MONTHYEARML20217B3331999-10-0707 October 1999 Responds to 990825 Telephone Call Re Presense of Polychlorinated Biphenyl Wastes at Plant,Unit 1 ML20212F4481999-09-17017 September 1999 Forwards NRC Form 536 Containing Currently Proposed Site Specific Operator Licensing Exam Schedule & Estimates of Number of Applicants for Generic Fundamentals Exams Through Cy 2003 ML20212F7051999-09-14014 September 1999 Forwards Rev 19 to Ipn,Units 1 & 2 Physical Security Plan. Plan Withheld,Per 10CFR2.790(d) & 73.21 ML20211N0681999-09-0202 September 1999 Informs That Commission Requested Publication of Notice of Consideration of Issuance of Amend to Fol,Proposed NSHC Determination & Opportunity for Hearing. Amend Changes Senior Reactor License Requirement for Operations Manager ML20211H6291999-08-26026 August 1999 Forwards NPDES Discharge Monitoring Rept for July 1999 for Indian Point,Units 1,2 & 3. Rept of Noncompliance Is Attached for Noncompliance Which Occurred at Unit 3 ML20211E1531999-08-18018 August 1999 Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d) ML20211H6051999-08-18018 August 1999 Forwards Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant.Rev Facilitates Transition of Duty Weapons Carried by Security Force Members from Revolvers to Semiautomatic Pistols ML20211A9241999-08-11011 August 1999 Informs That IPS Currently Estimates,That Approx Two Licensing Actions Will Be Submitted to NRC During Remainder of 1999 NRC Fiscal Yr & Approx Ten Will Be Submitted During 2000 NRC Fiscal Yr ML20210M7251999-07-26026 July 1999 Forwards Projection of Ability to Pay Retrospective Premium Adjustment for Period of Aug 1999 to 000731, Which Demonstrates That Ceny Will Have Sufficient Cash Flow &/Or Cash Reserve Available Throughout Period to Pay Premium ML20210G8911999-07-20020 July 1999 Forwards Application for Amend to License DPR-5 for Proposed New TS 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager ML20209B6611999-06-29029 June 1999 Returns Recently Submitted Renewal Applications,Nrc Form 398,for Three Reactor Operators,As They Are Not Completed Properly.List of Docket Numbers & Block Numbers That Contain Incorrect Info & Block Numbers Not Completed.Without Encls ML20196A6371999-06-15015 June 1999 Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21 ML20207D1861999-05-27027 May 1999 Informs That Effective 990328,NRC Office of NRR Underwent Reorganization.Mt Masnik Section Chief for Indian Point Station,Unit 1.JL Minns Remains Primary Contact for All Routine Licensing & Administrative Matters.Chart Encl ML20205R1981999-04-15015 April 1999 Requests That Dept of Environ Conservation Modify SPDES Permit for IPS IAW Proposed Rev Attached & Described as Listed ML20205R2961999-04-15015 April 1999 Forwards Copy of Proposed Change to Indian Point SPDES Permit NY0004472.Proposed Change Requests Permission to Add Permitted Outfall to Plant as Well as Change Character of Existing Outfall.Without Encl ML20196K8111999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Indian Point,Units 1 & 2 Through 981231 ML20205F9711999-03-25025 March 1999 Informs That Under Separate Cover,Licensee Transmitted to Ofc of Nuclear Regulatory Research Annual Rept of Results of Individual Monitoring at Indian Point,Units 1 & 2,for CY98 ML20204F7931999-03-17017 March 1999 Forwards Table Outlining Nuclear Property Insurance Which Has Been Placed on Behalf of Consolidated Edison Co of Ny, Inc.Insurance Covers Indian Point,Units 1 & 2 ML20204J9971999-03-0909 March 1999 Forwards Insp Rept 50-003/98-19 on 981130-990222.No Violations Noted ML20203B9001999-02-0808 February 1999 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Already Available in PDR, Documents in App B Released in Entirety & Documents in App C Being Withheld in Part (Ref Exemption 6) ML20202J6171999-02-0505 February 1999 Forwards Transcript from 990120 Public Meeting Held in Peekskill,Ny Re Decommissioning ML20199H3731999-01-11011 January 1999 Informs