_ _ _ _ _ _ _ _ -
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION O
4 THE ATOMIC SAFETY AND LICENSING BOARD g.
vanac
.y Marshall E. Miller, Esquire, Chairman 3
2 3 fgg, f Dr. Kenneth A. McCollom, Member 9-Offie,,f Dr. Hugh C. Paxton, Member Y
r
/
4 to In the Matter of
)
)
PORTLAND GENERAL ELECTRIC COMPANY
)
Docket No.50-344SP
)
(Trojan Nuclear Plant)
)
(Control Building)
ORDER REGARDING TRANSCRIPT CORRECTIONS (May 22, 1980)
A large number of errors are contained in the transcript of the eviden-tiary hearing held in this proceeding March 31-April 3 and April 16-17, 1980, covering pages 3640-4828. The following corrections are therefore to be made in such transcripts:
MARCH 31, 1980 TRANSCRIPT CORRECTIONS l
Tr. Reference Correction 3643, Line 3 Change " Barbara" to " Robert" 3647, Line 20 Change "on resolved" to " unresolved" 3654, Line 9 Change " post" to "the proposed" 3655, Line 12 Insert "it" after "that" 3656, Line 5 Change "Molij ay" to "Myle J."
8006020kOOf n
J
. MARCH 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 3656, Line 22 Change "constructural" to " structural" 3663, Line 14 Change "SCR's" to "SER's" 3667, Line 14 Change " bulletin" to " document" 3670, Line 4 Delete, "the prehearing conference" 3675, Line 20 Change "after" to "as to" 3680, Line 17 Change " Morgan" to " Oregon" 3681, Line 13 Change "and" to "in" 3681, Line 18 Following " questions?" add "A. No."
3683, Line 3 Change " Morgan" to " Oregon" 3683, Line 12 Change " procedure" to " proceeding" 3683, Line 25 Change " questions to answers" to " answers to questions" 3684, Line 18 Change " Veal" to "Beale" 3684, Line 19 Change " engineering" to " Engineering Manager" 3686, Line 3 Change "were placed" to "for Plates" 3686, Line 7 Change "why" to "part of" 3687, Line 9 Change "see from fine" to " find" l
3689, Line 24 Change " Bess" to "Bettis" l
3694, Line 3 Change " pretrial" Co "prefiled" 3694, Line 12 Change "that a" to "for the" 3694, Line 13 Change "has revised to" to "as revised through" L.
MARCH 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 3695, Line 4 Change "as been supplemented" to " submitted" 3696, Line 20 Change "through" to "to" 3696, Line 23 Change " revolution" to " evolution" 3698, Line 10 Change " bill" to " submittal" 3699, Line 13 Add " responding to" before " matters"; change "in identi-fying" to " identified" 3699, Line 14 Change "to" to "at the"; put a period after " conference"s and then begin a new sentence with "As I understand it,"
3699, Line 16 Place a comma af ter " condition"; delete "As I understand it" 3699, Line 25 Place a period after "that"; capitalize the letter "f"
in "from" 3701, Line 5 Change " License's condition" to " License conditions" 3701, Line 8 Change " License's" to " License" 3702, Line 19 Change "and" to "then"; insert "have" before "N" 3702, Line 20 Change "it" to "the wall" 3705, Line 2 Change "end" to " ends" 3705, Line 3 Change "end" to "N" 3705, Line 9 Insert "part" after " upper" 3705, Line 19 Change "46.
The" to "46, the" 3707, Line 5 Change "these the steel" to "the steel plate which" 3707, Line 17 Change " bit of" to "better" l
3708, Lines 23 Change "in" to "N" 1
and 24 3
i 3709, Lines 13 Change "in" to "N"
and 22 4
3709, Line 23 Change " typing" to " tying" ii
4.
MARCH 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference""
Correction 3710, Lines 3 Change "in" to "N" and 14 3710, Line 5 Delete "followed with the construction" 3711, Line 22 Insert "when" before "we" 3712, Line 4 Change "in" to "N" 3712, Line 5 Change " plates" to "placed" 3712, Line 22 Insert "of the" before " Chairman"; remove the period; add the word "that" befcre "it" 3713, Line 19 Change "eight" to "78" 3713, Line 23 Change "and the question" to "in the answer" l
l 3716, Line 4 Change "chasted" to " chased" 3716, Line 6 Change "by" to "for" 3717, Line 3 Change " destruct" to "be struck" 3717, Line 17 Change "that with the" to "have other" l
3721, Line 8 Change " work" to " wood" 3721, Line 15 Change "SCR" to "SER" l
3721, Line 16 Change " Ewing" to " Viewing" 3724, Line 4 Change "obtained" to " contained" 3724, Line 25 Add " equipment" after " safety-related" 3725, Line 23 Change "- " to " spectra" 3726, Line 4 Change " remove" to " move" l
3726, Line 5 Change " spectres" to " spectra" 3726, Lines 6, Change " spectre" to " spectra" 7, 10 and 18
- 3726, Line 8 Change "- " to "and components."
3726, Line 10 Change " forward" to " floor" n.
MARCH 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction
~
3726, Line 11 Change "in" to "on" 3726, After Insert "A.
Yes" Line 18 3726, Line 19 Insert "Q." before "Mr. "
3726, Line 20 Insere "be" before " modified" 3727, Lines 1 Change " trace" to "crays" and 13 3727, Line 18 Change "whole" to " floor" 3728, Line 1 Change " trace" to " tray" 3728, Line 3 After " imposed?" insert "A.
Yes.
Q."
3730, Line 1 Change "20" to "21" in both instances 3731, Line 18 Change "5" to "6" 3732, Lines 20 Delete "the modification of" and 21 3733, Line 15 Insert "acceptab'.e* af ter " finds" 3734, Line 6 Change "ub lyr orioised" to "in our proposed" 3736, Line 3 Insert "be" af ter " conceivably"; change " generate it" to
" generated" 3737, Line 20 Change "gtaph" to " grout" 3738, Line 8 Change " contract" to " content" 3741, Line 10 Change "Broehl" to " Anderson" 3741, Line 13 Change "Q." to "Mr. Axelrad" 3742, Line 4 Change "is still" to "has"; change "into (earth's pristine)" to "the instrumentation" 3743, Line 3 Insert "the River and" following " parallel" 3743, Line 4 Change "with" to "will follow"; af ter " River's" add
" direction" 3743, Line 18 Change "a-typical" to "is typical" 0 --
MARCH 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 3744, Line 3 Change " coast" to " Trojan" 3745, Line 6 Insert " annunciator" af ter " shock" 3745, Line 8 Delete "in size" 3747, Line 22 Change "rught" to " proof" 3757, Line 4 Change " pipes" to " plates" 3760, Line 12 Change "four" to "for" 3760, Line 15 Change "gravit" to " grouted" 3760, Lines 17 Change "gravic" to " grout" and 21 3760, Line 20 Change "gravit-in" to " grouted in" 3760, Line 24 Change " ground" to " grouted" 3760, Line 25 Remove parentheses 3761, Line 1 Change "even raises the" to "8 is raised into" 3761, Line 3 Change "in" to "and" 3762, Line 22 Change "C of our" to "CFR" 3762, Line 23 Change "that it" to "what" 3762, Line 24 Change "not" to "no" 3764, Line 15 Change " inaccessible" to " accessible" 3764, Line 17 Change "a" to " adding" 3767 None xis tent page 3769, Line 7 Insert " room" after " document" 3769, Lines 9 Change "for your" to "cf ter the prehearing"; change "a" and 10 to "as to the"; insert "in an area" after " people" t
3769, Line 19 Change " projecting" to " protection" l
3770, Line 19 Change " base" to " bay" l
n
4.
