ML20125B547
| ML20125B547 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/06/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20125B529 | List: |
| References | |
| 50-269-85-03, 50-269-85-3, EA-85-056, EA-85-56, NUDOCS 8506110451 | |
| Download: ML20125B547 (4) | |
See also: IR 05000211/2003010
Text
-
s.
o
Duke Power Company
Docket No. 50-269
Oconee Nuclear Power Plant
License No. OPR-38
EA 85-56
As a result of a Nuclear Regulatory Commission (NRC) inspection conducted on
February -11 - March 10,1985, a violation of NRC requirements was identified.
-The violation involved a failure to meet the strong, tight package requirement of
49 CFR 173.425(b) as required by 10 CFR 71.5(a).
In accordance with the " General
Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2,
Appendix C (1985), the particular violation is set forth below:
10 CFR 71.5(a) requires that a licensee who transports any licensed material
outside the confines of his plant or other place of use or who delivers
licensed material to a carrier for transport shall comply with the applicable
requirements of regulations appropriate to the mode of transport of the
Department of Transportation (00T) in 49 CFR Parts 170 through 189.
49 CFR 173.425(b) requires that low specific activity radioactive materials
consigned for exclusive use be packaged in a DOT Specification 7A Type A
package or in a strong, tight package so that there will be no leakage
of radioactive material under conditions normally incident to transportation.
49 CFR 173.475(c) requires the shipper to ensure prior to shipment that each
closure device of the packaging be properly installed, secured, and free of
defects.
49 CFR 173.475(f) requires the shipper to ensure prior to shipment each closure,
valve, or other opening of the containment system through which the radioactive
content might escape be properly closed and sealed.
Contrary to the above, on March 1,1985, the licensee failed to package
a shipment of low specific activity radioactive material in a 00T
Specification 7A Type A package or a strong, tight package in that the
top of the package came off during transport.
This is a Severity Level III violation (Supplement V).
Pursuant to 10 CFR 2.201, Duke Power Company is hereby required to submit to
the Regional Administrator, U.S. Nuclear Regulatory Commission, Region II,
101 Marietta Street, N.W., Suite 2900, Atlanta, Georgia 30323, within 30 days
of the date of this Notice a written statement or explanation including for the
violation: (1) the reasons for the violation if admitted, (2) the corrective
steps which have been taken and the results achieved, (3) the corrective steps
which will be taken to avoid further violations, and (4) the date when full
compliance will be achieved. Where good cause is shown, consideration will be
given to extending the response time.
Dated at Atlanta, Georgia
this 6 day of June 1985
8506110451 850606
ADOCK 05000269
G
[
.
.
Duke Power Company
Distribution
SECY
CA
JMTaylor, IE
RVollmer, IE
JCollins, IE
JAAxelrad, IE
EFlack, IE
JNGrace, RII -
!
JLieberman, ELD
Enforcement Coordinators
RI, RII, RIII, RIV, RV
VStello,DED/ROGR
FIngram, PA
SConnelly, 0IA
BHayes, 01 _.
HDenton, NRR
.JCrooks, AE00
EJordan, IE
JPartlow,.IE
,
BGrimes, IE
IE:ES File
IE:EA File
EDO Rdg File
@
f
h
IE:ES
ELD %
RII h
ES:D $ a y
'_ 1mer
)
IE;
o
JP
or
EFlack
JLiebbrman
JNGrIce
AAxelrad
5/49/85
5/st/85
5/A//85
5/3l/85
A /85
$
/85
- @*
g-
c
y-
.. ,:
.-
JUN O 61985
" Duke' Power Company
3
'
Distribution-
M ECY
te1C
JMTaylor, IE
RVollmer, IE
.JCollins, IE
'JAAxelrad, IE
EFlack, IE
JNGrace, RII
M eberman, ELD
Enfo ement Coordinators
RII, RIDP, RIV, V
llo, DED/ROGR
ngram, PA
8SetnInelly, OIA
t.BHfyes, OI
L4fDenton, NRR
t.grooks, AE0D
EJordan, IE
JPartlow, IE
8 Grimes, IE
IE:ES File-
IE:EA File
EDO Rdg File
ate of South Carolina
Document Control Desk
p M Resident Inspector
.
.
!-
F3M
&g
JPStohr
RWalker
e ins
JI shinski
6/5 /85
6/f/ /85
6/
85
6/ /85
IE:ES
ELD
RII
ES:D
IE:DD
IE:D
EFlack
JLieberman
JNGrace
JAAxelrad
RVo11mer JMTaylor
6/ /85
6/ /85
6/ /85
6/ /85
6/ /85
6/ /85
L
I
l.
,
l
,
Duke Power Company
Docket No. 50-269
,
Oconee Nuclear Power Plant
License No. DPR-38
EA 85-56
As a result of a Nuclear Regulatory Commission (NRC) inspection conducted on
February 11 - March 10, 1985, a violation of NRC requirements was identified.
The violation involved a failure to meet the strong, tight package requirement of
49 CFR 173.425(b) as required by 10 CFR 71.5(a).
In accordance with the " General
Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2,
Appendix C (1985), the particular violation is set forth below:
10 CFR 71.5(a) requires that a licensee who transports any licensed material
outside the confines of his plant or other place of use or who delivers
licensed material to a carrier for transport shall comply with the applicable
requirements of regulations appropriate to the mode of transport of the
Department of Transportation (00T) in 49 CFR Parts 170 through 189.
49 CFR 173.425(b) requires that low specific activity radioactive materials
consigned for exclusive use be packaged in a DOT Specification 7A Type A
package or in a strong, tight package so that there will be no leakage
of radioactive material under conditions normally incident to transportation.
49 CFR 173.475(c) requires the shipper to ensure prior to shipment that each
closure device of the packaging be properly installed, secured, and free of
defects.
49 CFR 173.475(f) requires the shipper to ensure prior to shipment each closure,
valve,-or other opening of the containment system through which the radioactive
content might escape be properly closed and sealed.
Contrary to the above, on March 1, 1985, the licensee failed to package
a shipment of low specific activity radioactive material in a 00T
Specification 7A Type A package or a strong, tight package in that the
top of the package came off during transport.
This is a Severity Level III violation (Supplement V).
Pursuant to 10 CFR 2.201, Duke Power Company is hereby required to submit to
the Regional Administrator, U.S. Nuclear Regulatory Commission, Region II,
101 Marietta Street, N.W., Suite 2900, Atlanta, Georgia 30323, within 30 days
of the date of this Notice a written statement or explanation including for the
violation:
(1) the reasons for the violation if admitted, (2) the corrective
steps which have been taken and the results achieved, (3) the corrective steps
which will be taken to avoid further violations, and (4) the date when full
compliance will be achieved. Where good cause is shown, consideration will be
given to extending the response time.
.
Dated at Atlanta, Georgia
this (; day of June 1985
t