Requests Extension of Response Time to 880120 for Violations Noted in Insp Rept 50-397/86-12,per 880115 Telcon
ML17279A782
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/15/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-88-019, GO2-88-19, NUDOCS 8801270116
Download: ML17279A782 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8801270116 DOC. DATE: 88/01/15 NOTARIZED: NO DOCKET FACIL: 50-397 WPPSS Nuclear Pro JectI Unit 2I Washington Public Poee 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSENI G. C. Washington Public Poujer Supply System RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Requests extention of response time to 880120 for violations noted in Insp Rept 50-397/86-12I per 880115 telcon.

DISTR ISUTION CODE:

TITLE: General IEOID COPIES RECEIVED: LTR (50 Dkt)-Insp Rept/Notice of J ENCL Violation Q SIIE:

Response

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD SAMWORTHI R '1 INTERNAL: ACRS AEOD DEDRO NRR MORISSEAUi D NRR/DLPG/PEB NRR/DOEA DIR NRR/DREP/EPB NRR/DREP/RPB NRR/DRIS DIR NRR/PMAS/ILRB OE L HER@AN J OGC/HDS2 LP RES/DRPS DIR N5 FILE 01 TERNAL: LPDR NRC PDR NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL

Washington Public Power Supply System 30006eorge Washington Way P.O. Box968 Richland, Washington 99352-0968 (509)372-5000 January 15, 1988 Docket No. 50-397 G02-88-019 U. S. Nuclear Regulatory Commission Attn: Document Control Desk washington, D.C. 20555 Gentlemen:

A

Subject:

NUCLEAR PLANT NO. 2, LICENSE NPF-21 NRC INSPECTION REPORT 86-12, REQUEST FOR EXTENSION OF RESPONSE TIME Reference; Letter, RJ Pate (NRC RV) to GC Sorensen (SS)

"NRC Enforcement Actions Related to Inspection No. 50-397/86-12", dated December 16, 1987 Appendix A of the referenced letter described three activities, identified during an NRC team inspection April 28 through May 2, 1986, considered to be violations. It further requested a response within 30 days of the date of the notice, December 16, 1987.

Due to the Holiday season and other apparent difficulties the reference and notice of violation were not received by the Supply System until December 29, 1987 leaving a review and response time far shorter than normally pro-vided. Supply System personnel have attempted to meet the shortened schedule but feel that in order to ensure an accurate, quality response a minimal extension to the response time is needed. Accordingly, the Supply System hereby requests an extension to the required response time to January 20, 1988.

This request was informally discussed in a telephone conversation, January 15, 1988, between Messrs R. J. Pate of your staff and P. L. Powell and J. D.

Arbuckle of the Supply System. Should you have any questions, please contact Mr. P. L. Powell, Manager, NNP-2 Licensing.

Very truly yo r s, G. C. $ rensen, Manager Regulatory Programs PLP/bk cc: JB Martin NRC RY NS Reynolds - BCP8R RB Samworth NRC DL Williams BPA/399 NRC Site Inspector - 901A 880127011b 880115~i PDR ADOCN. 0500039'7 8 PDR: