Notice of Violation from Insp on 820210-0310
ML20053E257
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/02/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20053E229 List:
References
50-269-82-09, 50-269-82-9, 50-270-82-09, 50-270-82-9, 50-287-82-09, 50-287-82-9, NUDOCS 8206070737
Download: ML20053E257 (1)


Text

..

APPENDIX A NOTICE OF VIOLATI0i1 Duke Power Company Docket Nos. 50-269, 270, & 287 Oconee 1, 2, and 3 License Nos. DPR-38, 47, & 55 As a result of the inspection conducted on February 10 - March 10,1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980).

the following violations were identified.

A.

Technical Specification 3.5.2.5 requires that the axial power shaping rod, positions be maintained in compliance with technical specification figure 3.5.2-4A1.

Contrary to the above, on February 27, 1982, the Oconee Unit 1 axial power Shaping rods were positioned outside the allowable limits for a period of eight hours.

This is a Severity Level IV Violation (Supplement I.E.).

B.

Technical Specification 6.4.1 requires that the station be operated and maintained in accordance with written approved procedures.

Contrary to the above, on February 20, 1982, licensee health physics technicians did not employ the directions embodied in procedure HP/0/B/1000/62/Q which led to two radioactive liquid effluent releases in violation of procedure OP/0/A/1106/31.

Total radioactive liquid release was 2.207 curies which is below the technical specification limits.

This is a Severity Level V Violation (Supplement I.E.).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged viola-tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.

Da te: APR 0 21992 B206070737 B20525 PDR ADOCK 05000269 O