MARCli 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 3772, Lines 7 Change " common tip" to " diamond-tipped" through 9 3774, Line 3 Change "Somebody illustrated" to "this is illustrated in" 3774, Line 18 Change " surface" to " service" 3775, Lines 15 Change " surface" to " service" and 20 3775, Line 18 Change " deal of case backup" to " yellow case backhoe" 3775, Line 25 Change "8" to "A" 3776, Line 16 Change " drawing" to " drilling" 3777, Line 2 Change " surveyor's" to " survey" 3778, Line 1 Change "miss the" to "may hit" 3778, Line 9 Change " situated" to " safety" 3780, Line 4 Change "..." to " drilled hole" 3780, Line 12 Change " hole" to "whole" 3780, Line 19 Change "45.(d)" to "45 feet"; change " Anderson" to " White" 3782, Line 1 Delete " frequent"; delete "to" 3782, Line 2 Change " thick" to " diameter" 3783, Line 4 Change "NSAR" to "FSAR" 3783, Line 15 Change " Excess" to " Access" l
3785, Line 18 Change " married to insulated wire" to "Acerican Insulated Wire" 3788, Line 9 Change " complete" to " plate" 3788, Line 21 Delete " bent" 3783, Line 5 Change ". vacant" to " wide flange" 3789, Line 9 Change " counter" to " column" 3789, Line 23 Change " tubing" to "2oving" m
MARCH 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 3790, Line 9 Delete " vault" 3790, Line 18 Change " grafting" to " grouting" 3790, Lines 18, Change " spaces" to " spacers" 19 and 21 3790, Line 22 Insert "Q."
before "But"; change " graft..." to " grout dams" 3790, Line 24 Change "graf ted down washers" to " grout dams" 3791, Lines 2 Change "Graftings" to " Grout dams" and 4 3792, Lines 4, Change " guard" to " guide" 5 and 6 3794, Line 22 Change " sites nuclear" to " seismically" 3796, Lines 5 Delete " hidden" and 7 3796, Line 22 Change " boring" to " lowering" 3797, Lines 11 Change "three" to "through" and 14 3797, Line 13 Change " cord" to " core" 3797, Line 22 Change "(a)" to "B"; change "X-L" to "EEXCEL" (all references in the transcript to "HL" or "XL", although not listed here, should be considered to refer to "EEXCEL")
3799, Line 11 Change " imply" to " simply" 3800, Line 9 Change " curbing" to " cribbing" 3800, Line 13 Change " floor" to " piece" in both -instances 3801-3880 Nonexistent pages j
3881, Line 6 At the end of, this line insert "for an" t
1 3881, Line 17 Delete " heretical" 3883, Line 20 Change " addition" to " condition" 3884, Line 9 After "Axelrad:" insert "There was no proposed license condition."
a
% MARCH 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 3886, Line 17 Change " crosses discussion" to "has been discussed" 3886, Line 22 Change "three in five" to "one, three and five" 3887, Line 22 Insert a period af ter " percent"; capitalize "in" 3887, Line 23 Insert a comma after "this" 3887, Line 24 Lower case the "T" in "There" 3888, Line 1 Change " depression" to " compression" 3888, Line 2 Change "that is less than" to "much less" 3888, Line 3 Change " pressure" to " compression" 3888, Line 19 Change "to" to "as has" 3889, Line 1 Change "in" to "N" 3889, Line 25 Change "You" to "I"
3890, Line 9 Change "for" to "or" 3891, Line 21 Change " plan" to " plant" 3891, Line 22 Delete "of the plan" 3893, Line 5 Change "98" to "9A" 3894, Line 9 Change " blanch" to " flange" 3894, Line 15 Change " count" to " column" 3895, Line 19 Delete "both" 3895, Line 20 Delete "and the" 3896, Line 7 Change "swanded (?)" to " slotted" 3896, Line 19 Change " white flanch" to " wide flange" 3897, Line 15 Change "on up" to "up to" 3897, Line 22 Change "The" to "Then
3898, Line 12 Insert " keep" between "to" and "the places" 3898, Line 19 Change " formed" to " swung" n
, MARCH 31, 1980 TRANSCRIPT CORRECTIONS T'. Reference Correction r
3899, Line 8 Change " great" to " grade" 3899, Line 17 Change "Ashial (?)" to "AASHT0" 3900, Line 8 Change "H" to "A" 3900, Line 24 Change " burden" to " vertical" 3900, Line 25 Change " concrete" to " complete"; change " weeping" to
" rigging" 3901, Line 2 Insert " inch" after " half" 3901, Line 4 Change "H" to "A" 3902, Line 2 Change "PTE" to "PGE" 3902, Lines 5 Change " effective rule" to " factor" and 6 3902, Line 18 Change " Anderson" to "McCollom" 3902, Line 19 Change "45" to "25"; change " reading" to " rating" 3902, Line 25 Change " evaluating" to " evaluated" 3903, Lines 3 Change " filler" to " failure" and 4 3903, Line 5 Insert a comma after " sliding"; change " die (?) potential" to " diagonal tension" 3903, Line 10 Delete " basis"; change " construction" to " capacity" 3903, Line 11 Change "sure" to " shear" 3903, Line 15 Insert " percent" after "3.5"; change "Walka (?)" to " wall" 3903, Lines 16, Change "rebarb" to "rebar" 21 and 23 3903, Line 17 Delete the period and "It" 3903, Line 23 Change "in" to "by" 3903, Line 24 Delete " con.11dering because that consumes" 3903, Line 25 Change " assuming severance" to "because it assumes damage" m
% MARCH 31, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 3904, Line 1 Change "rebarb" to "rebar" 3904, Line 7 Change " sheer" to " shear" (all references in the transcript to " sheer" should be so changed) 3904, Line 21 Change ""two 10" to
".2" 3905, Line 2 Change "sylinders" to " cylinders" l
3905, Line 7 Change " case" to " cast" 3905, Line 10 Change "D" to " day" 3905, Line 11 Change "gased" to " cast" 3906, Line 4 Change " existing" ; o " resisting" 3906, Line 17 Change " existence" to " resistance" 3906, Line 23 Change "it" to "at" 3907, Lines 15 Change " duck down" to " duct bank" through 17 3907, Line 17 Delete second "would" 3907, Line 22 Change " duck" to " duct" 3908, Line 24 Change " showing" to "shown" 3909, Lines 4 Change " duck" to " duct" and 6 3909, Line 4 Change " entity" to " energy" 3909, Line 5 Change " lobes" - to " loads" 3909, Line 9 Change "endulous" to " annulus" 3911, Line 7 Change "high" to " pipe"; delete "been" 3911, Line 8 Insert "would" af ter "we"; change "the like of" to
" pleased to do so for" 3911, Line 11 Change " cutting into" to " expanding the" n
. APRIL 1,1980 TRANSCRIPT CORRECTIONS
_Tr. Reference Correction 3918, Line 4 Change " Government" to " Licensee" 3920, Line 12 Change " gravity" to " grouted" 3921, Line 1 Change "Beanscen" to "when installed in" 3921, Line 3 Change " inca" to " anchor" 3923, Line 11 Change "HL" to "REXCEL" 3926, Line 20 Change "as" to "that" 3926, Line 22 Change " boring" to " lowering" 3928, Lines 3, Change "deframation" to " deformation" 5, 10, 11 and 13 3923, Line 23 Change " shoe" to " shear" 3931, Line 19 Change "otehr" to "other" 3933, Line 3 Change " CAT" to " CAD" 3935, Line 19 Change " casing" to " placing" 3935, Lines 24 Char- " sliding" to " seismic" and 25 3936, Line 7 Change " sliding" to " seismic" j
3938, Line 6 Change " surface" to " service" 3940, Line 13 Change " width" to "wythe" 3943, Line 13 Change " loopers" to " loops" in both cases 3949, Line 23 Change " Fletcher" to " flexure" (all future references to
" Fletcher" should likewise be changed) 3950, Line 1 Change " double-barge" to " damage the bars" r
3950, Line 12 Change "copule" to " couple" 3950, Line 21 Change " cline" to " plane" 3951, between Add the following response:
"A (White) Yes."
l l
Lines I and 2
APRIL 1, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 3955, Line 3 Change " plain" to " flange" 3957, Line 19 Change "prospractive" to " perspective" 3959, Line 1 Change " sitter" to " center" 3960, Line 13 Change "solumns" to " columns" 3960, Line 22 Change "plage" to " plate" 3964, Line 10 Change " guile" to " guide" 3969, Line 20 Change "96.7" to "96'7""
3974, Line 4 Change " Bat" to " slot" 3974, Line 20 Change " white" to " wider" 3975, Line 8 Change "criving" to " cribbing" 3977, Line 7 Change "auziliary" to " auxiliary" 3982, Line 18 Change " orange" to "four inch" 3984, Line 9 Change "ovserved" to " observed" 3984, Line 21 Change "there were" to "these" 3984, following Add the following: " describe that process."
