ML17285A498

From kanterella
Jump to navigation Jump to search
Requests That 21 Addl Days Be Granted for Response to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thining, Due to Util Not Receiving Ltr Until 890523
ML17285A498
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/24/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-08, GL-89-8, GO2-89-098, GO2-89-98, NUDOCS 8906050222
Download: ML17285A498 (4)


Text

])) BU'EON DEMONS TlON SYSTEM I

REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:8906050222 DOC.DATE: 89/05/24 NOTARIZED: NO DOCKET N FACIL:50-399 RPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Requests that 21 addi days be granted for response to generic ltr 89-08.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR / ENCL I SIZE:

TITLE: OR Submittal: General Distribution NOTES:

I RECIPIENT COPIES>> RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 SAMWORTH,R 5 5 INTERNAL: ACRS 6 6 NRR/DEST/ADS 7E 1 1 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB D NRR/DEST/RSB 8E NUDOCS-ABSTRACT 1

1 1

1 1

1 NRR/DEST/MTB 9H NRR/DOEA/TSB OC/LFMB ll 1 1

1 1

1 0

OGC/HDS2 1 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR NRC PDR 1 1 NSIC 8

I D

S h

D NOIE 'IO ALL "RIDS" RECIPIBGS'IZASE S

KKP US ZO REDUCE %RITE! CXNIACZ 'LHE DOCUMENZ CONTROL DESK RDCN Pl-37 (EXT. 20079) KO ELXKBQXB ACR 5AMB FBM DISTRZHlXXON ZZGXS ma DocmawrS mu DOWiT mm!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL 26

~'i

,y = l 4'j lft h

4

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99362 May 24, 1989 G02-89-098

,Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Nail Station Pl-137 Washington, DC 20555 Gentlemen:

Subject:

GENERIC LETTER 89-08 EROSION/CORROSION-INDUCED PIPE HALL THINNING

Reference:

Generic Letter 89-08, J. G. Partlow (NRC) to All Licensees and C. P. Holders, dated May 2, 1989.

The subject Generic Letter requested that all licensees respond, pursuant to 10 CFR 50.54(f), within 60 days of the date of the subject letter.

Although the Generic Letter was dated Nay 2, 1989, it was not received by the Washington Public Power Supply System until May 23, 1989. For reasons unknown to us, the letter was received a full 21 days after its issue date, thus reducing our time to respond to 39 days.

The purpose of this letter is to request that an additional 21 days be granted for the response to Generic Letter 89-08. Our response would thus be due to the NRC by July 22, 1989.

We have recently expressed concern over the delayed receipt, of Generic Letter 89-06, which we received 30 days after issue date. These two recent events suggest that there may be a distribution problem within the NRC. A preferred solution to this problem would be to base response dates on date of receipt by licensees, not date of issue. Our concerns have been brought to the attention of Mr. Partlow in a telephone conversation on May 23, 1989.

r 89060g0g DR >>

F gg) OCg 890gp 050 039'gQ

U. S. Nuclear Regulatory Commission Page 2 GENERIC LETTER 89-08 EROSION/CORROSION-INDUCED PIPE MALL THINNING If there are any questions regarding this request, please contact me- at (509) 372-5238.

Very truly yours, G. C. orensen, Manager Regulatory Programs (MD 280)

GCS/db cc: Mr. C. J. Bosted, NRC Site Inspector (901A)

Mr. J. B. Martin, RV NRC Mr. J. G. Partlow, NRC Mr. N. S. Reynolds, BCPSR Mr. R. B. Samworth, NRC