ML20199F754
| ML20199F754 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 01/21/1998 |
| From: | Barrett R POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IPN-98-006, IPN-98-6, NUDOCS 9802040098 | |
| Download: ML20199F754 (2) | |
Text
,
l 1
bdsin Pomt 3 i
Nucher Powsr Ptsnt PO Pa 2t$
B :t r am f.en wi 1051!
314 73E 8001
\\
- D NewYorkPower M;?j$*""
tv Authority January 21,1998 IPN-98-006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
SUBJECT:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR 64 Submittal of the Physical Security Plan Revision 17
Dear Sir:
The enclosed Physical Security Plan, Revision 17, is being transmitted in accordance with 10 CFR 50.4(b)(4), to meet the requirements of 10 CFR 50.54(p).
The changes incorporated into Revision 17 were evaluated and we determined that the changes do not decrease the safeguards effectiveness of the plan. The Physical Security Plan, Revision 17, contains a "St.mmary of Changes" detailing the changes incorporated. Enclosure I contains SAFEGUARDS INFORMATION and should be controlled pursuant to 10 CFR 73.21.
The Physical Security Plan is being revised to reflect regulatory changes that deleted certain security requirements associated with the internal threat. These changes are taken to reduce regulatory burdens without compromising physical protection against radiological sabotage. Revision 17 also makes changes to reflect the addition of a vital area.
Please review to verify receipt, and sign and return the receipt acknowledgment form provided in Enclosure 11. There are no new commitments associated with this letter.
This letter transmits SAFEGUARDS INFORMATION and should be controlled in accordance with 10 CFR 73.21, unless separated from the enclosure.
d p
9802040098 980121 PDR ADOCK 050002 6 g
1.1!.!! I.ll. l.l l.ll.l.l If3
,n c
Docket > -
50-286 IPN 98-006 Page 2 of 2
-If you have any questions regarding this revision, please call Mr. John Odendahl at (914) 736-2701.
Very truly yours, L
obert a.
Site ecutive Officer Indian Point 3 Nuclear Power Plant Enclosure l Physical Security Plan, Revision 17 1 Document Receipt Form cc:
U.S. Nuclear Regulatory Commission (w/3 copies)
ATTN: Document Contiol Desk Washington, D.C. 20555 Hubert J. Miller (w/2 copies)
Regional Administrator Region i U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania - 19406-1415 NRC Resident inspectors' Office (w/o enclosures)
Indian Point 3 Nuclear Power Plant U.S. Nuclear Regulatory Commission P.O. Box 337 Buchanan, N.Y. 10511
,__ _