That T Schmeiser,Con Ed Plant Manager for Plant Is Retiring,Effective 990111.AA Blind Will Assume Duties & Responsibilities of Plant Manager Until Replacement Named ML20198E9561998-12-21021 December 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities Re Deliberate Misconduct in Violation of Regulation When False Info Was Provided to Two NRC Licensees ML20198C2371998-12-15015 December 1998 Ltr Contract:Task Order 237, Review & Evaluation of Indian Point 3 Nuclear Power Plant Application for Conversion to Improved TS, Under Contract NRC-03-95-026 ML20198C4911998-12-11011 December 1998 Forwards Rev 18 to Physical Security Plan,Reflecting Organizational Changes & Incorporating Administrative Corrections & Clarifications.Encl Withheld ML20198C3251998-12-11011 December 1998 Responds to ,Responding to NRC Ltr Re Concerns Raised About Potential Chilling Effect from Temp Denial of Site Access to Employee Raising Safety Issues to Util Senior Mgt ML20155H2901998-11-0303 November 1998 Responds to to Lj Callan Expressing Concern About Continued Operation of Indian Point Nuclear Generating Station.Explanation Why NRC Do Not Think Revoking OLs for Indian Point Units 2 & 3 Justified,Provided ML20155F9181998-10-28028 October 1998 Forwards Changes to SPDES Permit,Removing Requirement to Monitor Svc Boiler Blowdown for Phosphates,Eliminate Redundant Sampling of Oil or Grease Entering Flow Tributary to Floor Drains,Per Ts,App B,Section 3.2 ML20155D2791998-10-23023 October 1998 Forwards Corrected Pages for Indian Point Annual Radiological Environ Operating Rept for 1997 ML20154Q1761998-10-21021 October 1998 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Withheld in Part (Ref FOIA Exemption 7) ML20154L8031998-10-16016 October 1998 Ack Receipt of & Payment in Amount of $55,000 in Electronic Funds for Civil Penalty Proposed by NRC in .Corrective Actions Will Be Examined During Future Insp ML20155H3021998-09-24024 September 1998 Urges NRC to Revoke Operating Licenses for Indian Point Nuclear Generating Station,Units 2 & 3 & Not Renew OL for Unit 1 ML20154A1391998-09-22022 September 1998 Informs That Effective 980724,AA Blind Assumed Position of Vice President,Nuclear Power & Ja Baumstark Assumed Position of Vice President,Nuclear Power Engineering,Effective 980813 ML20153F0661998-09-18018 September 1998 Provides Response to Violations Noted in Insp Rept 50-286/98-05 & Proposed Imposition of Civil Penalty Dtd 980819.Corrective Actions:Existing Drawings for Spare Switchgear Cubicles Have Been Revised ML20151W4871998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned as SRAs for Region I ML20151W9511998-09-10010 September 1998 Informs That as Part of NRC PRA Implementation Plan, Commission Has Assigned Two Senior Reactor Analysts (Sras) to Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs Duties for Region I ML20155F4391998-08-26026 August 1998 Forwards Demand for Info,Being Issued to Enable NRC to Fully Understand Recipient Views on Facts & Circumstances Surrounding Allegedly False Info Provided to Two NRC-licensed Activities ML20238F5151998-08-26026 August 1998 First Partial Response to FOIA Request for Documents. Documents Listed in App a Being Released in Entirety. Documents Listed in App B Being Withheld in Part (Ref FOIA Exemption 6) IR 05000286/19980051998-08-19019 August 1998 Discusses Insp Rept 50-286/98-05 on 980528-0612 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Most Significant Violation Involved Failure, Following Design Mod in Oct 1997 ML20237B1001998-08-0505 August 1998 Responds to NRC Re Violations Noted in Insp Repts 50-247/97-13,50-247/97-15,50-247/98-02 & Investigation Rept 1-97-038,respectively.Corrective Actions:Acted Promptly to Assure Conforming to Testing Requirements ML20236X8511998-07-31031 July 1998 Forwards Rept Re Projection of Ability to Pay Retrospective Premium Adjustment for Period 980801-990731,per 10CFR140.21 ML20236V4211998-07-13013 July 1998 