Submits Revised Response to Util 881221 Ltr Responding to NRC 881123 Ltr Re Violations Noted in Insp Rept 50-397/88-24.New Date of Full Compliance Is 890217 for Implementing New Procedure on Control of Test Equipment
ML17285A228
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/30/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-89-010, GO2-89-10, NUDOCS 8902090205
Download: ML17285A228 (5)


Text

p,c CPM.'TED Dl ATTRIBt 'Tl ON DE)d 0% iTRXT1 04 SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8902090205 DOC.DATE: 89/01/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits revised response to NRC 881123 noted in Insp Rept 397/88-36.

ltr re violations DISTRIBUTION CODE: IEOID TITLE: General (50 COPIES RECEIVED:LTR Dkt)-Insp Rept/Notice of Violation Q ENCL ~ SIZE:

Response

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD SAMWORTH,R INTERNAL: ACRS AEOD 1 AEOD/DEIXB DEDRO 1 NRR SHANKMAN,S NRR/DEST DIR 1 NRR/DLPQ/PEB 11 NRR/DOEA DIR NRR/DREP/RPB 10 ll NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRXS DIR 9A 1

1 1

NRR/PMAS/ILRB12 NUDOCS-ABSTRACT 1 0 RMAN( J OGC/HDS2 1 REG FI 02 RGN5 FILE 01 1 XTERNAL: LPDR NRC PDR NSIC h

1KTE 'IO ALL "RZDS" RECIPIENIS:

PIZASE HELP US 1Q REDUCE WKTE! CONTACI'IHE DOCUMDG'XNH53L DESK, RGCN Pl-37 (EXT. 20079) TO ELQG2lATE 'COUR NAME FRCH DISTRIBUTION LZSTS FOR DOCUMEÃZS YOU DON'T NEED.'OTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 Georg~> tVashing(on t1'ay ~ richland, tS'ashhq~ton 99352 January 30, 1989 G02-89-010 Docket No. 50-397 U. S. Nuclear, Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO; 2 CHANGE TO DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION 88-24 D. AND CHANGE IN THE EXPECTED SUBMISSION DATE OF SUPPLEMENTAL LER 88"036-01 The Washington Public Power,. Supply System hereby revises our, reply to the Notice of Violation contained in your letter dated November 23, 1988. The Supply System's original response is contained in Supply System letter G02-88-274, dated December 21, 1988. Our, reply, pursuant to the pr ovisions of Section 2.201, Title 10, Code of Federal Regulations consists solely of this letter.

The Supply System response to Notice of Violation 88-24 "D" committed to com-plete all corrective actions by February 1, 1989. Due to the length of the procedure review process the new revision of Plant Procedure 1.5.4 "Control of Measuring and Test Equipment - Transfer, Standards" committed to in our response is now scheduled to be reviewed by the Plant Operating Committee (POC) on February 1, 1989. Following POC review and approval of the procedure, main-tenance shop meetings will be held to explain the new procedure. This training is scheduled to be completed by February 10, 1989 which is also the anticipated distribution date for the new procedure. As an interim measure the Plant Maintenance Manager will discuss the procedure revisions with his direct reporting staff on January 31, 1989. It is expected that all actions will be completed by February 10, 1989; however, the new date of full compliance is February 17, 1989. The additional seven days is to allow for an additional POC review if the procedure is not approved on February 1, 1989 or if some unanti-cipated problems arise which prevent the training or procedure distribution to be completed as scheduled.

Page Two CHANGE TO DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION 88-24 D-AND CHANGF IN THE EXPECTED SUBMISSION DATE OF SUPPLEMENTAL LER 88-036-01 Also, the expected submission date of Supplemental LER 88-036-01 has been revised from January 31, 1989 to March 3, 1989. The root cause analysis per-formed in support of this supplemental report took longer than expected. This is a courtesy notification.

Very truly yours,

. G.~ C.~ So ensen, Manager Regulatory Programs SLW/bk cc: JB Martin NRC RV NS Reynolds - BCP&R RB Samworth - NRC DL'illiams - BPA/399 NRC Site Inspector - 901A