Advises That Util Satisfied Requirement of 10CFR50.56 by Designing TIP-V-15 to Be Installed Approx 3 Ft Outside Containment Penetration,Per 870401 Telcon.Installation Expected to Allow Sufficient Access for Testing & Maint
ML17279A214
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/15/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GO2-87-135, TAC-63935, NUDOCS 8704220028
Download: ML17279A214 (5)


Text

V REQUL INFORMATION DISTRIBUTI iTEN (R IDS>

ACCESSION NBR: 8704220028 DOC. DATE.: 87/04/15 NOTARIZED: NO DOCKET ¹ FACIL: 50-397 WPPSS NucleaY Progecti Unit 2i Washington Public Powe 05000397 AUTH. NANE AUTHOR AFFILIATION SORENSEN> Q. C. Washington Public Power Supply System:.

REC IP. NANE RECIPlENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that util satisfied requirement of 10CFR50. 56 bg designing TIP-V-15 to be installed approx three feet outside containment penetration> per 870401 tele on. Installat ion expected to allow sufficient access for testing 5 maint.

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES REC lP I ENT COPIES ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PD5 LA 0 PD5 PD 5 5 SANWORTHz R INTERNAL: ACRS 6 6 ARl1/A8(F/LFNB 1 NRR/DEST/ADE 1 NRR/DEST/ADS NRR/DOEA/TSB 1 1 /ILRB 1 OGC/HDS2 0 R 01; 1 EXTERNAL: EQ8 8 1 LPDR NRC PDR 1

1 'SIC TOTAL NUJ')BER OF COPIES REQUIRED: LTTR 24 ENCL 21

yO Oo l I 4 l'

'sl

'1 II

  • I

Washington Public Power Supply System 30006eorgeWashingtonWay P.O. Box968 Richiand, Washington99352-0968 (509)372-5000 8704>2002P8 870415 OO397 pDR pD{3CK pD April 15, 1987 P G02-87-135 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk

>lashington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21, CL'ARIFICATION OF REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS - PRIMARY CONTAINMENT ISOLATION VALVE TABLE 3.6.3-1

References:

1} Letter, G02-87-064, G. C. Sorensen (SS) to NRC, Same Subject, dated February 25, 1987

2) Letter, G02-87-003, G. C. Sorensen (SS) to E. G.

Adensam (NRC}, Same Subject, dated January 7, 1987

3) Letter, G02-86-1028, G. C. Sorensen (SS) to E. G.

Adensam (NRC), Same Subject, dated November 18, 1986 Reference 3 requested a change to the HNP-2 Technical Specifications to reflect modifications to the Traversing Incore Probe (TIP) purge line currently scheduled for completion during the forthcoming Spring 1987 refueling outage. References 1 and 2 provided additional clarification and supplemental information, respectively.

In a recent telephone conversation (April 1, 1987) with the Staff, the Supply System was requested to provide still further clarification.

Specifically, we were asked to clarify how we satisfied the following requirement of 10 CFR Part 50, Appendix A, Criterion 56:

"Isolation valves outside containment shall be located as close to the containment as practical

Page Two April 15, 1987 CLARIFICATION OF REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS PRIMARY CONTAINMENT ISOLATION VALVE - TABLE 3.6.3-1 The Supply System has satisfied this requirement by designing TIP-V-15 to be installed approximately three feet outside the containment penetration. This is expected to allow sufficient access for testing and maintenance, while still being located as close as practical to the containment. TIP-V-6, located inside containment, will also be installed approximately three feet from the containment penetration.

Should you have any further questions regarding this matter, please contact Mr. P. L. Powell, Manager, llNP-2 Licensing.

Very truly yours, G. C. orensen, Manager Regulatory Programs HLA/tmh cc: JO Bradfute - NRC C Eschels - EFSEC JB Martin - NRC'RV CE Revell - BPA NS Reynolds - BLCPSR NRC Site Inspector