Forwards Calculation Analyzing Structural Integrity of Specific Support Steel Configurations for Instrument Sensing Lines Re Fire Protection & Safe Shutdown Capability Response to SER
ML17284A438
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/15/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-155, TAC-63528, NUDOCS 8807270179
Download: ML17284A438 (2)


Text

AC CEIZRATED D3 BUTION DEMONSTR~ON SYSTEM REGULAT INFORMATION DISTRIBUTION~STEM (RIDS)

ACCESSION NBR:8807270179 DOC.DATE: 88/07/15 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project,,Unit 2, Washington Public Powe 05000397

, AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards suppl info on SER re fire protection & safe shutdown capability.

DISTRIBUTION CODE: A006D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR/Licensing Submittal: Fire Protection NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTHiR 1 1

'INTERNAL: ACRS 3 3 ARM/DAF/LFMB 1 0 NRR WERMEILIJ 1 0 NRR/DEST/ADS 7E 1 1 NRR/DEST/PSB 8D 1 1 NU OCS-ABSTRACT 1 1 OGC 15-B-18 1 0 EG FI 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 8

I h

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 16

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 U. S. Nuclear Regulatory Commission G02-88-155 Attn: Document Control Desk July~.,L5>':1988 Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 FIRE PROTECTION AND SAFE SHUTDOWN CAPABILITY RESPONSE TO SAFETY EVALUATION REPORT, SUPPLEMENTAL INFORMATION

Reference:

1) Letter G02-88-090, GC Sorensen (SS) to NRC, same subject, dated April 15, 1988
2) Letter G02-88-136, GC Sorensen (SS) to NRC, same subject, dated June 3, 1988 Refer ence 1 provided additional information on eight questions remaining from the staff's Safety Evaluation Report addressing fire protection and safe shutdown capability at WNP-2. The response to question 4 required submittal of a calculation analyzing the structural integrity of specific support steel configurations for instrument sensing lines. Originally, the calculation was scheduled to be submitted by May 15, 1988, however, as related in reference 2, this schedule was deferred due to high priority outage rel ated work until af ter July 15, 1988. Accordingly, the calculation (attached) has been completed and is submitted to satisfy the above commitment. As noted in the calculation, protection of the hangers or modification of tube clamp bolting is required to ensure that associated instrument lines do not fail due to support collapse during a design basis fire. In the interim, until these modifications are completed, those areas containing the specific support steel configuration remain on a fire watch in accordance with the WNP-2 Technical Specifications.

Should you have fur ther questions regarding this submittel, please contact Mr. A. G. Hosier, Manager, WNP-2 Licensing.

Very truly yours, G. C. Sorensen, Manager cc: J. B. Martin - NRC - RV Regulatory Programs N. S. Reynolds - BCP8R R. B. Samworth - NRC bn D. L. Williams BPA/399 NRC Site Inspector - 901A Attachment ye4 8807270179 880715 PDR ADOCK D>0O0~9?

F PNU~