Forwards SER Approving Topical Repts WCAP-14333P & WCAP-14334NP (Proprietary & non-propiretary, PRA of RPS & ESFAS Test Times & Completion Times ML20236Q1431998-07-0808 July 1998 Responds to Administrative Ltr 98-03 Re Operating Reactor Licensing Action Estimates IR 05000247/19970131998-07-0606 July 1998 Discusses Insp Repts 50-247/97-13,50-247/97-15 & 50-247/98-02 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000 ML20238F5231998-06-29029 June 1998 FOIA Request for Documents Re NRC Office of Investigation Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20154Q1831998-06-29029 June 1998 FOIA Request for Documents Re NRC OI Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety ML20248F2891998-05-26026 May 1998 Ltr Contract:Task Order 8, Indian Point 2,A/E Follow-up Insp, Under Contract NRC-03-98-021 ML20248L9861998-05-21021 May 1998 Forwards Rev 7 to Security Force Training & Qualification Plan.Review to Verify Receipt of Revised Plan & Sign & Return Receipt Ack Form Provided ML20247M6951998-05-20020 May 1998 Forwards RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, for Plant,Unit 2 1999-09-02
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20212F4481999-09-17017 September 1999 Forwards NRC Form 536 Containing Currently Proposed Site Specific Operator Licensing Exam Schedule & Estimates of Number of Applicants for Generic Fundamentals Exams Through Cy 2003 ML20212F7051999-09-14014 September 1999 Forwards Rev 19 to Ipn,Units 1 & 2 Physical Security Plan. Plan Withheld,Per 10CFR2.790(d) & 73.21 ML20211E1531999-08-18018 August 1999 Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d) ML20211H6051999-08-18018 August 1999 Forwards Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant.Rev Facilitates Transition of Duty Weapons Carried by Security Force Members from Revolvers to Semiautomatic Pistols ML20211A9241999-08-11011 August 1999 Informs That IPS Currently Estimates,That Approx Two Licensing Actions Will Be Submitted to NRC During Remainder of 1999 NRC Fiscal Yr & Approx Ten Will Be Submitted During 2000 NRC Fiscal Yr ML20210M7251999-07-26026 July 1999 Forwards Projection of Ability to Pay Retrospective Premium Adjustment for Period of Aug 1999 to 000731, Which Demonstrates That Ceny Will Have Sufficient Cash Flow &/Or Cash Reserve Available Throughout Period to Pay Premium ML20210G8911999-07-20020 July 1999 Forwards Application for Amend to License DPR-5 for Proposed New TS 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager ML20196A6371999-06-15015 June 1999 Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21 ML20205R2961999-04-15015 April 1999 Forwards Copy of Proposed Change to Indian Point SPDES Permit NY0004472.Proposed Change Requests Permission to Add Permitted Outfall to Plant as Well as Change Character of Existing Outfall.Without Encl ML20196K8111999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Indian Point,Units 1 & 2 Through 981231 ML20205F9711999-03-25025 March 1999 Informs That Under Separate Cover,Licensee Transmitted to Ofc of Nuclear Regulatory Research Annual Rept of Results of Individual Monitoring at Indian Point,Units 1 & 2,for CY98 ML20204F7931999-03-17017 March 1999 Forwards Table Outlining Nuclear Property Insurance Which Has Been Placed on Behalf of Consolidated Edison Co of Ny, Inc.Insurance Covers Indian Point,Units 1 & 2 ML20199H3731999-01-11011 January 1999 Informs That T Schmeiser,Con Ed Plant Manager for Plant Is Retiring,Effective 990111.AA Blind Will Assume Duties & Responsibilities of Plant Manager Until Replacement Named ML20198C4911998-12-11011 December 1998 Forwards Rev 18 to Physical Security Plan,Reflecting Organizational Changes & Incorporating Administrative Corrections & Clarifications.Encl Withheld ML20155F9181998-10-28028 October 1998 Forwards Changes to SPDES Permit,Removing Requirement to Monitor Svc Boiler Blowdown for Phosphates,Eliminate Redundant Sampling of Oil or Grease Entering Flow Tributary to Floor Drains,Per Ts,App B,Section 3.2 ML20155D2791998-10-23023 October 1998 Forwards Corrected Pages for Indian Point Annual Radiological Environ Operating Rept for 1997 ML20155H3021998-09-24024 September 1998 Urges NRC to Revoke Operating Licenses for Indian Point Nuclear Generating Station,Units 2 & 3 & Not Renew OL for Unit 1 ML20154A1391998-09-22022 September 1998 Informs That Effective 980724,AA Blind Assumed Position of Vice President,Nuclear Power & Ja Baumstark Assumed Position of Vice President,Nuclear Power Engineering,Effective 980813 ML20153F0661998-09-18018 September 1998 Provides Response to Violations Noted in Insp Rept 50-286/98-05 & Proposed Imposition of Civil Penalty Dtd 980819.Corrective Actions:Existing Drawings for Spare Switchgear Cubicles Have Been Revised ML20237B1001998-08-0505 August 1998 Responds to NRC Re Violations Noted in Insp Repts 50-247/97-13,50-247/97-15,50-247/98-02 & Investigation Rept 1-97-038,respectively.Corrective Actions:Acted Promptly to Assure Conforming to Testing Requirements ML20236X8511998-07-31031 July 1998 Forwards Rept Re Projection of Ability to Pay Retrospective Premium Adjustment for Period 980801-990731,per 10CFR140.21 ML20236Q1431998-07-0808 July 1998 Responds to Administrative Ltr 98-03 Re Operating Reactor Licensing Action Estimates ML20238F5231998-06-29029 June 1998 FOIA Request for Documents Re NRC Office of Investigation Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20154Q1831998-06-29029 June 1998 FOIA Request for Documents Re NRC OI Rept 1-97-038,meeting Minutes of Summary of Enforcement Conference on 980506 & Meeting Minutes or Summary of 980520 Predecisional Enforcement Conference ML20248L9861998-05-21021 May 1998 Forwards Rev 7 to Security Force Training & Qualification Plan.Review to Verify Receipt of Revised Plan & Sign & Return Receipt Ack Form Provided ML20217F8501998-03-20020 March 1998 Forwards Table Which Outlines Nuclear Property Insurance That Has Been Placed on Behalf of Util,Per 10CFR50.54(w)(3) ML20199L9531998-01-26026 January 1998 Forwards Addl Info on Rev 6 to Security Force Training & Qualification Plan,Per 980113 Telcon Request of G Smith.Encl Withheld ML20199F7541998-01-21021 January 1998 Forwards Rev 17 to Physical Security Plan,Per Requirements of 10CFR50.54(p).Rev 17 Contains Summary of Changes, Detailing Changes Incorporated.Encl Withheld ML20198N1151998-01-20020 January 1998 Submits Status of Response to NRC Request for Addl Info, for Licenses TR-3 & R-93.Request for Commitment to Complete Decommissioning Activities by 2007 Has Been Persued Up Through Nasa Mgt ML20202F8281997-11-26026 November 1997 Reports Mod to Indian Point SPDES Permit as Required in Ts. Copy of New York State Dept of Environ Conservation Ltr That Modifies Permit Is Encl ML20198P7901997-10-31031 October 1997 Forwards Rev 6 to Physical Security Plan,Per 10CFR50.4(b)(4) to Meet Requirements of 10CFR50.54(p).Rev 16 Contains Summary of Changes, Detailing Changes Incorporated. Encl Withheld ML20198P3181997-10-30030 October 1997 Forwards Corrected Pages to Annual Radiological Environ Operating Rept for 1996 ML20211H7771997-10-0202 October 1997 Forwards Responses to RAIs 650.1 Through 650.8 Re Generic Issues & Generic Communications on Valve Testing & Valve Qualification.Westinghouse Status for Subject Issues Will Be Confirm W Pending Rev to SSAR & WCAP-13559 ML20211B4241997-09-19019 September 1997 Requests Withdrawal of Revs 16 & 18 to Physical Security Plan.Rev 16 re-submitted Per Provisions of 10CFR50.54(p)(2) & Deals W/Specific Operational Criteria of New Sys.Plan Withheld ML20211A9411997-09-18018 September 1997 Responds to NRC Re Violations Noted in Insp Rept 50-286/97-80.Corrective Actions:Revised Administrative Procedure AP-3 to Establish Responsibility for Engineering Review & Revised EOP ES-1.3 ML20149J2491997-07-16016 July 1997 Forwards Environ Ts/Nonroutine Event Rept for Units 1 & 2. Appropriate Ny State Agency