ML17276B626

From kanterella
Jump to navigation Jump to search
Requests Revision to Suppl 2 of SER,NUREG-0892,Sections 4.2.3.2(7),4.2.3.3(1) & 4.2.3.3(3) to Indicate Resolution of Cladding Rupture Concern & to Reflect That PCT Margin Is Not Required
ML17276B626
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0892, RTR-NUREG-892 GO2-82-818, NUDOCS 8210050126
Download: ML17276B626 (4)


Text

t REGULATORY FORMATION DISTRIBUTION SY M (RIDS)

ACCESSION NBR:8?10050126 DOC ~ DATE: 82/09/30 NOTARIZED: NO DOCKET FACIL:50 397 NPPSS Nuclear BYNAME Projects Unit 2E i']ashington Public Powe 05000397 AUTH AUTHOR AFFILIATION BOUCHEYEG,DE Nashington Public Power Supply System RECIPRNAME 'ECIPIENT AFFILIATION SCHWA'ENCEREA ~ Licensing Branch 2

SUBJECT:

Requests reyision to Suppl 2 of SERENUREG"0892ESections 0 ~ 2 ' '(7)r4.2 '.3(1) & 0 ~ 2 ' '(3) to indicate resolution of cladding rupture concern 8 to reflect that PCT margin is not required.

DISTRIBUTION CODE: BOOIS TITLE: Licensing COPIES RECEIVED:LTR Submittal: PSAR/FSAR Amdts &

~ ENCL SIZE:

Related Correspondence

/

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAMIE

'D CODE/NAME LTTR ENCL LTTR ENCL NRR/DL/ADL ,1 0 NRR LB2 BC 1 0 NRR LB2 LA 1 0 AULUCKER ~ 01 1 1 INTERNAL: ELD/HOS2 1 0 IE FILE 1 1 IE/OEP EPDS" 35 1 1 IE/DEP/EPLB 36 3 3 NRR/DE/AEAB 1 0 NRR/DF/CEB 11 1 NRR/DE/EQB 13 3 3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 2 NRR/DE/MEB 18 1

'1' NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 NRR/DE/SAB NRR/DHFS/HFEBil0 24 1 1 1

NRR/DE/SEB NRR/OHFS/LQB 32 25 1

' 1 NRR/DHFS/OLB 3Q 1 1 NRR/DHFS/PTRB20 1 1 NRR/DS I /AEB 26 1 1 NRR/DSI/ASB 27 1 1 NRR/DSI/CP8 10 1 1 NRR/OS I/CS8 09 1 1 NRR/DSI/ETS8 12 1 NRR/DSI/ICSB 16 1 NRR/DSI/PSB 19 1 NRR/DS I/RAB 22, 1 SB 23 1 1 NRR/OST/LGB 33 1 1 REG FILE 00 1 1 RGN5 2

/MIB 1 0 EXTERNALS ACRS 41 6 6 BNL(AMOTS ONLY)

DMU/DSS (AMDTS) 1 FEMA REP DIV 39 LPDR 03 1 1 NRC PDR 02 NSIC 05 1 1 NTIS TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 49

~r '

i" vxJ,.< <<f ~ 1 t "t)).,

l I s'rhr s0r's~ 1 it l v V V1'sr 1 hrt f st,h,vh v q Vq t f' 1 IrSV V h

ff '-'

lz l

,hIV V h,.i, f Vrv 7i tv". f l, I Cs Ih'vh!I

~ t rl p

r srrttlI t l I s I II q

'hl 'h II v llhlI,r I~ Ir~ si, tv tMrIh ~

f 1 II>: V

'V 9 << l t1, r) f'I,rhv f "II t (rrh il C I ll o 1 I 4 i 1v l '1

~ I vA "1 t 1tl "'1'v

'Ilail'lrhIv

')>>'v )vils II'll 1'> ) ch't >'v 'Ist fhlhhf<<"' hi $ v '%van' li,, rrt si 't f 1 v}f

~ <'>II 1 Ef I>

,:fi l hV

<<X 0 'I1F 1 i tf wJ

'Is Il Jsl tg (I vt vh ,vr il hh rr sr IL v C, v,k

<<rII V i sh I'>> sr V Il I

r' h

1 I

,,' 'g'I II g1 svv

, ghI>lhg>v4 v

$I l 1 ) '

I

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 September 30, 1982 G02-82-818 SS-L-02-PLP-82-066 Docket No. 50-397

-Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO. 2 PERFORMANCE BRANCH CONCERN:

'ORE CLADDING RUPTURE

Reference:

a) Letter G02-82-84, G.D. Bouchey (SS) to A. Schwencer (NRC), "Core Performance Branch Concerns, Related During Phone Call January 6, 1982", dated January 19, 1982 b) NRC Letter, R.L. Tedesco (NRC) to G.G. Sherwood (GE),

"Acceptance for Referencing of Topical Report NEDE-20566-4, Rev. 4", dated February 4, 1981 c) NRC Letter, H. Bernard (NRC) to G.G. Sherwood (GE),

"Supplementary Acceptance of Licensing Topical Report NEDE-20566A (P)", dated May ll, 1982 Reference (a) relinquished credit for the WNP-2 PCT Margin (2200 F - 1960 F) until NRC review of the General Electric generic document NEDO-20566 was complete. References (b) and (c) document the completion of that review.

With NRC approval of the .revised~ rupture cladding model a plant specific, Appendix K, 10 CFR 50, analysis for WNP-2 was completed.

With completion of this review it is requested that Supplement No. 2 to the WNP-2 SER, NUREG-0892, Section 4.2.3.2(7), 4.2.3.3(l), and 4.2.3.3(3), be revised to indicate that the cladding rupture concern discussed has been resolved and the PCT margin is not required to account for cladding rupture.

Section 6.3 of the WNP-2 FSAR will be revised to reflect the WNP-2 plant specific analysis. Should you have further questions, please contact Mr. R. M. Nelson, Manager, WNP-2 Project Licensing Very truly yours, G. D. Bouchey Manager, Nuclear Safety and Licensing PLP/jca cc: R Auluck - NRC WS Chin - BPA R Feil - NRC Site 8210050i26 820930 PDR ADOCK 05000397 E PDR

~ ~ 4 4