e

,9 8006190456

. . TOLEDO

%se EDISON A c-:.;; P Ch5E lll Y Docket No. 50-346 w # m w, License No. NPF-3 Serial No. 617 May 15, 1979 Director of Nuclear Reactor Regulation Attention: Mr. Robert N. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Reid:

Enclosed is Revision #6 to the Davis-Besse Nuclear Power Station Unit #1 fire hazard report. This revision is submitted as a result of detailed design and construction activity where several areas originally designated to have fireproof coatings installed could not be effectively protected by this method. Due to inaccessibility and obstructions additional fire suppression systems are being installed to provide alternative protection.

This revision describes these new changes.

Very truly yours, ff W = ^-