Notified ML20148S5731997-06-26026 June 1997 Forwards Response to NRC Re Violations Noted in Insp Repts 50-247/96-80;96-07;96-08;97-03 & Imposition of Civil Penalties on 961027-970405.Corrective Actions:Unique Tag Numbers for Louvers Were Generated ML20148J1431997-06-0404 June 1997 Forwards Rev 15A to Ipn Units 1 & 2 Physical Security Plan, Per 10CFR50.54(p)(2).Plan Withheld ML20137M8371997-04-0101 April 1997 Provides Supplemental Response to RAI Re TS Change Request 96-01 on Conversion to Framatome Cogema Fuel.Tech Specs, Encl ML20137A8301997-03-13013 March 1997 Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-286/96-80 on 961213.Corrective Actions:Expert Panel Has Agreed to Include Turbine Bldg & Power Conversion Equipment Bldg in Scope of IP3 Maint Rule Program JPN-97-008, Forwards Comments on Draft NUREG-1560, IPE Program: Persprctives on Reactor Safety & Plant Performance1997-03-0404 March 1997 Forwards Comments on Draft NUREG-1560, IPE Program: Persprctives on Reactor Safety & Plant Performance ML1004713451997-02-26026 February 1997 Forwards Proprietary & non-proprietary Versions of W Rept Entitled, Conditional Extension of Rod Misalignment TS for Indian Point 3. Authorization Ltr & Affidavit,Encl. Proprietary Encl Withheld Per 10CFR2.790 ML20135C7121997-02-21021 February 1997 Forwards Table That Outlines Nuclear Property Insurance on Behalf of Util Covering Units 1 & 2 ML1004713471997-02-18018 February 1997 Authorizes Utilization of Encl Affidavit by Util Re WCAP-14669,Rev 1, Conditional Extension of Rod Misalignment TS for Indian Point 3. Rept Should Be Withheld Per 10CFR2.790(b)(4) ML20134N6481996-12-24024 December 1996 Provides Further Details Re Corporate Reorganization of Consolidated Edison Co of Ny for Indian Point Units 1 & 2 ML20132C8071996-12-12012 December 1996 Forwards Check for $100 for Payment of NRC Invoice 7I0053 for Indemnity Fee on License DPR-5 for One Year Period 961204-971203.W/o Check ML20129D9611996-10-11011 October 1996 Forwards Controlled Copy of Plant Physical Security Plan,Rev 18,re Access Control Upgrade Which Adopts Biometric Hand Geometry.W/O Encl ML20117P6151996-09-11011 September 1996 Forwards Rev 9 to Security Training & Qualification Plan.W/O Encl ML20117E3891996-08-21021 August 1996 Forwards Four Copies of IP3 Security Contingency Plan,Rev 4. W/O Encl JPN-96-035, Informs NRC That Boraflex Not Used as Neutron Absorber in Either Util or Plant Spent Fuel Pool Storage Racks,Per GL 96-041996-08-0606 August 1996 Informs NRC That Boraflex Not Used as Neutron Absorber in Either Util or Plant Spent Fuel Pool Storage Racks,Per GL 96-04 1999-09-17
[Table view] |
Text
'e i'
1 A. Alan Bilnd Vice Preeders I
l Connoridated Edison Company of New York, Inc.
Indian Point Stacon Brobdway & Blealdey Avenue i
Buchanan, NY 10511 i
Te6ephone (914) 734-5340 i
Fax: (914) 734 s7*8 March 31,1999 undeocor x oom 4
Re:
Docket Nos. 50-3 and 50-247 Indian Point Units 1 and 2 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station PI-137 Washington, DC 20555-0001
Subject:
Decommissionine Fundine Status Report - Indian Point Units 1 and 2 Gentlemen:
j Pursuant to 10 C.F.R. 50.75(f)(1), Consolidated Edison Company of New York, Inc. (" Con Edison") submits the following report on the status of j
decommissioning funding for Con Edison's two nuclear units, Indian Point Units 1 and 2. Con Edison is the sole owner of both units. Con Edison originally submitted information to the NRC regarding decommissioning funding for these units by letter to the NRC dated July 17,1990. The data presented herein is provided as of December 31,1998, and reflects the best information availaMe to Con Edison at this time. Unless otherwise indicated, the amounts are in 1998 dollars.
No new regulatory commitments are being made by Con Edison in this correspondence.
Should NRC staff have any questions regarding this matter, please contact
.Mr. Robert Muccilo, Assistant Controller, at (212) 460-2884.
