Notice of Violation from Insp on 801001-31
ML20003A606
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/26/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20003A599 List:
References
50-269-80-33, 50-270-80-29, 50-287-80-26, NUDOCS 8102040378
Download: ML20003A606 (1)


Text

4 NOV 2 81980 APPENDIX A NOTICE OF VIOLATION Duke Power Company License No. DPR-47 DPR-55 Based on the NRC inspection October 1-31, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.

A.

As required by Technical Specification 6.4.1.j, procedures shall be followed when performing safety-related periodic test procedures.

Contrary to the above, ' on October 13, 1980, periodic test procedures IP/0/A/310/12A and IP/0/A/310/13A were performed without regard to sequence resulting in an unplanned, radioactive gaseous release of 13 curies.

This is an infraction and applies to Oconee Unit 2.

B.

As required by Technical Specification 3.14 shock suppressors are required to be operable and once an inoperable suppressor is discovered, operation may continue for a period not to exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Contrary to the above, the oil reservior for suppressor 3-54A-3-0-2435B-SR22 found to be empty on August 19, 1980. Work request 54499 was issued was August 26, 1980 to test and repair the suppressor. Testing was performed on September 8, 1980 and revealed the suppressor to be inoperable. Repairs were compleued on September 9, 1980 and the suppressor was restored to operable status.

This is an infraction and applies to Oconee Unit 3.

C.

As required by Technical Specification 4.1, Table 4.1-2, Item 10, non-operating LPI pump casings are required to be vented prior to testing.

Contrary to the above on 10-7-80, the 3A LPI pump was started and run for

)

PT 3/A/0230/06 LPI Performance TEST without first having been vented.

This is an infraction and applies to Oconee Unit 3.