Forwards Scenario Packet for 1989 Exercise for Review & Approval.Hardware & Software Mod Necessary for Appropriate Level of Effectiveness.W/O Encl
ML17285A845
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/02/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-89-132, NUDOCS 8911160002
Download: ML17285A845 (3)


Text

ACCELERATED 'DISTRIBUTION DEMOIOIRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8911160002 DOC.DATE: 89/08/02 NOTARIZED: NO DOCKET g FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME, RECIPIENT AFFILIATION Gv~D.G. Region 5, Ofc of the Director

SUBJECT:

Forwards scenario packet for 1989 exercise for review &

approval.W/o encl.

DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR TITLE: Emergency Preparedness-Appraisal/Confirmatory g ENCL 0 SIZE:

Action Ltr/Exercise Rep 1

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME'D5 LTTR ENCL ID CODE/NAME LTTR ENCL PD SAMWORTH,R INTERNAL: AEOD/DOA/IRB NRR/DREP/EPB 10 NRR/PMAS/ILRB12 ~DOCS-ABSTRACT OC/LFMB RGN5 FILE 01 EXTERNAL: LPDR NRC PDR NSIC L

~ .A D

NOTE TO ALL "RIDS" RECIPIENTS:

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCU NT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL ~g

Ir ly

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99382".

"-- 7

'~: 0/

August 2, 1989 G02"".9-132 Ns. Gail Good NRC, Region V 1450 Maria Lane, Smith 210 Halnut Creek, CA 94596-5368

Dear Ns. Good:

Subject:

EXERCISE 89 SCENARIO PACKET

References:

a) Letter, R.A. Chitwood to G. Brown, subject: Plant 2 Emer-gency Drill and Exercise Schedule, dated December 14, 1988 b) Letter, R.A. Chitwood to G. Good, subject: Exercise 89 Objectives and Limitations, dated June 30, 1989 The projected schedule and scope of emergency drills and exer cises for Plant 2 were furnished by reference a. This committed to the inclusion of protected area evacuation by Exercise '93. Tentative objectives and limitations for Exercise 89 were furnished by reference b.

Three draft copies of the current exer cise scenario packet are enclosed for your review and approval. Objectives differ from the earlier submission by deletion of what had been Supporting Objective 2c 3) on accountability. After close examination of the accountability contingency we believe that a modification of both the hardware and the software is necessary in order to bring this system to the level of effectiveness we deem appropriate.

our intent to proceed with the design and installation of this modification It is and then conduct the accountability drill at a later time. As soon as the work package is defined and integrated into the ongoing work schedule we will advise you of the time frame for this drill.

guestions or comments on the dt aft scenario packet should be addressed to me at (509) 372-5238, or to R.D. Nogle at (509) 377-8060.

/c'i.,

Very truly yours, G.C. Snreneen (MD 280)

Manager, Regulatory Programs cc: R.B. Samworth - NRC C.J. Bosted - NRC Resident Document Control Desk - NRC 89iii60002 S90802 PDR 4DOCK 05000397 PDC