Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d)
ML20211E153
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/18/1999
From: Blind A
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9908270225
Download: ML20211E153 (6)


Text

o-

. [ A. Alan Blind the Preedert 8 + Consolidated Edison Company of New York, Inc.

Indian Pcant Station Broadway & Bleakley Avenue Buchanan, NY 10511 Telephone (914) 734 5340 Far (914) 734-5718 August 18,1999 blindacconed com Re: Indian Point Unit No.1 & No.2 Docket No. 50-03 & No. 50-247 Document Control Desk US Nuclear Regulatory Commission Mail Station P1-137 Washington,DC 20555

SUBJECT:

10 CFR Part 26 Semi Annual Report In accordance with 10 CFR 26.71(d), attached is the Fitness-For-Duty Program performance data for Indian Point Station, Units No.1 and 2, for the period January 1 through June 30,1999.

Should you or your staff have any questions regarding this matter, please contact Mr. John McCann, Manager, Nuclear Safety and Licensing.

I Very tmly yours, ff 1

l

Attachment  ;

cc: Mr. Huben J. Miller Regional Administrator- Region i US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 194%

i Mr. Jefferey F. Harold, Project Manager

! Project Directorate I-1 l Division of Rea: tor Projects I/II  !

US Nuclear Regulatory Commission Mail Stop 14B-2

) )

Washington, DC 20555 Senior Resident Inspector US Nuclear Regulatory Commission PO Box 38 Buchanan, NY 10511 9908270225 990818 PDR ADOCK 05000003 R PW

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR 26 CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. JUNE 30,1999 j COMPANY 8 MONTHS ENDMG l

lNDIAN POINT STATION, UNITS 1 AND 2, BUCHANAN, NY 10511 J. MARK DREXEL, MANAGER, SITE PROTECTION (914) 271-7418 CONTACT NAME PHONE (MCLUDE AREA CODE)

Cut effs: Screen / Confirmation (ng/ml) E Appendix A to 10CFR 26 Marijutna ' _100/15 Amphetamines 1000 / 500 Methadone 300/300 Coc2ine 300/150 Phencyclidine 25 / 25 Barbiturates 300/300 OplatL3 300/300 Alcohol (%BAC) 0.04 % Benzodiazanine 300/300

)

i Tseting Results Licensee Employees Contractor Personnel Totals Av;rzge Number with 778 420 1198 Unsecneted Access Cttsgeries # Tested # Positive ' # Tested # Positive # Tested # Positive Prs-Access 123 0 183 2 306 2 g Past Accident 0 0 0 0 0 0 f Observed 0 0 2 1 2 1 R:ndsm 197 1 99 0 296 1 Felisw-Up 0 0 0 0 0 0 OthsrJ 0 0 0 0 0 0 TctEl 320 1 284 3 604 4 l

l wp7cullen//ffdsum99 -

l

s O

e A 4 5

4 S 3 E

C N

A T

S 2 B

U S

C I

F I

C 1 E

P S

R a

s es l

t O

F f uT 0 0 0 S eo T Rt S

E l T o E h V o 1 2 3 I l c

T I

A S

O -

ye P cni n D ed 0 0 0 E hic M P R

I F

N hn e- es O pi 0 0 0 C mma F At O

s N e W t a 0 0 0 O ip D O K

A e E n R i a 0 0 0 B c o

C a

n a

j u 0 1 1 a

r 9 9

a m M tm s d T(

e 4 ey

'n le l

o l u

c p 7 p

m s u E o r

e e

t c

s a s n t r l a

e c n t i o o L C T

E INDIAN POINT STATION ATTACHBENT "A" FITNESS-FOR-DUTY

SUMMARY

AND MANAGEMENT ACTIONS This report identifies Fitness-for-Duty activities at the Indian Point Station, Units 1 and 2, from January 1, 1999 to June 30, 1999. During the report period there was no outage activity and the plant was on line throughout the entire reporting period.

For this six month period, the average number of plant workers with unescorted access was 1198. For the remainder of this year, the actual random testing will be monitored and tracked to ensure that on an annual basis, random drug and alcohol testing will be conducted as a rate equal to at least fifty percent (50%) of the total unescorted work force (employees and contractors).

A total of 604 drug and alcohol tests were conducted during this period; 306 were initial or pre-access tests and 296 were random tests. Two persons were tested "for-cause." There were four MRO confirmed positive drug and alcohol tests; one licensee employee for a random alcohol test and_three contractor employees; one for an initial drug test, one for an initial alcohol test and the other for a "for-cause" alcohol test based upon detection by security at the site entry access search area. The two contractor employees who tested positive to alcohol, also requested a blood test be taken and both returned positive. All contractor employees who tested positive for either drugs or alcohol were barred from the site and their unescorted access terminated.

The one licensee employee test that was positive to alcohol resulted from a random test. He was immediately enrolled in the company substance abuse program. There were no licensed operators or supervisors who tested positive.

There was one case where a food caterer employee attempted to gain access to the Protected Area and during the search process, security discovered a case of beer in the trunk of the vehicle.

He was escorted to the collection facility where he was tested for-cause. The test returned negative. Security determined that the case of unopened beer was left over from a previous catered affair for another client and there was no conscious attempt to introduce the case of beer into the Protected Area. The caterer employee was counseled and reminded of his responsibilities to the fitness-for-duty rules.

I I

1

INDIAN POINT STATION

\

ATTACHMENT "B" t

FITNESS FOR DUTY REPORT LICENSEE AND CONTRACTOR POSITIVE DRUG ALCOHOL TESTS JANUARY 1, 1999 TO JUNE 30, 1999 CON EDISON INITIAL RANDOM FOR i EMPLOYEES. TEST: TEST: CAUSE: TOTALS -

i

\

DRUGS: 0 0 0 0 \

\

ALCOHOL: 0 1 0 1 OTHER: 0 0 0 0 TOTALS: 0 1 0 1 CONTRACTOR EMPLOYEES:

DRUGS: 1 0 0 1 i

ALCOHOL: 1 0 1 2 OTHER: 0 0 0 0 TOTALS: 2 0 1 3 GRAND TOTALS: 2 1 1 4 l

4 wp7cullen//ffdsum99

p ,

o. .

l INDIAN POINT STATION l-

. . ATTACHMENT "C" FITNESS FOR DUTY REPORT - POSITIVE DRUG ALCOHOL TESTS JANUARY 1, 1999 TO JUNE 30, 1999 DRUGS ALCOHOL AGE
Under 20 0 AGE: Under 20 0 20 - 29 0 20 - 29 0 30 - 39 0 30 - 39 0 40 - 49 1 40 - 49 1 50 - 59 0 50 - 59 2 60 & Over 0 60 & Over 0 TOTAL 1 TOTAL 3 DAY TESTED DRUGS ALCOHOL Monday 0 Monday 2 Tuesday 0 Tuesday 0 Wednesday 1 Wednesday 1 Thursday 0 Thursday 0 Friday 0 Friday 0 Saturday / Sunday 0 Saturday / Sunday 0 I

TOTAL 1 TOTAL 3 wp7cullen//ffdsum99