ML17284A414

From kanterella
Jump to navigation Jump to search
Advises of Listed Personnel Changes.Stated Changes Will Be Included in Future FSAR Amend
ML17284A414
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/28/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Knighton G
Office of Nuclear Reactor Regulation
References
GO2-88-143, NUDOCS 8807080291
Download: ML17284A414 (4)


Text

AC CELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8807080291 DOC.DATE: 88/06/28 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION KNIGHTON,G.W. Project Directorate V

SUBJECT:

Advises of listed personnel changes.

R DISTRIBUTION CODE: M006D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Changes of Personnel/Address I NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR EN CL ID CODE/NAME LTTR E CL PD5 LA 1 PD5,PD 1 SAMWORTH,R 1 INTERNAL: ACRS ARM STANSBURY,R 1 Il 'A ARM TECH ADV ARM/DAF/LFMB 1 ASLAP ASLBP 1 D N,QCS STRACT OGC 15-B-18 1 EG F 01 SECY/DSB 1 D

EXTERNAL: LPDR NRC PDR gi D

8 A

9 TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL

I m 'tl

~lf I

l)f I

I) l~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 June 28, 1988 G02-88-143 DOCKET No. 50-397 Mr. G. W. Knighton, Director Project Directorate V Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr . Knighton:

Sub'ject: PERSONNEL CHANGES The purpose of this letter is to advise you of personnel changes which have recently been made by the Supply System.

o Effective June 10, Mr. Sam McKay has been appointed as the Operations Manager reporting to the WNP-2 Plant Manager.

o Effective June 10, Mr. Bill Shaeffer has been appointed as the Assistant Operations Manager.

o Mr . Roger Corcoran, former Operations Manager, has been assigned a position on the Plant Manager's staff, responsible for the development and progress of new operator trai ni ng ini tiatives.

o Effective June 20, Mr. Alan G. Hosier is assigned as the WNP-2 Licensing Manager.

o Mr. Pat L. Powell, former Licensing Manager, will continue as part of the WNP-2 Licensing organization.

o Effective June 10, Mr. Jerry D. Harmon is assigned as the WNP-2 Plant Maintenance Manager.

The qualifications of Messrs. McKay, Shaeffer, and Harmon are included in the WNP-2 FSAR, Appendix 13. 1B. By virtue of their education, training and experience, these individuals meet the requirements for their respective positions. The changes noted above will be included in a future FSAR amendment.

~oo 5

$ $ 070$ 029i 88062$ /o Pl3R ADOCK 05000397 H PDC

Mr. G. H Knighton June 28, 1988 Page Two Should you have any questions regarding these changes please contact Mr.

Hosier at (509) 377-2327.

Very truly yours, G. C.,S rensen, Manager Regulatory Programs sek cc: J. B. Martin, NRC, Region V C. Bosted, Resident Inspector, 901A N. S. Reynolds, Bishop, Cook, Purcell & Reynolds RE B. Samworth, NRC D. L. Williams, BPA, 399