|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9681999-10-19019 October 1999 Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML20206U4501999-05-19019 May 1999 Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule ML20196K6961999-03-30030 March 1999 Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML20204F0261999-03-19019 March 1999 Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17284A8981999-10-14014 October 1999 Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 ML17284A9061999-09-24024 September 1999 Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills ML17292B7591999-09-24024 September 1999 Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl ML17284A8881999-09-24024 September 1999 Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 ML17292B7581999-09-22022 September 1999 Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 ML17284A8811999-09-0909 September 1999 Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)1999-09-0808 September 1999 Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) ML17284A8751999-08-30030 August 1999 Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 ML17284A8721999-08-30030 August 1999 Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld ML17284A8711999-08-30030 August 1999 Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 ML17292B7531999-08-24024 August 1999 Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 ML17292B7511999-08-24024 August 1999 Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) ML17284A8701999-08-19019 August 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls ML17292B7501999-08-19019 August 1999 Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage ML17284A8681999-08-12012 August 1999 Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety ML17284A8541999-08-0202 August 1999 Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld ML17284A8531999-07-30030 July 1999 Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 ML17284A8301999-07-22022 July 1999 Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl ML17292B7451999-07-20020 July 1999 Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties ML17292B7391999-07-16016 July 1999 Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 ML17292B7381999-07-12012 July 1999 Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls ML17292B7171999-07-0606 July 1999 Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready ML17292B7181999-07-0202 July 1999 Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO ML17292B7161999-06-30030 June 1999 Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. ML17292B7131999-06-29029 June 1999 Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. ML17292B7091999-06-21021 June 1999 Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 ML17292B7041999-06-17017 June 1999 Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls ML17292B7031999-06-10010 June 1999 Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl ML17292B6841999-06-0404 June 1999 Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs ML17292B6851999-06-0101 June 1999 Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities ML17292B6751999-05-25025 May 1999 Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 ML17292B6831999-05-25025 May 1999 Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date ML17292B6661999-05-0707 May 1999 Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility ML17292B6531999-05-0303 May 1999 Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 ML17292B6561999-04-29029 April 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam ML17292B6421999-04-19019 April 1999 Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.7901999-04-19019 April 1999 Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 ML17292B6401999-04-13013 April 1999 Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests ML17292B6371999-04-12012 April 1999 Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS ML17292B6281999-04-0606 April 1999 Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)1999-03-26026 March 1999 Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) ML17292B6131999-03-24024 March 1999 Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication ML17292B5991999-03-16016 March 1999 Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) ML17292B5911999-03-16016 March 1999 Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question ML17292B5941999-03-16016 March 1999 Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls ML17292B6001999-03-16016 March 1999 Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement ML17292B5901999-03-11011 March 1999 Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted ML17292B5681999-03-0101 March 1999 Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 ML17292B5651999-02-22022 February 1999 Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint ML17292B5581999-02-0404 February 1999 Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17286A2801990-08-27027 August 1990 Forwards fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d) ML17286A2671990-08-23023 August 1990 Provides Info on Steps Taken to Minimize Potential Effects of NRC Maint Insp Interface Record, Form on Candor of Supply Sys Personnel When Talking W/Nrc Inspectors ML17286A2641990-08-20020 