Respectfully submitted, Y
pnt Attachment l
9904060379 990331 7
PDR ADOCK 05000003 *'
I PDR g
2
il:.*'y**
l I
I C:
Mr. Hubert J. Miller Regional Administrator-RegionI US Nuclear Regulatory Commission 475 Allendale Road.
King of Prussia, PA 19406 Mr. John L. Minns, Project Manager Division of Reactor Program Management US Nuclear Regulatory Commission Mail Stop 10-D4 l
Washington, DC 20555 Mr. Jefferey F. Harold, Project Manager Project Directorate I-l Division of Reactor Projects I/II US Nuclear Regulatory Commission Mail Stop 14B-2 Washington, DC 20555 Senior Resident Inspector US Nuclear Regulatory Commission PO Box 38 Buchanaa, NY 10511 1
U.S. Nuclear Regulatory Commission ATTN: Robert Wood Mail Station Ol:-F1 Washington, DC 20555-0001 l
l J
NRC DECOMMISSIONING FUNDING STATUS REPORT of
. CONSOLIDATED EDISON COMPANY OF NEW YORK, INC.
for the INDIAN POINT 1 AND INDIAN POINT 2 NUCLEAR POWER UNITS as of DECEMBER 31,1998
- 1. - The amount of decommissioning funds anticipated to be required in accordance with the NRC minimum certification funding amount fonnula (10 CFR 50.75(b) and (c))
for nuclear decommissioning:' -
(a)
Lcw Level Waste Direct Disposal Indian Point 1 Indian Point 2 Total
$399.1 million
$463.1 million
$862.2 million (b). Low Level Waste Disposition by Waste Vendors Indian Point 1 Indian Point 2 Total
$235.1 million
$272.8 million
$507.9 million 2.
The amount of funds (net of taxes) accumulated to the end of calendar year 1998 for nuclear decommissioning:
Indian Point 1 Indian Point 2 Total
$92.9 million
$172.2 million
$265.1 million l
l l-Costs associated with decommissioning as reported herein reflect the activities necessary to decommission the facility as dermed in 10 CFR 50.2. The decommissioning costs are calculated based on the information provided in NUREG-1307, Revision No. 8.
l l
1-.-
o 4
...,e 1
3.
Schedule of the annual amounts remaining to be collected.
Year Indian Point 1 Indian Point 2 Total 2
1999-2002
$6.8 million
$14.5 million
$21.3 million Year Indian Point 1 Indian Point 2 Total 2002-2013' (See footnote 3) 4.
The assumptions used regarding escalation in decommissioning costs and rates of earnings on decommissioning funds are as follows:
Assumed decommissioning cost escalation rate 3.25 %
Assumed rate of earnings on decommissioning funds (after taxes) 6.00 %
5.
Con Edison is not relying upon any contracts pursuant to 10 CFR 50.75(e)(1)(v).
6.
Except as set forth herein (see footnotes 2 and 3), there have been no modifications to Con Edison's current method of providing nuclear decommissioning financial assurance since the July 17,1990 report.
7.
There have been no material changes pertaining to Indian Point Units 1 and 2 nuclear decommissioning trust agreements 2
Under a 1995 electric rate agreement, the New York State Public Service Commission ("PSC") approved an annual decommissioning expense allowance for the nuclear portion of the plants of $21.3 million.
The determination of the contribution amount was based on a 1994 site-specific decommissioning study.
The site-specific study concluded that the total costs of nuclear decommissioning for indian Point Units 1 and 2 amounted to $657 million in 1993 dollars, $252 million of wtach represented spent fuel storage costs. The costs of decommissioning Indian Point Units 1 & 2 excluding spent fuel storage costs l
amounted to $405 million.
A September 23,1997 settlement agreement approved by the PSC, which expires on March 31,2002, provides for the recovery of decommissioning costs for Indian Point Units I and 2, and reflects the rate recovery of site-specific decommissioning costs in 1998 dollars of $771.3 million. As set forth in this table, the current NRC minimum is between $507.9 million and $862.2 million for both units. At the end of the current PSC agreement, Con Edison would propose to the PSC to reflect a decommissioning cost allowance consistent with any site-specific study for Indian Point Units 1 and 2 and then-current NRC minimum decommissioning cost estimates.
I l
L