Submits Status Rept on Remaining Three Tasks Identified in Fire Protection Program Reevaluation,Including Justifications for Deviation from Nfpa,Correct Thermo Lag Configurations & Updating FSAR
ML17284A492
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/23/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-88-183, NUDOCS 8809070317
Download: ML17284A492 (3)


Text

ACCELERA~ULAP@1%QXR@ D3%%tN+49UQP (RTDP~~M (I 'AC ESS ON NBR:8809070317 DOC.DATE: 88/08/23 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTINiJ.B. Region 5, Ofc of the Director

SUBJECT:

Provides current status rept on remaining three tasks identified in WNP-2 Fire Protection Program Reevaluation.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR l ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD SAMWORTHiR 2 INTERNAL: ACRS AEOD DEDRO NRR MORISSEAUiD NRR/DLPQ/PEB 11 NRR/DLPQ/QAB 10 NRR/DOEA DIR 11 NRR/DREP/EPB 10 NRR/DREP/RPB 10 NRR/DRIS DIR 9A NRR/PMAS/ILRB12 NUDOCS-ABSTRACT BERMANgJ OGC/HDS2 EG 02 RES/DSIR DEPY RGN5 FILE 01 EXTERNAL: LPDR NRC PDR NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL

ti WASHINGTON PUBLIC POWER SUPPLY SYQ'C P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Z6 ng: g~

G02-88-183 August 23, 1988 Docket No. 50-397 Mr . J. B. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21 FIRE PROTECTION REEVALUATION REPORT STATUS REPORT h

Reference:

Letter G02-88-006, G.C. Sorensen (SS) to J.B. Martin (NRC), same subject dated January 8, 1988 In the refer ence letter, the Supply System provided a status repor t on the scheduled completion dates for eight (8) tasks that had been identified as improvement initiatives in the MNP-2 Fire Protection Program Reevaluation Report. At that time, five (5) of those tasks had been completed and the remainder were on schedule. THe purpose of this letter is to provide a current status 'report on the remaining three (3) tasks, numbers 6, 7 and 8.

'Scheduled Completion Task Date Status

6) Document in a report 9/87 Report completed 11/87.

justifications for deviations Procedure revisions from NFPA codes completed 5/88. One new procedure remains to be completed, scheduled for 8/88.

880q0703l7 880Mg97 05000 PDR ADOCK PNU F

Page Two FIRE PROTECTION REEVALUATION REPORT STATUS REPORT

7) Correct Thermo Lag configurations 6/88 Rework of Thermo Lag if required based on the test deficiencies completed program. 5/88.
8) Complete update of the FSAR 9/88 Changes necessary to to clarify requirements basis comply with 10CFR50.71 (part of the routine 1988 FSAR will be included in update.) Amendment 39, scheduled for submittal 8/88. The remaining changes NRC approval of wil'wait Amendment 37.

Very truly y rs, G. C. rensen, Manager Regula ory Programs lw cc: JB Martin - NRC RV NS Reynolds - BCPSR RB Samworth NRC DL Williams - BPA - 399 NRC Site Inspector - 901A