Forwards IE Insp Repts 50-269/80-33,50-270/80-29 & 50-287/80-26 on 801001-31 & Notice of Violation
ML20003A604
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/28/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20003A599 List:
References
NUDOCS 8102040372
Download: ML20003A604 (2)


See also: IR 05000269/1980033

Text

-

4

' , .

UUTED STATES

'

.

"'-

NUCLEAR REGULATORY COMMISSIGN

m

.

i

REGION 11

(

gbh / [

101 MARIETTA si,, N.W., SUITE 3100

ATLANTA, GEORGIA 30303

~*f

<<

.....

NOV 2 81980

In Reply Refer To:

RII:FJ

50-269/80-33

50-270/80-29

80-287/80-26

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by F. Jape of this office on October 1-31,

1980, of activities authorized by NRC Operating License Nos. DPR-38, DPR-47 and

DPR-55 for the Oconee facility, and to the discussion of our findings held with

J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective ensinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; an! (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprie.tary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document. Room.

8102Ok0

'

37A

-

.

.

Duke Power Company

-2-

NOV 2 81980

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

$0

R. C.

e ts, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-269/80-33

50-270/80-29 and 80-287/80-26

cc w/ encl:

J. E. Smith, Station Manager

i

L