment for compliance with COL-51 prior to returning equipment to service.