ML17285A715

From kanterella
Jump to navigation Jump to search
Requests Extension to FSAR Amend 40 Submittal Date Until Sept 1989
ML17285A715
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/01/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-89-151, NUDOCS 8909150364
Download: ML17285A715 (3)


Text

f gt REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8909150364 DOC.DATE: 89/09/01 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Requests for extension to FSAR Amend 40 submittal date until Sept 1989.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: D TITLE:'OR Submittal: General Distribution NOTES:

l' RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA PD5 PD SAMWORTH,R D INTERNAL: ACRS 6 NRR/DEST/ADS 7E NRR/DEST/ESB 8D 1 NRR/DEST/ICSB NRR/DEST/MTB 9H NRR/DOEA/TSB 0

ll 1 1

1 NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS2 REG FILE 01 1 RES/DSIR/EIB EXTERNAL: LPDR NRC PDR NSIC NOIE 'lO ALL 'KIDS" R1KIPIBGS:

PLEASE HELP US TO REDUCE KQHB! CXÃ7ACZ 'IHE DOCUMENT CDNIHDL DESK, ROCM Pl-37 (EXT. 20079) m EIQ25ZKQR HER MNE PKH DISTRIBUTION LISTS HER DOCUMENIS KRJ DGNiT NEEDf 8 TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL

g

~~

~ 4~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 September 1, 1989 G02-89-151 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-.137 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NO. NPF"21 REQUEST FOR EXTENSION TO FSAR AMENDMENT NO. 40 SUBMITTAL DATE

Reference:

Letter," G02-88-184, G.C. Sorensen (SS) to NRC, "Amendment No. 39 to the WNP-2 Final Safety t

Analysis Repor (FSAR)", dated August 26, 1988 Based upon the date of our previous FSAR submittal, the Supply System planned on filing the next subsequent amendment in August, 1989.

However, we now recognize that due to the current status of the amendment package we will need to delay submittal of the annual report until September.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs SIS/bk cc: JB Martin - NRC RV NS Reynolds - BCPER Samworth NRC RB DL Williams - BPA/399 po NRC Site Inspector - 901A

(~

a,9O'90 i 8909i ADOCK OeOOO39- poc PDR P

'P ~

P 1