ML20024A542

From kanterella
Jump to navigation Jump to search
Submits Amended Response to NRC 830329 Ltr Re Violations Noted in IE Insp Rept 50-397/83-05.Corrective Actions:Qa Will Issue Nonconformance Rept Re Missing Welder Qualifications,For Engineering Review
ML20024A542
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/20/1983
From: Carlisle C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20024A532 List:
References
GO2-83-458, NUDOCS 8306170422
Download: ML20024A542 (2)


Text

, . .

~

Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay 72-5000 Docket No. 50-397 Richland, Washington 993$)g) 4

/g g ,

May 20, 1983 G02-83-458 @0Npfq Mr. D. M. Sternberg Chief, Reactor Projects U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Subject:

NUCLEAR PROJECT N0. 2 NRC INSPECTION 50-397/83 NOTICE OF VIOLATION

References:

a) Letter dated March 29, 1983, D.M. Sternberg to R.G.

Matlock, same subject.

b) Letter dated April 28, 1983, C.S. Carlisle to D.M.

Sternberg, same subject.

This letter provides an amended response for Item (e), Page 2 of Refer-ence b), Welder Qualifications. These records were, in fact, misfiled within the Contract file. Those welder qualifications which were mis-filed have now been relocated under the generic classification welder qualifications. However, it was brought to the attention of Project Quality Assurance, by the NRC Resident Inspector, that welder qualifi-cations for Welder #82 could not be found. A full review by Project QA for all fifty-seven (57) required qualifications disclosed that, in fact, a total of 8 welder qualifications are missing from the Contract 24 file.

Project QA has searched the files for these records. Contract Specifi-cation 2808-24 required them to be submitted for information only.

Project QA has contacted the Vendor, HUIC0, Inc. of Meridian, Idaho, who informed us that they have no records of welder qualifications prior to 1976 in their files.

l Corrective Action - Project QA will initiate an NCR for the missing welder qualifications for Engineering review and disposition. This report will be available for the Resident Inspector's review.

Action to Preclude Recurrence - Project QA is compiling a book of document matrices for the 62 inactive and prepurchase Quality Class I and Seismic Class I contracts. These matrices will be evaluated for accuracy and completeness.

8306170422 e30613 PDR ADOCK 05000397 0 PDR

Mr. D. M. Sternb:rg Page Two May 20, 1983 G02-83-458 If there are any questions regarding this matter, please contact Roger Johnson, Project QA Manager, WNP-2 at (509) 377-2501, extension 2712.

. 'e" Program Director, WNP-2 RTJ/kd cc: W.S. Chin, BPA A. Forrest, Burns and Roe - HAP 0 N.D. Lewis, EFSEC A. Toth, NRC Resident Inspector Document Control Desk, NRC WNP-2 Files /917B/917Y i

i

.