ML17279A966

From kanterella
Jump to navigation Jump to search
Requests That Rev Date of 861112 Noted in Table 1 of Draft Generic Ltr Re Inservice Testing Program Be Changed to 871012 to Reflect Rev Date of Current Submittal Now Implemented at Facility,Per 880314 Telcon
ML17279A966
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/06/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-083, GO2-88-83, NUDOCS 8804140010
Download: ML17279A966 (5)


Text

ACCT,'IZRATED DIFZRIBUTION DEMONS ATION SYSTEM REGU ORY INFORMATION DISTRIBU SYSTEM (RIDS)

ACCESSION NBR: 8804140010 DOC. DATE: 88/04/06 NOTARIZED: NO DOCKET 0 O'CIL: 50-397 WPPSS Nuclear Pro JectI Unit 2I Washington Public Poee 05000397 AUTH. NAME AUTHOR AFF ILIAT ION

.SORENSEN4 G. CWashington Pub lic Power Supply System RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Requests rev date of inservice testing program discussed in draft generic ltr received on 880314 be revised to '871012.

R DISTRIBUTION CODE: A047D COPIES RECEIVED: LTR i ENCL SIZE:

TITLE: OR Submittal: Inservice Inspection/Testing/Relief. from ASME Code I NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTHI R 1 1 A

INTERNAL: ACRS 10 10 AEOD/DOA 1 1.

AEOD/DSP/TPAB 1 1 ARM/DAF/LFMB 1 0 D NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 S/ILRB12 1 1 OGC 15-9-18 1 0 RE LE 01 1 1 RES/DE/EIB 1 1 EXTERNAL: EGS.G ROCKHOLDI H 1 1 LPDR NL 007 HEMMING 1 1 NRC PDR NSIC 1 1 R

I TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 28

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 April 6, 1988 G02-88-083 Docket No. 50-397 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 INSERVICE TESTING FOR PUMPS AND VALVES

Reference:

1) Letter, GC Sorensen (SS) to EG Adensam (NRC), dated 12-26-85, Submittal of Revision 3a of the Plan and Request for Interim Approval of Same
2) Letter, GC Sorensen (SS) to EG Adensam (NRC),

G02-86-211, dated 3-12-86, Request for Interim Approval of Revision 3a of the Plan

3) Letter, GC Sorensen (SS) to EG Adensam (NRC),

G02-86-1022, dated 11-12-86, Request for Interim Approval of Revision 3a of the Plan

4) Letter, GC Sorensen (SS) to NRC, G02-87-262, dated 10-12-87, Submittal of Revision 3b of the Plan and Request for Interim Approval of Same As related in a telephone conversation March 14, 1988 between Nessr s P. L. Powell, T. F. Hoyle (SS) and R. 8. Samwor th of your staff, the Supply System received a dr aft copy of an NRC Generic Letter regarding inservice testing of pumps and valves. Table 1 of this draft Generic Letter identifies the revision date of the Inservice Testing ( IST)

Program applicable to WNP-2 as ll/12/86. The purpose of this letter is to request that this date be changed to reflect the revision date of the current submittal now implemented at WNP-2, submitted October 12, 1987, (Reference 4).

880406 8804140010 '05000397 PDR ADOCK p DCD

'r IJ rw I

Page Two Inservice Testing for Pumps and Valves Back round Revision 3a'f the IST Plan was submitted to the Commission and interim approval requested on 12/26/85 (Reference 1). Interim approval to implement Rev. 3a was again requested on 3/12/86 (Reference 2) and 11/12/86 (Reference 3). The Generic Letter, references this latter date, 11/12/86, which corresponds to Rev. 3a.

Subsequently, the WNP-2 IST Program has been revised (that is Rev.

3b), submitted to the Commission, and interim approval requested on 10/12/87 (Reference 4).

Revision 3b of the IST Plan is significantly different from Revision 3a in certain areas due to recent design changes to the plant and unforeseen problems encountered during the testing of certain valves.

Should you have any questions concerning this matter, please contact Mr. P. L. Powell, Manager, WNP-2 Licensing.

Very truly ours, G. C. Sorensen, Manager Regulatory Programs RPW:lw cc: JB Martin - NRC RV NS Reynolds - BCP8R RB Samworth - NRC DL Williams - BPA/399 NRC Site Inspector - 901A