Line 25 3985, Line 3 Change " performance" to "conformance" 3985, Line 6 Change "or" to "are" 3985, Line 14 Change "And we" to "And would" 3985, Line 18 Change "just" to "what" 3986, Line 17 Change "where is" to "where in" 3989, Line 4 Change "bable" to " cable" 3989, Line 24 Change "whole" to " hole" 3990, Line 24 Change "that will templet for that" to "we will make a template for that,"
9 O
. - APRIL 1, 1980 TRANSCRIPT CORFICTIONS Tr. Reference Correction 3991, Lines 15 Change " coded with a neo cream" to " coated with a and 17 neoprene" 3991, Line 22 Change "pentented" to "patenced" 3992, Lines 6 Change "micubula" to " cupula" and 12 3992, Lines 9, Change "thermoide" to " thermite" 14, and 20 3992, Line 11 Change " glass" to " blast" 3995, Lines 10 Change "Mr. Axelrad" to "Dr. Paxton" and 12 3995, Line 22 Change "Mr. Bell" to "Dr. Paxton" 4001, Line 5 Change "claried" to " clarifying" 4002, Line 6 Change "(white flanch)" to " wide flange"
)
4004, Line 10 Change " commission" to " conditions" 4005, Line 24 Change " Duke" to " Drew" 4006, Line 16 Change " Duke" to " Drew" 4012, Line 5 Change "' turbine building' and 'the'" to " turbine building and the" 4012, Lines 6 Change " cabin" to " cab" and 15 4012, Line 13 Change " delete 'all after purposes'" to " delete all words after purposes" 4012, Line 21 Change "next to" to "after" 4013, Line 2 Insert "the words" after "all" 4013, Line 21 Change " sheer..." to " shear stresses" 4014, Line 14 Change " ratios of" to " ratios for" 4015, Line 4 Change "and" to " add" 4015, Line 13 Change "on to" to "onto" n
APRIL 1, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4015, Line 13 Change "below," to "below occur,"
4015, Line 15 Change "and damage" to "and a damage" 4019, Line 1 Delete "put"; insert "be allowed to" before " extend" 4020, Line 7 Change " invited" to "provided" 4020, Line 8 Insert "there is" after "So" 4020, Line 15 Change " grounded" to " grouted" 4021, Line 15 Change " tao" to "chrough" 4023, Line 9 Change "graviting of" to " grouting for" i
4023, Line 14 Change "gravit" to " grout" 4023, Line 22 Change " crate" to " tray" 4024, Line 11 Charge "Mr. Trammell" to "Mr. Ostrander" j
4025, Line 1 Add "I am" at end of line 4025, Line 8 Change " controlled" to " proposed" 4029, Line 4 Change ". sed" to "you" 4030, Line 8 Change "PDE" to "PGE" 4033, Line 3 Change "of bedding" to " Building" 4033, Line 13 Change "Axelrad" to " Gray" 4036, Line 23 Change "as" to "from" 4037, Line 3 Change "10-C-04-2.760A" to "10 CFR 2.760a" 4037, Line 6 Change "608" to "2.760a" 4037, Line 7 Change "760A" to "2.760a" 4037, Line 15 Change "760A" to "2.760a" 4038, Line 20 Change "a... " to "an amendment" 4041, Line 7 Change "Ostrander" to "Axelrad" 4042, Line 19 Change "as" to "be" a
i
APRIL 1, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4052, Line 7 Change "ICC" to " Licensee" l
4056, Line 16 Change "someone putting" to "some input from"
}
4056, Line 18 Change "he" to "we" 4063, Line 12 Change "shouldn't" to "should" 4063, Line 12 Change "... bolts fixed" to "all bolts installed" 4063, Line 13 Change " mixed" to " snug" I
4064, Lines 19 Change " black drought" to " place drop" through 20 4067, Line 9 Change " aux 111ary" to " auxiliary" 4070, Line 5 Insert "A.
(Clemenson) Yes."
I 4070, Line 8 Insert "A.
(Clemenson) Yes."
l-4070, Line 25 Change "the and work" to '"the" and " work"'
j 4072, Line 3 Insert "A.
(Clemenson) Yes."
j 4072, Line 11 Delete "is" 4072, Line 12 Change "was to the" to "was in the" 4073, Line 14 Change "McGurren" to " Gray" 4075, Line 7 Change "a" to "the" 4075, Line 17 Delete "AND THE N" l
l 4075, Line 18 Insert "what" after "and" t
~
4075, Line 19.
Change " add" to "have" 4075, Line 21 Change " access ofr" to " access for" 4075, Line 22 Change "fitheing" to " fighting" 4075, Line 25 Change "reivew" to " review" 4077, Line 5 Delete "is" 4077, (ine 7 Change " detail of" to " detailed" i
l-t
APRIL 1, 1980 TRANSCRIPT CORRECTIONS a
Tr. Reference Correction i
4079, Lines 2 Change "Welvis alloyed" to " weldless alloy" 4
through 3 4079, Line 5 Add the word "more" before the word "than" 4079, Line 6 Change " shackle" to " master link" 1
4080, Lines 23 Change " load would cause the place to" to " force would through 24 come from to" 4081, Line 12 Change "your" to "the" l
4081, Line 13 Change " rewire" to "rebar" 4084, Line 5 Change "thecry" to " area" 4084, Line 18 Change "-- of the drop of washer" to "was of the drop of a washer" 4084, Lines 23 Change "on the -- let 's see - " to "over the cable trays";
through 24 change "- " to " damage" 1
4084, Line 25 Delete one "by dropping" 4085, Line 1 Change "here" to "the planking" 4086, Line 3 Change "(Knithgt)" to "(Knight)"
4086, Line 13 Change "Before" to "Therefore" 4086, Line 15 Change " dropouts" to " drop heights" 4087, Line 23 Change "conduants" to " conduits" 4088, Lines 4, Change "conduants" to " conduits" 10 and 11 4088, Lines 7 Change "(Kinght)" to "(Knight)"
l and 12 4088, Line 18 Change " extinction" to " extinguishing" 4089, Line 21 Change "my" to "the" 4089, Line 22 Change "to" to "my" 4089, Line 24 Delete "(?)"; change "ethelene (?) propane" to " ethylene propylene"; delete "- "; change "hypon (?)" to "hypalon" y..
APRIL 1, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4090, Line 1 Change "hydrgleed (?) test, when" to "IEEE-383' cable test is concerned, it was not" 4090, Line 7 Change "were" to "was" 4090, Line 8 Delete "And that the - "; delete "." after " reluctantly" 4090, Lines 9 Change " test, the Staff, as far as the Staff" to " test.
through 10 The Staff did not consider that as" 4090, Line 11 Change "you, was" to "you.
