ML17276B096

From kanterella
Jump to navigation Jump to search
Forwards Safety-Related Mechanical Equipment List:Seismic Qualification Info, in Response to 820208 Telcon W/Nrc
ML17276B096
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/12/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17276B097 List:
References
GO2-82-169, NUDOCS 8202260213
Download: ML17276B096 (6)


Text

REGULATORY I>RNAT ION DISTRIBUTION SYST. (RIBS)

ACCESSION NBR:8202260213 DOC, DATE: 82/02/12. NOTARIZED: NO FACIL:50"397 BYNAME NPPSS Nuclear ProjectE Unit 2r washington Public Powe 05000397 AUTH AUTHOR AFFILIATION.

BOUCHEYPG.DE l<ashingten Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCHhENCEREA ~ Licensing Branch 2

SUBJECT:

matl:-PM'OCKET Forwards "Safety-Related Mechanical Equipment List:Seismic Qualification InfoE," in response to 820208 DISTRIBUTION CODE: BOOIS COPIES RECEIVED:,LTR L,'.ENCL,W SIZE:,

telcon w/NRC ~

TITLE: PSAR/FSAR AMDTS and Related. Correspondence NOTES:2 copies all 05000397 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: A/D LICENSNG 1 0 LIC 'BR 42 BC 1 0 LIC BR N2 LA 1 0 AULUCKER ~ 01 1 1 INTERNAL: ELD 1 0 IE 06 3 3 IE/DEP/EPDB 35 1 1 IE/DEP/EPLB 36 3 3 MPA 1 -0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 "3 NRR/DE/GB 28 '2 2 NRR/DE/HGEB =30 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DSI/AEB ?6 1 1 NRR/DS I/ASB 27 1 1

~

NRR/DSI/CP8 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DS I/ETSB 1? 1 1 NRR/DSI/ICSB 16 1 1 NRR/DSI/PSB 19 1 1 NRR/DS I/RAB "22 1 1 NRR/ RSB 23 1 NRR/DST/LGB 33 1 1 04 1 1 EXTERNAL: ACRS 41 16 16 BNL(AMDTS ONLY)

FEMA REP DIV 39 1 1 LPDR 03 NRC PDR 02 1 1 NSIC 05 NTIS 1 1 4,5 TOTAL NUMBER OF COPIES REQUIRED: LTTR 5 ENCL 8

It d It jj,v I

' 1 34 14 44 jj ~ ~

III I I'j

~

I 4I, g jI Q 4 I I"

f g I

I II I I

II N

4 I

g 4

y

'44'4

,4

  • X 4

I 4

4 II .'i ~ l h

I

g2P22602

  • PDR y Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99362 (609) 372-6000 February 12, 1982 G02-82-169 Docket No. 50-397 s,

Mr. A. Schwencer, Chief e~Z~

Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission q

+ -e i Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO. 2 ADDITIONAL INFORMATION fOR SEISMIC QUALIFICATION OF SAFETY RELATED WNP-2 E(UIPMENT

Reference:

a) Telephone Conversation between Dr. T.Y. Chang (NRC), J.N. Singh (EGtmG), J.E. Rhoads (SS),

R.W. Hickman (SS), and J.C. Sullivan (SS),

dated February 8, 1982 b) Letter, G02-81-0315, G.D. Bouchey (SS) to A. Schwencer (NRC), "Seismic and Hydrodynamic gualification Status", dated September 25, 1981 Reference (b) is the Supply Systems's submittal of information for the S(RT review.

During the conversation (reference (a)) Dr. Chang noted these three (3) areas of concern:

1. The answer to question 271.01 included interim criteria for eval-uating pipe mounted equipment. Dr. Chang requested a schedule for the verification that the interim criteria is indeed conser-vative.

Answer: The final piping analysis of the first system will be ava~aable in June, 1982. The review of the analysis to show that the actual accelerations are less than those shown in the interim criteria will begin in July, 1982. The availability of final analyses on subsequent systems and their review will be on a con-tinuing basis, and will be completed before fuel load.

~ p+ a' .r l

II h gP 1

1 p / ja e .~ '~

V 1

V "I

Hr. A. Schwencer Page Two February 12, 1982 G02 169

2. Dr. Chang requested that the safety-related mechanical equipment list include passive equipment such as tanks, filters, etc.

Answer: Attachment I to this letter is an updated safety-related mechanical equipment list for WNP-2. It includes all updates to the list made since September 25, 1981, and includes all level 1 and 2 equipment, except passive valves. The equipment is listed with the active components preceeding the passive components.

Otherwise, the list is by part number.

3. Dr. Chang questioned whether a component with multi-modal response could be qualified by using single frequency testing.

Answer: The criteria for accepting single frequency testing for qual>fication of multi-frequency equipment is Attachment 5.5 to Engineering Departmental Instruction 4.8, which is enclosed as Attachment 2. You will find that these are rigorous requirements for qualification by the use of single frequency tests.

Very truly yours, G. D. Bouchey Deputy Director, Safety'nd Security RWH/jca Attachments cc: R Auluck- NRC TY Chang NRC WS Chin BPA R Feil NRC Site JN Singh EG8IG