ML20234B440

From kanterella
Jump to navigation Jump to search
Forwards Best Estimate of Operator Licensing Schedules for FY88,FY89 & FY90,in Response to Generic Ltr 87-14.Dates for FY91 Exams Not Scheduled Yet
ML20234B440
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/14/1987
From: Selman M
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-87-14, NUDOCS 8709180413
Download: ML20234B440 (4)


Text

-- _ _ _ _ _ _ _ - - _ _ - - - - - - - . _ _ - _ _ _ _ - - . - . - _ _ _ _ - - _ _ _ . _ _ - - _ _ _ - _ - - _ - _ - - - - _ - _ _ _ _ _ _ _ - - _ . _ _ _ - - - - - _ - - - . _ - _ _ .

.'

  • Murriy Selm:n Vcs Presden:

Consondated Edison Company of New York,Inc.

Indian Point Station Broadway & Bleakley Avenue Duchanan, NY 10511 Telephone (9I4) 737 8116 September 14, 1987 Re Indian Point Unit No. 2 Docket No. 50-247 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Response to Generic Letter 87-14 Operator Licensing Examinations The purpose of this letter is to provide our current best estimate of our needs for operator licensing examinations for FY 1988, FY 1989 and FY 1990 (October 1 to September .30 of each year) . The dates for FY 1991 operator licensing examinations have not been scheduled yet. In addition, the dates for scheduled requalification examinations and - the anticipated number of examinations and dates for each licensing examination site visit are provided. Attachment 1 includes our schedules in response to Generic Letter 87-14.

If you have any questions please do not hesitate to call my office.

Very truly yours,

" ww 23.190.9.2.2 cc: Ms. Marylee M. Slosson Project Directorate I-l Division of Reactor Projects I/II U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. William Russell Regional Administrator - Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Mr. John Hannon, Chief Operator Licensing Branch, AR-5221 Washington, DC 20555

. Senior Resident Inspector U.S. Nuclear Regulatory Commission /

P.O. Box 38 Buchanan, NY 10511 '

l 8709180^13 87091 ~~

PDR ADOCK 05000 V P

Attachment 1 Operator Licensing Schedules l

l I

1 l

l l

1 I

Consolidated Edison Company of New York, Inc. ,

Indian Point Unit No. 2 Docket No. 50-247 September, 1987 i

k OPERATOR LICENSING EXAMINATION SCHEDULE Facility Indian Point Unit 2 NRC Region 1 FY 1988 FY 1989 FY 1990 FY 1991

1. Date .

Mar. sept.

  1. R0 13 10
  1. 5R0 8
  1. SR0 Upgrade 6
  1. 5R0 Limited
2. Date
  1. R0
  1. SR0
  1. SR0 Upgrade
  1. SR0 Limited
3. Date
  1. R0
  1. 3R0
  1. $R0 Upgrade
  1. 5R0 Limited Please indicate initial cold license examinations by placing an asterisk (*)

by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**) (e.g., Unit One is in operation and Unit Two is approaching fuel load. Three R0 candidates with no previous license are to be examined on both Units One and Two and five R0 candidates licensed on Unit One are to be examined to extend their licenses to Unit Two. Indicate (2/15/88, R0 3,5**)).

REQUALIFICATION EXAMINATION SCHEDULE Facility _' Indian Point Unit 2 NRC Region 1 FY 1988 FY 1989 FY 1990 FY 1991

1. Date 3/88-5/88 Date 3/89-5/89 Date 3/90-5/90 Date 3/91-5/91
2. Date Date Date Date
3. Date Date Date Date
4. Date Date Date Date. s l

I l l

1 I

'i I