It was" 4090, Line 12 Insert " sane" before " configurations" 4090, Line 14 Change "I cripple" to "IEEE" 4091, Line 11 Change " foreign" to " form" 4091, Line 12 Change " divide" to " provide" 4091, Line 15 Change " coding" to " coating" 4091, Line 16 Change "a" to "the" 4092, Line 14 Change "and" to "on" 4092, Line 24 Change "Antenetti" to "Antonetti" 4092, Line 25 Change " engaged with" to " employed by Cage" 4093, Line 8 Insert " concerned." after "is" 4096, Line 8 Change "they will not be where" to ", when" 4096, Line 9 Change " going that" to " going on, that" 4096, Line 10 Change "certain" to " safety" 4096, Line 11 Change "way" to " area" 4096, Line 18 Change "am" to "an" 4096, Line 20 Change "he cannot take in" to "they will take in" 4096, Line 22 Change "we" to "they"; change "the" to "to" 4098, Line 10 Change " personnel" to " person" 4098, Line 11 Inser "on" after " accepted"
}
t APRIL 1, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4098, Line 25 Change "the things" to " things are" 4099, Line 1 Change "that that" to "that this" 4099, Line 18 Change "giving" to "given" 4100, Lines 5 Change "there certainly would not be capable" to "it would through 6 certainly show up" 4100, Line 6 Insert "and" before "would" 4100, Line 7 Change "do" to "can*
4101, Line 1 Change " simply" to " simple" 4101, Lines 13 Delete "a function of a" through 14 4101, Line 14 Insert "in nature" between " structural" and "which" 4103, Line 8 Insert " proof cranes as described in" between " failure" and "NUREG-0554" 4103, Line 17 Change "teh" to "the" 4103, Line 18 Insert " Regulatory Guide 1.104" between "in" and "has" 4104, Lines 3 Alter sentence to read "I can't answer the question."
and 4 4104, Line 22 Change " won't" to "will" 4105, Line 8 Change " north" to "wes t" 4106, Lines 13 Replace "The work is... answer." with "For example, con-through 19 crete removal from the grooves to be cut in the floor, periodic intervals, between Columns 41 and 46 along at Column Line N prime will utilize an electrically powered diamond saw.
I think it will be provided with a guard to prevent the applied water from being thrown by the saw and spraying the electrical cabinets as one might visualize from my previous answer."
4109, Lines 5 Replace "The noise level... control room." with "Aside through 7 from the control room the noise level I don't think is a big deal such as for example the electrical auxiliary room."
. APRIL 1, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction f
4109, Line 8 Change "INE" to "I&E" and 19 4112, Line 24 Change "left" to " lift" 4118, Line 17 Delete "d" between " adequately" and " dealt" 4119, Line 20 Change "who is" to "whose" 4120, Line 5 Insert " point" at end of sentence.
4120, Line 15 Change "wellees" to " weldless" 4120, Lines 17 Change "teagard to the welless, alloyd (?)" to " regard to through 18 the weldless alloy" l
4120, Line 19 Change "alloyd" to " alloy" i
4120, Line 25 Change " raided" to " rated" 4121, Line 6 Change "alloyd" to " alloy"
)
4121, Lines 22 Change " raided" to " rated" and 24 l
4122, Line 3 Change " raided" to " rated" 4127 Line 11 Change "slane" to " sling" 1
4122, Line 12 Chagne "hhe" to "the" l
l 4124-4299 Nonexistent pages I
l t
n
APRIL 2,1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4301, Line 11 Insert "Yes" af ter " witness:"
4304, Line 5 Change " plant brigade" to " planking" 4304, Line 10 Change " Board" to " planking" 4304, Line 11 Change "a" to "those carrying the board could lay it down out of the way and allow the" 4304, Line 12 Change "in" to "through" 4304, Line 14 Delete first "have" 4305, Line 21 Dele te " table" 4305, Line 23 Delete "there is"; insert "are" before "with" 4306, Line 1 Change " realize" to " relies" 4306, Line 9 Change "as if Liscensee's" to "that the license" 4307, Line 6 Del'ete "in charge" 4307, Line 7 Change " purchased " to " spur" 4307, Line 25 Change " descending" to " dissenting" 4308, Line 7 Change "inline" to "N-line" 4309, Line 24 Change "," to "."; change "which" to "It" 4310, Line 12 Change "this is a matter" to "these matters" 4311, Line 11 Change " tore" to "to be" 4311, Line 24 Change "Is it" to "It" 4313, Line 19 Change "or" to "on" 4314, Line 9 Change "are" to "cr" 4314, Line 22 Change " plate R 567" to " plates S. 6 and 7" 4315, Line 2 Change " beam" to " weld bead" 4315, Line 7 Change "then the timber area supports the cripts for the wood can be" to "then the timber and supports, and the cribbing or wood can be" n
, APRIL 2, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4315, Line 9 Change " mount" to " amount" 4315, Line 12 Change "in quarter inches of" to " inches of one quarter inch" 4315, Line 14 Change "SEE" to "SSE" 4313, Line 16 Change " bring you to your attention" to " bring to you; attention" 4316, Line 1 After " plate" insert "8"
4316, Line 14 Change " welds in the bolts" to " welds and the bolts" 4316, Line 18 Change "is having 5 bolts that he has mentioned replaced" through 19 to "and the 5 bolts that he mentioned are in place" 4317, Line 11 Change " grading" to " scaffolding" 4320, Line 14 Change "from with wall R" to "f rom wall R" 4320, Line 21 Change " molds" to " modes" 4322, Line 1 Change " plate 7 to plate 6" to " plate 8 to place 6" 4324, Line 1 Change " passing" to " loading" 4324, Line 10 Change "so" to "in" 4324, Line 21 Change "would be" to "would need" 4325, Line 4 Change " defined of" to "of 5 to" 4325, Line 10 Change " element" to " ultimate" and 13 4325, Line 14 Change "in mind" to " increased" 4328, Line 6 Change " place" to " plate"; change " spaces" to " spacers" 4330, Line 9 Change "dese" to "does" 4330, Line 10 Change "under" to "on the" 4334, Line 14 Change "in' to "on" 4334, Line 16 Change " proposal" to " proposed" 4338, Line 4 Change "himself" to "itself" t
m
. APRIL 2,1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4340, Line 3 Change "it may be refer to" to "we may be referring to" 4340, Line 4 Change " understand" to " understands" 4340, Line 14 Change "for instance" to " sequence" 4341, Line 8 Change "in prime" to "N prime" 4341, Line 18 Change " conflicts" to " Complex" 4342, Line 8 Change "new with all" to "new wall" 4342, Lines 17 Change " storage" to " story" and 18 4342, Line 22 Change " move" to "much" 4343, Line 2 Change "with all" to " wall" 4343, Line 9 Change " capacity" to " capacity of the" 4344, Line 7 Change "being" to " beam" 4344, Line 8 Change "better" to "rebar" 4344, Line 13 Change " bear" to "by" 4351, Line 9 Change " night" to " nice" I
l 4352, Line 24 Change " answer 1 An and E" to " answer 1A and E" 4355, Line 11 Change "W of B" to "V" 4356, Line 5 Change "B" to "V" 4358, Line 17 Change " vertical that is orthogonal" to " vertical. This is orthogonal" 4359, Lines 2 Change " force lapse" to " floor slabs" through 3 4359, Lines 4, Change " force" to " floor" 16 and 25 4359, Line 13 Change " sheer" to " shear" 4360, Line 3 Change " force slabs" to " floor slabs" 4360, Line 4 Change " comply" to " apply"
- i
- dRIL 2,1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4360, Line 17 Change "in our section" to "in the other section" 4361, Line 1 Change "say a complex wall in one" to "say in a complex wall, one" 4361, Line 2 Change " mechanisms is the beam-column connection va " to
" mechanisms is the beam-column connection.
