Advises That Complete Response to Generic Ltr 88-14 Cannot Be Provided by 890223.Info That Will Be Submitted Listed. Addl Info on Design Verification Review Will Also Be Provided by 890414
ML17285A227
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/30/1989
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-88-14, GO2-89-011, GO2-89-11, NUDOCS 8902080479
Download: ML17285A227 (6)


Text

'CCELERATED DISIBUTION DEMOtSTR+IOA'Y)TEM h

REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)

ACCESSXON NBR:8902080479 DOC.DATE: 89/01/30 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

R

SUBJECT:

Advises that complete response re Gene ic Ltr 88-. 14,can be provided by 890223. I DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR TXTLE: OR Submittal: General Distribution g ENCL g SIZE: D NOTES:

RECXPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA PD5 PD SAMWORTH,R INTERNAL: ACRS 6 ARM/DAF/LFMB NRR/DEST/ADS 7E 1" NRR/DEST/CEB 8H NRR/DEST/ESB 8D 1 NRR/DEST/MTB 9H NRR/DEST/RSB 8E 1 NRR/DEST/S ICB NRR/DOEA/TSB 11 1 NUDOCS-ABSTRACT OGC/HDS2 1 R1~~IL 01 RES/DS IR/EXB 1 EXTERNAL: LPDR NRC PDR NSIC D

NOIR 'IO ALL "RIDS" RECIPIEHIS:

PLEASE HELP US TO REXKZ HASTE.'ONI'ACT "QK DOCUMENZ CORI'ROL DESK, ROON Pl-37 (EXT. 20079) TO EX3MZKTE YOUR MME FMH DISTRIBUTION LISTS FOR DOCUMENIS YOU DGNiT NEZDf c3 TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 January 30, 1989 G02-89-011 Docket No. 50-397 U. S. Nuclear, Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Hashington, D.C. 20555 Gentlemen:

Subject:

GENERIC LETTER 88-14, "INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY"RELATED E(}UIPMENT" The subject Generic Letter, requested that each licensee perform 'a design and operations verification of their, instrument air, system. A reply within 180 days was requested which for, HNP-2 would be February 23, 1989 based upon an August 23, 1988 receipt date.

Response to this request represents a significant commitment of resources by the Supply System including 1800 man hours of contractor, assistance. Also, it is expected that testing will be required that must wait for, our. 1989 spring refueling outage, currently scheduled for April 14 to June 6.

At this time we know that a complete response to the Generic Letter can not be provided by February 23, 1989. By this date we will provide the follow-ing:

1) A summary of the completed review of the manufacturer's recommenda-tions for, air, quality and a description of required tests to establish that the required air quality is provided. The tests will not have been performed by this date.
2) A summary of the completed verification of the review of maintenance practices and emergency procedures. He will not be reporting on the training review.

8902080479 890lsg03 oO PDR ADOCK 05000/97 P PDC I P

Page Two GENERIC LETTER 88"14 "INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY-RELATED E(}UIPMENT

3) A summary of the current status of the design verification review of the safety-related instrument air, systems.

By April 14, 1989 we will provide additional information on the design verifi-cation review. A final report, including outage test results, will be provided by July 7, 1989.

Yerg truly yours,

. C Sorensen, Manager Regulatory Programs AGH/bk cc: 'B Martin - NRC RV NS Reynolds BCPER RB Samworth - NRC DL llilliams BPA/399 NRC Site Inspector, - 901A N. LeFave - NRC

0 ,I

~~

~ '

STATE OF IIASHINGTON) subject: 6e rrrc !ctddr fg-/&

)

COUNTY OF BENTON )

I, L. J. Garvin, being duly sworn, subscribe to and say that I am the Manager, Programs 8 Audits for the WASHINGTON PUBLIC POINTER SUPPLY SYSTEM, the applicant herein; tnat I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

DATE o , 1989 L. Garvey n Manager Pro rams 8 Audits On this day personally appeared before me G. D. Bouchey to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this ~day +h of ~ 1989.

Notary Public sn nd or the ATF OF llASHINGTON Residing at

4 r'/

k ~

V I