Forwards Status of Implementation of TMI Action Plan Items for Plant,Per 890414 Request.Implementation of Issue II.F.1.2.B Considered by Util to Be Complete Based on Last Ltr to NRC
ML17285A411
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/18/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TASK-***, TASK-TM GO2-89-064, GO2-89-64, NUDOCS 8904270401
Download: ML17285A411 (11)


Text

gc CPLE ~TH) DI BUTION DEMONS TIO'.i SYSTEM

"0 REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

)

ACCESSION NBR:8904270601 DOC.DATE: 89/04/18 NOTARIZED: NO DOCKET FACIL:50-397,WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards status of implementation of TMI action plan'items for plant,per 890414 request.

DISTRIBUTION CODE: A046D TITLE: OR Submittal: TMI Action Plan COPIES RECEIVED:LTR i ENCL J Rgmt NUREG-0737 & NUREG-0660 SIZE: //

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PDS PD 5 5 SAMWORTH,R 1 1 INTERNAL: ACRS NRR/DEST/ADS 7E NRR/DREP/EPB 10 NUDOCS-ABSTRACT 6

1 1

1 6

0 1

1 AEOD/DSP/TPAB NRR/DEST/MEB 9H NRR/DREP/RPB 10 OC/LFHB l,l 1

1 1

1 1

0 OGC/HDS2 1 0 E 01 1 1 RES/DSIR/EIB 1 1 DS DEPY 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 S

h D

NVZE LO ALL 'RIDS" R1XZPIBGS'LEASE S

HELP US IO REIXJCE %MHZ! CONI'ACT 'IHE DOCUMEÃZ CONTROL DESK, RXN Pl-37 (EXT. 20079) IO EliBKQCQB KKR NAME FRY DISTIGBOFZQN LISTS FQR DQCllMEHZ8 LOU DQHiT NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 23

i l

R

~ .

~

I. M I

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 April 18, 1989 G02-89-064 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 STATUS OF IMPLEMENTATION OF TMI ACTION PLAN ITEMS

Reference:

Letter, TE Murley (NRR) to GC Sorensen (SS),

same subject, dated April 14, 1989 The reference letter requested that the Supply System promptly review and report the status of implementation of TMI Action Plan items at HNP-2. The letter requested that this information reach the NRR offices by April 18, 1989.

In accordance with the guidelines contained with the above request, the Supply System has marked up the enclosure and included it as Attachment 1 to this letter.

Based on our review, we have identified only one open issue (MPA-F071). See for clarification.

Implementation of issue II.F.1.2.B is considered by the Supply System to be complete on the basis of our last correspondence to the NRR (G02-87-0284 dated December 14, 1987). See Attachment 2 for further clarification.

890427040'90418 05000397 PDR ADDCK P PNU

A v p ~

Page Two STATUS OF IMPLEMENTATION OF 'PlI ACTION PLAN ITEMS The Supply System hereby certifies that the information contained herein is correct to the best of our knowledge recognizing the limited amount of time that was able to be expended due to the extremely short response period.

Yery truly yours,

. C. Sorensen, Manager Regulatory Programs I t

HLA/bk cc: JB Martin NRC RV NS Reynolds - BCP8R RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector - 901A

Status of Implementation of STATE OF WASHINGTON )

Subject:

TMI Action Plan Items

)

COUNTY OF BENTON )

I, R. LATORRE, being duly sworn, subscribe to and say that I am the Manager, Corporate Licensing & Environmental, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

OATE rf'B,1989 R. LATORRE, Manager Corporate Licensing 8 Environmental On this day personally appeared before me R. LATORRE to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this ~+ day of ,1989.

Notary Pu lac )n and or t e State of Washington Residing at .*

/Fly Eerorrr 5s'~ d~pn u's 7/f f/yy

lg ill>gl," (

I 'I

ATTACHMENT 2 Item II.F.1.2.B Accident Monitoring Iodine/Particulate Sampling As previously indicated, the Supply System has installed what we consider to be an adequate sample system. On that basis, the Supply System considers tHe implementation of this item to be complete. As discussed in our letter, G.C.

Sorensen (SS) to J.B. Martin (NRC RV), G02-87-0284, "Position on Iodine Plate-Out", dated December 14, 1987 the Supply System had agreed to fund a plant specific study in the spring of 1989 to further quantify and aid in evaluating the WNP-2 effluent sampling system. This study, to be conducted by SAIC, is scheduled for the 1989 outage commencing in May 1989. It is antici-pated that testing, evaluation of data, and a final report should be completed within six months following the completion of the 1989 outage. At that time, given favorable results the Supply System expects to be able to provide the results of the study and justification for closing this issue.

~ ~

PI

ATTACHMENT 3 Issue No. MPA-F071 Item I.D.1.2 Detailed Control Room Review (Followup to F08)

Under Item I.D.1.2 there are five (5) tasks remaining to be implemented. Four of them are identified hardware tasks (see below) and the remaining task (No.

5) is being evaluated. The four hardware tasks are currently projected to be completed by August 1990. Task 5 is associated with resolution of Revision 4 to the Emergency Procedure Guidelines. Resolution of this task, which may include major hardware modifications, is not projected to be completed by August 1990 as previously stated in the March 29, 1988 letter discussed below.
1) Excess Flow Check Valve Display
2) Annunciator Alarm/Ambient Noise Contrast
3) Upgrade selected meter scales
4) Remove RHR Steam Condensing Mode Instrumentation in Control Room
5) Resolve 2 inch purge concern A detailed response to Detailed Control Room Design Review issues was supplied March 29, 1988 (G02-88-074).