k'a s "
4361, Line 8 Change " force slabs" to " floor slabs" 4361, Line 25 Change " brought" to " thought" 4363, Line 9 Change " enable" to "able" 4363, Lines 9 Change "abduccal" to " ductile" and 14 4363, Lines 19 Change " sheer" to " shear" and 21 4364, Line 5 Change " sheer" to " shear" 4364, Line 16 Change "page 47 co" to "page 47, the" 4364, Lines 20 Change "can you a test the adequacy" to "can you attest to through 21 the adequacy" 4365, Line 12 Change "a safety factor to" to "a safety factor of 2" 4365, Lines 17 Change " object taped" to "obtained" through 18 4367, Line 4 Change "I will have the same" to "it will have the same" 4368, Lines 2 Change " sheer" to " shear" and 16 4368, Line 17 Change "70 one" to "7 one" 4368, Line 19 Change " develop of a factored" to " factored" 4368, Line 25 Change "do you know what did for that on an" to "do you know what the slip for that is on an" 4369, Line 1 Change "unfactored -- I'm sorry-- for the factored OBE loading" to " factored - I'm sorry - for the unfactored OBE loading" 4369, Line 12 Change " sheer" to " shear" t
. APRIL 2, 1980 TRANSCRIPT CORRECTIONS
_Tr. Reference Correction 4369, Line 23 Change "so a Control Buih'ing is higher elevations of the Auxiliary" to "so, in the Control Building, in higher elevations of the Auxiliary" 4370, Line 6 Change "this would be for factored, it would be a" to "this would be for the unfactored OBE" 4370, Line 14 Change " sheer" to " shear" 4370, Line 16 Change ~15" to "13" 4371, Line 25 Change "some curvatures" to " single curvature" 4372, Line 18 Change "inneroperations" to " interim operation" 4372, Line 18 Change "what" to "what do" 4373, Line 17 Change "By the changeable response." to "By the change in recponse?"
4374, Line 10 Change "models" to " modulus" 4374, Line 16 Change "there was at one time" to "was that at one time" 4374, Line 24 Change " fine" to " finite" 4376, Line 2 Change " accounted" to " counted" 4377, Line 3 Change " sheer" to " shear" 4377, Line 13 Change " inducement" to " induced net" 4380, Line 6 Change "when" to "what" 4380, Line 20 Change " week" to "we can" 4381, Line 3 Change "or" to "our" 4383, Line 3 Change "hm" to "him" 4384, Line 5 Change "they" to "che" 4384, Line 19 Change " elements" to " level" 4385, Line 19 Change " module us" to " modulus" 4385, Line 23 Change " fine" to " finite" 4386, Line 1 Change " sheer" to " shear"
, l APRIL 2, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4386, Line 4 Change " fine" to " finite" 4386, Line 7 Insert "For" before "which"; change " testimony" to " test" 4386, Lines 11, Change " dampening" to " damping" 12 and 16 4386, Line 24 Change " decided" to " seismic" 4387, Line 5 Change "noles" to "salues" 4388, Line 16 Change "at the, the controlling," to " tension is not the" 4388, Line 21 Change " applicable" to " opposed" 4389, Line 7 Change " passages" to " capacities" 4389, Line 25 Change " sheer" to " shear" i
4390, Line 13 Change "300" to "150" 4390, Line 14 L.
age "calculace" to " calculated" 4390, Line 20 Change "SSA" to "FSAR" 4391, Line 7 Insert "is" before " satisfied" 4391, Line 15 Change "to order" to "with regard to" 4392, Lines 2 Change "that have been" to "of the" through 3 4392, Line 12 Chance " sheer" to " shear" 4392, Line 13 Change " sheer" (two places) to " shear" (two places) 4392, Line 17 Insert "a" af ter "there" 4393, Line 12 Change "of the" to "and the"; change " loads" to " modes" 4393, Line 25 Insert the word "and" between " sliding" and " diagonal" f
4394, Line 1 Insert "," after "cension" 4394, Lines 5, Insert the word "and" between " sliding" and " diagonal" 10 and 11 4396, Line 15 Change " top of" to " response to"
. APRIL 2,1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4396, Line 24 Change " capacity" to " paths" 4397, Line 16 Change " stiff he's" to " stiffest" 4398, Line 13 Change " figure" to " exhibit" 1
4398, Line 14 Change "63, 64, 65" to "6-3, 6-4, 6-5" 4398, Line 22 Insert the word "not" httween "is" and "a" 4399, Line 3 Insert the word "not" between "is" and "a" 4399, Lines 10 Change "if, the probability of the beams and" to "on the through 11 reliability of the bond of" 4399, Line 20 Change "UBC.
And" to "UBC and" 4399, Line 21 Change "that" to " dynamic" 4402, Line 15 Change " Staff" to " panel" l
l 4402, Lines 19 Change "the storing" to "of restoring" and 20 4402, Line 20 Change "my" to "by" l
4402, Line 22 Change "3678" to "3.6,
.7 and
.8" 4403, Line 9 Change " sheer" to " shear" 4407, Line 4 Change " fact of" to " factored" 4408, Lines 3 Cnange " sheer" to "ahear" and 4 4410, Line 19 Change " Miller" to "McCollem" 4412, Line 23 Change "DR." to "MR." (all further references to Dr. Holley should likewise be changed) 4413, Line 25 Change " sum vice" to " summarize" 4415, Line 25 Change "DR." to "MR." (all further references to Dr. Bresler should likewise be changed) 4418, Line 7 Change "DR. BRESLER" to "MR. AXELRAD"; change "That is" to "Is that"
. APRIL 2, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4419, Line 2 Insert the words "not try" af ter "did" 4419, Line 2 Change "did at this time" to "did take this time" 4419, Li..a 11 Change "but" to "by" 4419, Line 12 Change " developed" to "followed" 4420, Line 8 Change " factor" to " factored" 4421, Line 4 Change "SSE" to " testing" 4422, Line 6 Insert "on" before " stiffness" 4422, Line 8 Change " utility" to " ductility" 4424, Line 5 Change " sheer" to " shear" 4424, Line 25 Change " forced" to " fortunate" 4425, Line 21 Change "important one of the most" to "important, it WaS one" 4425, Line 24 Change " based on the need for" to "they provided evidence of" 4428, Line 9 Change " adequacy problems relate to the equipment and the special" to " problems related to equipment and the" 4430, Line 13 Change " contest" to " context" 4431, Line 22 Change "that we were doing a research program" to "if we were not doing a research program" 4432, Line 17 Change "rarrowly" to " thoroughly" 4432, Line 21 Change "would conservatively apply" to "were conserva-tively applied" 4432, Line 22 Change " code" to " ductility" 4433, Line 13 Changa "tersinations" to "dete rminations" 4434, Line 22 Change " horrendous to" to " horrendous compared to" 4434, Line 23 Change "but the rest" to " buttressed" 4436, Line 25 Change "had" to "that" O
29 -
APRIL 2, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4438, Line 6 Change " fine" to " finite" 4439, Lines 12 Change " storage sheers" to " story shears" and 20 4442, Line 6 Change "they" to "then" 4442, Line 21 Insert the word "not" af ter "did", and insert af ter
" program" the words "of panels and framing."
4442, Line 24 Change " force" to " floor" 4443, Line 10 Change "they are" to "that ars" 4449, Lines 4 Change "we are I necessary at the end if" to " weariness through 5 at the end of" 4450, Line 20 Change "in" to "if" 4452, Line 10 Change " recommended" to " corrected" 4453, Line 16 Change "can" to "are" i
f
\\
~
. APRIL 3, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4457, Line 18 Insert "you state" after "would" 4461, Line 20 Insert "be" after "possibly" 4466, Line 1 Insert "be" after "will" 4466, Line 9 Change "we" to "we're" 4466, Line 19 Change "now" to "not" 4466, Line 25 Change " Fletcher" to " flexure" 4467, Line 2 Insert "believe" af ter "not" 4470, Line 6 Change " performance" to " perform" 4471, Line 6 Change "in" to "N" 4471, Line 19 Change "would" to " weld" 4473, Line 1 Change " sheer" to " shear" 4473, Line 18 Change "vall line" to "R line" 4473, Line 19 Change "end" to "N" 4477, Line 21 Change "(specier)" to "SER" 4479, Line 8 Change " bore" to "for" l
4479, Line 9 Change " operated for" to " operating floor "
4479, Line 15 End sentence after "be"; start new sentence with "The" 4479, Lines 21 Change "be much" to "need" through 22 4479, Line 23 Change " inadequacy" to " adequacy" t
4479, Line 25 Change " side" to "outside" 4480, Line 3 Change " structure" to "structu4a1 witness" 4480, Line 10 Change "..." to "powet" 1
I 4480, Line 13 Change "(attitude) called for" to " adequacy of"; change j
"actitude" to " adequacy" 1
4481, Line 17 Change "(attendant)" to " intended" i
i L-n
b APRIL 3, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4482, Line 6 Change " adequacies" to " adequacy of the" 4485, Line 1 Change " Staff for" to " rest of" 4486, Line 12 Change " include" to " conclude" 4490, Line 8 Change "SSAR" to "FSAR" 4490, Line 14 Change "SFAR" to "FSAR" 4490, Line 22 Change " fell" to " cell" 4494, Line 4 Change "and result.
