s APPENDIX A NOTICE OF VIOLATION Duke Power Company License Nos. DPR-38, DPR-47 and DPR-55 Oconee Nuclear Station Based on the NRC inspection April 1-30, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by Technical Specification 6.6.2.1.b(3), a written report is required to be submitted within 30 days of discovery of an inadequacy in the implementation of procedural controls which are intended to ensure surveillance activities are performed within specified time intervals to meet operability requirements of limiting conditions for operations.
Contrary to'the above, on February 1,1979 and on February 28, 1979, the licensee discovered that surveillance testing on safety-related batteries and reactor building pressure analog channels had not been performed within the time interval specified by Technical Specifications 4.6 and 4.1, respec-tively. Both events were investigated by the licensee, but were not reported to the NRC.
This is a deficiency.