Items" to " unresolved items" 4494, Line 20 Change " imparting" to " reviewing" n.
- l
. APRIL 16, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4502, Line 5 Change " extra" to " expert" 4503, Line 2 Change " request
- to "present" 4503, Line 3 Change " structuring" to " structural" 4508, Line 2 Change " cord" to " core" 4509, Line 3 Change "Shang-Lo" to " Chang-Lo" (all future references to "Shang-Lo" should likewise be changed) 4521, Line 1 Change "wheelbrater" to "wheelgrater" 4522, Line 2 Change " filter" to " buildings" 4523, Line 7 Change " service" to "in-service" 4525, Line 7 Change " Wide" to "Wyche" 4527, Line 5 Change " Pat" to "Kenneth" 4528, Line 4 Change " Electrical" to "S. Webster" 4528, Line 14 Change "section" to " inspection" 4528, Line 15 Change "as the" to "ASME" 4530, Line 15 Change "Procleva" to "Brookhaven" 4530, Line 22 Change " translated BD" to " Appendix A of PGE" 4531, Line 3 Change "27" to "22" 4533, Line 9 Change "N/N" to "in./in."
4533, Line 11 Change "new" to "nu" 4533, Line 12 Change "dd" to "Vd" 4533, Line 14 Change "sub d" to "sub B" 4533, Line 15 Change "A sub d equals A sub d" to "A sub W equals A sub B" 4534, Line 10 Change " row" to " rho" 4538, Line 10 Change " trident" to "rather than" 4540, Lines 9, Change "in-plant" to "in-plane" 10 and 12 L
n
. APRIL 16, 1980 TRKiSCRIPT CORRECTIONS Tr. Reference Correction 4540, Line 25 Change "out-of-plant" to "out-of-plane" i
4 4541, Line 1 Change " responsive" to " response of" 4541, Line 4 Change " power" to " collar" 4541, Line 8 Change " life motored" to "wythe mortared" 4544, Lines 9 Delete "(Staf f Exhibit 21 was admitted into evidence)"
through 10 l
4545, Line 12 Delete "(Staff Exhibit 21 was admitted into evidence)"
I Change p. 4549 to 4548 New 4548, Change "to exhibit" to " expeditiously to" Line 19 Change p. 4550 to 4549 Change p. 4551 to 4550 New 4550, Change ":tr. Ostrander" to "Ms. Bell" Line 4 New 4550, Delete "Mr. Rosolie" Line 14 New 4550, Change "Q" to " Chairman Miller" Line 15 Change p. 4548 to 4551
/
New 4551, Change " fall" to " fail" Lines 5 and 23 4551, Lines 5, Change " plain" to " plane" 6 and 23 4555, Line 17 Change "22" to "21" 4557, Line 17 Change " white" to "wythe" 4558, Lines 7 Change " white" to "wythe" and 9 4559, Line 13 Change " white" to "wythe" 4560, Line 8 Change " preventive" to " compressive" m
. APRIL 16, 1980 TRANSCRIPT CGRRECTIONS Tr. Reference Correction 4560, Lines 9, Change " compressor" to " compressive" 16 and 20 4560, Lines 22 Change " seals" to " cells" and 23 4561, Line 12 Change " seal" to " cell" 4562, Lines 7 Change "M prime and then R" to "fE" through 8 4562, Line 18 Change " gravity" to " grout" 4565, Line 8 Change "M prime" to "F sub m prise" 4566, Line 21 Insert "10" before " psi"; change "- " to "and" 4570, Line 16 Change " flow" to " program" 4572, Line 13 Change "Mr. Paxton" to "Dr. l!cCo11om" 4574, Line 9 Delete " double"; change " kind" to " conduits" 4574, Line 22 Delete "18" 4576, Lines 9 Change "true" to "through" and 20 4576, Lines 8 Change "Dr. Colville" to "Mr. Herring" and 16 4584, Line 3 Change " tunnel" to " column" 4586, Line 16 Change " tunnel" to " column" 4609, Line 2 Change "three by two" to "three feet by two hundred pound" 4611, Line 25 Delete " site" 4615, Line 5 Change " deposit" to " composite" 4618, Line 3 Change "first" to "a per" 4618, Line 4 Change "of" to "to"; change "to" to "of the" 4618, Line 9 Change "of" to " times" 4618, Lines 10 Change "N factor" to "unfactored" and 14 l
m
APRIL 16, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4618, Line 12 Change ".14" to ". 41" 4619 Line 1 Change "4.068" to "1.068" 4619, Line 4 Change " complex" to " contact" 4620, Line 12 Change " air" to " area" 4622, Line 6 Change "isn't really" to "is a regional" 4626, Line 13 Change "N" to "10" 4632, Line 23 Change "Cray" to "Ostrander" 4638, Line la Change " specs" to " spectra" 4638, Line 22 Change " Ray" to " Reg" 4639, Lines 4, Change " Ray" to "deg" 8 and 16 4639, Line 6 Delete "3" 4642, Line 17 Change "PD" to "PGE" 4642, Line 18 Change " day" to "D" 4643, Line 25 Change " tinsel" to " tensile" 4644, Lines 6, Change " poll" to " pull" 14 and 18 4645, Line 25,
Change " unlined" to "N line" 4647, Line 2 Change " flow" to " floor" 4648, Lines 9 Change "backfilling" to "backfitting" and 22 4650, Lines 5 Change " red" to " Reg" and 11 4650, Line 16 Change " low" to " load" 4557, Line 19 change " accomplish" to " encompass" a
APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4662, Line 16 Change "2. 7" to ". 27" 4663, Line 2 Change " half" to " path" 4665, Line 20 Change " metals" te " transmittals and"; change "in the form" to "in, the form" 4665, Line 21 Change "that steel place," to "that, the steel plate, and" 4666, Line 6 Change " loaded" to " lowered" 4667, Line 10 Change "dropover would occur were" to " drop were to occur, unre" 4667, Line 17 Change " drops on seismic" to " drops and seismic" 4668, Lines 10 Change "compresser" to " compressive" and 11 4669, Line 3 Change " pressure" to " compressive" 4669, Line 7 Change " compressor" to " compressive" 4669, Lines 8 Change " compress-or" to " compress-ive" through 9 4669, Line 20 Change " approved NRC QIQC" to "NRC approved QA/QC" 4673, Line 22 Change "eseencially" to " essentially" 4674, Line 25 Change "25U and B" to "25U and V" 4675, Line 15 Change "3 of Exhibit 25" to "V of Exhibit 25" 4676, Line 17 Change " return" to " turn" 4682, Line 22 Change "Torjan" to " Trojan" 4684, Line 19 Change "everyong" to "everyone" 4685, Line 4 Change " closing" to " enclosing" 4685, Line 18 Change "Shang-lo" to " Chang-Lo" (all future references to "Shang-lo" should likewise be changed) 4685, Line 19 Change " Nile" to "Myle" 4687, Line 16 Change " bolt" to " loads" b
n
. APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4687, Line 17 Change "the wall" to "a wall" 4688, Line 14 Change " Trojan plants" to "the Trojan Plant" 4688, Lines 21 Change "have the reinforced masonry wall" to "have through 22 reinforced masonry walls" 4689, Line 4 Change "didn't" to "did" 4695, Line 6 Change " region five" to " Region V" 4696, Line 2 Change " Region 5" to " Region V" 4697, Line 25 Change "in" to "and get" 4698 Line 24 Change "or it would become under" to "should it become over "
4698, Line 25 Change " stress" to " stressed" 4699, Line 6 Change " column" to " complex" l
4700, Line 11 Change " inner" to " inter "
4700, Line 21 Change " plant" to " plan" (two places) 4701, Line 6 Change " efficiency" to " deficiency" 4701, Line 11 Change "But, Mr. Broehl" to "Mr. Broehl" 4702, Line 4 Change "of 79-15, December" to "of LER 79-15 in December" 4702, Line 5 Change "have" to "had" I
l 4702, Line 6 Change "at which time" to "during which time" 4702, Line 9 Change "is" to "was" 4702, Line 10 Change "been not" to "not been" 4703, Line 2 Change "0.25g, say, seismic" to "0.25g safe" 4704, Line 16 Change "and which" to "and on which" 4712, Line 22 Change " existing" to " resisting" 4712, Line 24 Change "flexual" to " flexural" n
. APRIL 17, 1980 TRANSCRIPT COP.RECTIONS Tr. Reference Correction 4719, Line 3 Change "their" to "they're" 4726, Line 5 Change " thousandths" to " thousands" 4729, Line 18 Change " wall," to " wall of" 4733, Lines 9 Change " sensitive" to " insensitive" and 10 4734, Line 4 Change "1/2" to "1-1/2" 4737, Line 9 Change "this even" to "this" 4738, Line 12 Change " nation.
It's" to " construction" 4740, Line 8 Change "take actually" to "take' place actually" 4740, Line 17 Change "is" to "has" 4745, Line 23 Change "out-plane" to "out-of-plane" 4758, Line 9 Change "quantifications" to " modifications" 4758, Line 10 Change " vector" to " spectra" 4759, Line 8 Change " phrase" to " phase" 4760, Line 23 Change "PGE 10-20, as revised with" to *PGE-1020, as revised through" 4761, Line 19 Change "Trainor" to "Trammell" 4762, Line 4 Change " warning that" to " morning" 4763, Line 2 Change "it's about to destroy" to "I was about to describe" 4763, Line 3 Change "dirrectory which do destroy to" to " record which j
do describe" i
4763, Line 6 Change "for" to "during" i
4763, Line 9 Change "PG 10-20" to "PGE-1020" 4763, Line 24 Change " Document" to " Seismic" 4763, Line 25 Change "- " to " Piping" l
l 4764, Line 4 Change "to deciphering qualification" to "to qualification" l
L
_m
APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4764, Line 5 Change "to deciphering qualifica " to "to qualifica "
4764, Line 6 Change "oiping" to " piping" 4764, Lines 6 Change "to deciphering qualifications" to "to through 7 qualification" 4764, Line 7 Change " electrical systems" to " electrical cable tray systems" 4764, Line 8 Change "to deciphering qualification" to "to qualification" 4764, Line 21 Change "as - " to " spectra. "
l 4764, Line 22 Change " spectrum I" to " spectra are" 4764, Line 24 Change "25" to "25U"; change " March 9th" to " March 17th" 4765, Line 1 Change "-- on the one" to " spectra are the ones" 4765, Line 4 Change " specter" to " spectra" 4765, Line 7 Change " trace" to " tray" 4765, Line 9 Change " piling suppcre" to " piping supports" 4765, Line 11 Change "- " to " spectra" 4765, Line 12 Change "I"
to "the" 4765, Line 21 Change "- " to " hearing" 4765, Line 22 Change " sop" to "so"; change "- " to "and" 4765, Line 23 Change "- " to "since" 4765, Line 25 Change "nofficial" to " official" 4766, Line 2 Change "so thera are matters there that occurred" to "so if there are matters there that occur" 4766, Line 3 Change "evidentialry record here - " to "the evidentiary record here,"
4766, Line 4 Change "unto" to "to" 4766, Line 15 Change "permse" to "per se"; change "phas e 2" to
" phase 2"
l
. APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction.
4767, Line 10 Change "- " to " Board"; change "were" to "here" 4767, Line 16 Change " spray" to " base" 4768, Line 15 Change "or" to "so" 4769, Line 7 Change " Speaker" to "MR. OSTRANDER" 4769, Line 9 Change "but" to "as we"
'+769, Line 10 Delete "of this section" 4770, Line 4 Change " stipulating to" to " stipulating - to" 4770, Line 8 Change "There was," to "There it was,"
4770, Line 14 Change "you" to "your" 4770, Line 17 Delete "and."
4770, Line 21 Change "your ' re" to "you ' re" 4773, Line 6 Change "is really" to "there is really" 4773, Line 9 Change " license coerce kind" to " license or coerce a kind" 4774, Line 4 Change "MR. OSTRANDER" to "MR. JOHNSON" 4776, Line 24 Change "Dr. Coldwell" to "Dr. Colville" 4777, Line 1 Change "Our" to "Whose" 4777, Line 3 Change "Mr. Brandt" to "Mr. Broehl" 4777, Line 6 Delete "not" 4777, Line 20 Change "MR. AXELRAD: Part" to "MR. AXELRAD: We can make it part" 4778, Line 3 Change "that" to "what" 4778, Line 5 Change "Grell" to "Broehl" 4778, Line 8 Change "The" to "In the" 4778, Line 9 Change "- " to "concerning" 4778, Lines 9 Change "Dr. Coldwell's" to "Dr. Colville's" and 12 i
e n
. APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4778, Line 16 Change "the survey" to "b'en served a" e
4779, Line 3 Change "- " to " document,"
4779, Line 17 Change "of the type of the State" to "up-to-date" through 18 4779, Line 21 Change "- " to "af ter" 4780, Line 1 Change "- " to " panel" 4780, Line 5 Change "- " to " questions" 4781, Line 9 Change " reported" to " departed" 4782, Line 7 Change "Ingleton" to "Engelken"; change " region 5" to
" Region V" 4782, Line 14 Change " double-life" to " double-wythe" 4783, Line 12 Change " sheer" to " shear" 4783, Line 14 Chacge "has" to "have" 4783, Line 20 Change "of the small but two-cest" to "of the lowest two test" 4784, Line 7 Change "- " to "the plant" 4785, Line 1 Change " thicknesses" to "stiffnesses" 4785, Line 11 Change "- " to "know" 4785, Line 14 Change "would not attend, adequately attend, for the analyses" to "would not be accounted, adequately accounted, for in the analyses" 4785, Lines 15 Change " specially supported reactions to the increase." to through 16
" seismically supported reactions to increase."
4785, Line 18 Change " plant" to " plants" 4788, Line 1 Change "-- the value to stress," to "First, the value of stress,"
4788, Line 2 Change " great, by Dr. Fogel" to " created, by Dr. Colville" 4788, Line 10 Change "regarding all problems" to "submittals regarding the wall problem" i
n
- APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4788, Line 11 Change "there 50 p.s.1. minimum open it," to "their 50 psi minimum ultimate,"
4788, Line 13 Change " water" to " mortar" 4788, Line 14 Change "open it." to " ultimate."
4788, Line 26 Change " feed the 18 p.s.i., but" to " exceed the 18 psi, by" 4789, Line 1 Change "p.s.1., " to "as high" 4789, Line 10 Change "that would wipe off" to " double wythe block" 4789, Line 12 Change " expressed" to "and stress" 4789, Line 14 Change " platform of two days" to " block walls" i
4789, Line 21 Change " license each panel" to " licensee's panel" 4789, Line 22 Change "in" to "on" 4789, Line 24 Change " white fall?" to "wythe walls?"
4790, Line 2 Change " freak impression" to " degree of compression" 4790, Line 5 Change "18" to " seam" 4790, Line 6 Change "agus" to "agous"; change " pollard" to " collar joint" 4790, Line 7 Change "Radenmeyer" to "Hagemeyer"
.4790, Line 9 Change "of" to "on" 4790 ine 13 Change " sheer" to " shear" 4790, Line 15 Change "- " to " data" 4790, Line 16 Change " lock of - " to " block material" 4790, Line 18 Change "a fact of" to " effective" 4790, Line 20 Change "y's apart, and the y," to "w; it-apart, and the 67thes,"
4790, Line 21 Change "to compression" to "into crmpressica' 4790, Line 22 Change "a sheer curcheon" to " shear friction"
- APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4790, Line 23 Change "-- even though" to "know" 4790, Line 26 Change " border" to " mortar" 4791, Line 1 Change " sheer pressure" to " shear friction" 4791, Line 2 Change "in the factory in" to "and the fact" 4791, Line 4 Change "23 base length" to "23 based on" 4791, Line 12 Change "S. E." to "SER" 4791, line 13 Change "or on the wall problem" to "on the wall problem" 4791, Line 19 Change " lacked" to " acted" 4791, Line 24 Change " flow" to " block" 4791, Line 26 Change "verocity" to "porocity" 4792, Line 4 Change "Dr. Cogle's" to "Dr. Colv111e's" 4792, Line 7 Change " bulk" to " block" 4792, Line 11 Change "where" to "for" 4792, Line 14 Change "that are ore velicians - " to "that are different "
4793, Line 5 Change " poles" to " bolts" 4794, Line 19 Change "porportional" to " proportional" 4794, Line 25 Change " track sizes, a track size" to " crack sites, a crack size" 4795, Line 3 Change " factor safety" to " safety factor" 4795, Line 12 Change "LOCA" to " licensee" 4795, Line 25 Change "I and" to "IE" 4796, Line 1 Change "E Bolt in 7902" to " Bulletin 7s-02" 4796, Lines 3, Change "7902" to "79-02" 6 and 8 4796, Line 9 Change " frozen" to " Trojan" 4796, Line 13 Change " account" to " accounting" i
L n
APRIL 17, 1983 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4796, Line 17 Change " pole" to " bolt" 4796, Line 21 Change "strengent" to " stringent" 4797, Line 9 Change " deposit" to " composite" 4797, Line 11 Change "so forth. Where" to "so forth, where" 4797, Line 18 A?.d "if it were" before "to crack" 4797, Line 19 Change "make" to "take" 4797, Line 20 Change " pore by" to " bolt co" 4797, Line 23 Change " comfort" to "conplex" 4797, Line 25 Change "and" to "an" 4798, Line 22 Change "you put in there, you" to "you put walls in there, and you" 4799, Line 9 Change " VOICE:" to "MR. GRAY:"
4799, Line 12 Change " VOICE:" to "MR. GRAY:"
4800, Line 14 Change "porposing" to " proposing" 4800, Line 17 Change "into safety related wall" to "into the category of safety related wall" 4800, Line 19 Change "stardine" to "STARDYNE" 4801, Line 5 Change "none" to "one" 4801, Line 7 Change " trojan" to " Trojan" 4801, Line 8 Change "SFAI" to "FSAR" 4801, Line 19 Change " cheer" to " shear" 4802, Lines 3, Change "stardine" to "STARDYNE" 7 and 8 4802, Line 19 Change "in turpine" to "in the turbine" 4803, Line 6 Change "that" to "those" 4803, Line 8 Change "So I think all - " to "Also I think a" A
I APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4803, Line 16 Change " bubble block with the morton collar communities with the" to " double block with the mortared collar cavities with the" 4805, Lines 1 Change " tempt you" to " resolve this" through 2 4805, Line 3 Add " CHAIRMAN MILLER:" before "According" 4805, Line 6 Delete "scrantive" 4805, Line 12 Change "under the control buggy.
The - " to "in the Control Building. The panel" 4806, Line 2 Change "wc -- we are" to "the criteria are" 4806, Line 5 Change "exemptary" to " extemporary" 4806, Line 8 Change "significant" to " significance" 4806, Line 9 Change " reviewed and once" to " reviewed once" 4807, Line 6 Change " pin points" to "10 psi" through 7 i
4808, Line 25 Change " fuels -- spent fuels were allowed" to " fuel were in the Spent Fuels Pool" 4810, Line 1 Change "concerning" to " concern" 4810, Line 7 Change "judicatary" to " adjudicatory" 4810, Line 10 Change "with" to "which"; change " stage" to " safe" 4810, Line 15 Change "in" to "and" 4810, Line 16 Change "the vessel" to " operation" 4810, Line 20 Change " plan" to " plant" 4811, Line 5 Change "- " to "done" 4812, Line 6 Change "our" to "the"; change " cur" to "how" 4812, Line 18 Change " Board" to ' word" 4812, Line 23 Change " sheer" to " shear" 4812, Line 24 Change " double-y mastry wall" to " double-wythe masonry wall" n
.~ APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr. Reference Correction 4813, Line 1 Change " sheer" to " shear" 4813, Line 12 Change "-- in with" to "within" 4813, Line 13 Change "was still there" to "that was still there" 4813, Line 23 Change " radiations" to "rsdiation" 4814, Line 18 Change "and pin," to "and pin ends" 4814, Line 19 Change "enertia" to " inertia" 4814, Line 20 Change "and the response spectre" to "of the response spectra" 4814, Line 22 Change "run out in" to "have any"; change "where" to "or" 4814, Line 23 Change " stress is" to " stresses"; change "10 pin" to
" pin-pin" l
4815, Line 19 Change "Dr. Cobel" to "Dr. Coville" 4817, Line 8 Change "- " to " walls fixed" 4t17, Line 9 Change "is resolved" to "as resolved" 4818, Line 24 Change "we're" to "they're"; change " performed" to
" performed,"
4820, Line 3 Change "than" to "then" 4820, Line 9 Change "Mr. CXELRAD" to "MR. AIELRAD" I
4820, Line 24 Change "we 'll provide" to "we've provided" 4821, Line 6 Change " exhibits" to " exhibit" 4821, Line 22 Change "incoorporate" to " incorporate" 4822, Line 14 Change "36 A licensees" to "36A, licensee's" 4822, Line 15 Change "LDR 79 15" to "LER 79-15" 4822, Line 20 Change " January 18, 1980 provided" to " January 18, 1980 which provided" 4822, Line 21 Change "thermo" to " thermal" 4822, Line 22 Change "from a licensee" to "from licensee" l
t l
l
APRIL 17, 1980 TRANSCRIPT CORRECTIONS Tr Reference Correction 4823, Lines 3 Change "from a licensee" to "from Licensee" and 6 4823, Line 11 Change " water" to " mortar"; change "masonary" to " masonry" 4823, Line 23 Change " employees of" to "of the parties or" 4824, Line 9 Change "a expedite" to "an expedited" 4824, Line 23 Change " expedite" to " expedited" 4824, Line 25 Change " department" to " development"; change "lengthly" to " lengthy" 4827, Line 1 Change "MR. OSTRANDER" to "MR. AXELRAD" 4827, Line 7 Change "the ICB" to "PGE" 4828, Lines 2, Change "MR. OSTRANDER:" to "MR. AXELRAD:"
6 and 12 4828, Line 16 Change "evidencary" to " evidentiary" 4828, Line 23 Change " April 16th" to " April 17" It is so ordered.
FOR THE ATOMIC SAFETY AND i
LICENSING BOARD
]
AA Marshall E.' frilleb, Chairman -
Dated at Bethesda, Maryland j
this 22nd day of May 1980.
n I