August 1990 Advises That Tech Spec Rev Re ATWS Recirculation Pump Trip Will Be Submitted by 900928,per Discussions W/ P Eng & H Lee ML17285B4341990-08-20020 August 1990 Withdraws 900302 Request for Amend to Tech Spec 3.8.1.1, AC Sources Reducing Excessive Testing of Diesel Generators. IR 05000397/19900141990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4171990-08-10010 August 1990 Provides Info Re Final Assessment of Causes & Corrective Actions Associated W/Recent 25 Kv iso-phase Bus Electrical Fault Incident,Per Request in Cover Ltr to Insp Rept 50-397/90-14.Plant Procedure 10.25.141 Will Be Revised ML17285B4041990-08-0202 August 1990 Submits Justification for Continued Operation W/Emergency Diesel Generator 2 Shorted Turns ML17285B3981990-07-30030 July 1990 Advises That Installation of Detector Check Valve in Fire Protection Underground Piping Sys Complete,Per 890911 Ltr. Sys Monitors for Underground Sys Leakage Over Entire Fire Protection Sys ML17285B3991990-07-27027 July 1990 Forwards Justification for Continued Operation Re Emergency Diesel Generator 2 Shorted Turns.Justification Concludes That Diesel Generator Capable of Supporting Present Operability Requirements of Tech Specs ML17285B3711990-07-12012 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Confirms That Items 1,2,3,4 & 5 of Requested Actions of Operating Reactors Completed ML17285B3761990-07-12012 July 1990 Discusses Potential for Surface Entry & Mining Near Plant Sites.Concludes That NRC Need Not Consider Issue as One Requiring Continued Monitoring ML17285B3781990-07-11011 July 1990 Requests Waiver of Compliance from Tech Spec 3.8.1.2 Re Ac Sources - Shutdown.Waiver Will Allow Performance of Rotor Pole Ac Voltage Drop Test to Provide Confirmation That for Extended Run Degradation Condition Will Not Occur ML17285B3841990-07-10010 July 1990 Forwards Util 1990 Emergency Exercise Scenario.W/O Encl ML17285B3661990-07-0505 July 1990 Advises of Listed Organizational & Personnel Changes, Effective 900707.J Burn Will Be New Director of Projects, C Powers Promoted to Director of Engineering & J Baker Promoted to Plant Manager ML17285B3641990-06-29029 June 1990 Advises That All Equipment Identified W/Atws Safety Function Acceptable from Environ Qualification Standpoint. ATWS Equipment Has Been Determined to Be Qualified to Normal Design Environ Conditions Followed by ATWS Accident Environ ML17285B3571990-06-28028 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. ML20055D2391990-06-28028 June 1990 Forwards Response to Re Violations Noted in Insp Rept 50-397/90-12.Response Withheld (Ref 10CFR73.21) ML17285B3501990-06-22022 June 1990 Advises That Mods to Recirculation Pump Trip Sys Implemented During 1990 Spring Refueling Outage.Remaining ATWS Items to Be Resolved as Listed ML17285B3511990-06-20020 June 1990 Forwards WPPSS-FTS-129, BWR Transient Analysis Model, for Review & Approval ML17285B3441990-06-20020 June 1990 Advises That Util Intends to Utilize R-value of 0.13% Delta K/K in Cycle 6 Implementing Procedures.Should R-value Change in Final Startup & Operations Rept,Changed Value Shall Be Used Instead ML17285B3451990-06-19019 June 1990 Forwards Rev 10 to EPIP 13.1.1, Classifying Emergency. Rev Includes New Format of Matrix Charts Intended to Improve Identification of Symptomatic & situation-based Emergency Conditions ML17285B3431990-06-18018 June 1990 Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601 ML17285B3461990-06-15015 June 1990 Responds to NRC Evaluation Findings of Licensed Operator Requalification Program.Quality of Written Exam & Job Performance Measure Question Bank Testing Matls Will Be Improved to Meet Std Prior to Next Program Evaluation Cycle ML17285B3301990-06-12012 June 1990 Forwards Warrant for $50,000 in Response to Order Imposing Civil Monetary Penalty Dtd 900521 ML17285B3251990-06-0707 June 1990 Advises That Calculated Max Control Room Temp Re Station Blackout Will Be Provided by 900701 ML17285B2931990-05-29029 May 1990 Responds to NRC 900426 Ltr Re Violations Noted in Insp Rept 50-397/90-09.Validity of Violation Challenged.Opposes Issuance of Severity Level IV Violation Based on Listed Reasons ML17285B2861990-05-22022 May 1990 Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991 ML17285B2881990-05-11011 May 1990 Forwards Engineering Std EES-4,Rev 0, Setpoint Methodology, as Committed in Util 900329 Ltr.W/O Encl ML17285B2471990-05-0101 May 1990 Advises That No Changes to Tech Specs Required as Stated in 891130 Ltr in Response to Generic Ltr 89-21 Requesting Plant Status on Implementation of USI Re ATWS ML17285B2741990-04-26026 April 1990 Advises That Util Has No Comments on Licensed Operator Annual Requalification Exam During Wks of 900226 & 0305.All Comments Resolved When Exams Administered ML17285B2321990-04-25025 April 1990 Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17 ML17285B2121990-04-19019 April 1990 Responds to Fire Protection Issues Identified in 900201 Notice of Violation.Corrective Actions:Major Hardware Changes Implemented & Independent Consultant Will Be Employed to Review Fire Protection Program ML17285B2221990-04-16016 April 1990 Forwards Status Rept for Commitments Made in 891130 Ltr Re commercial-grade Dedication Process.Resolution of 10 Samples Identified by NRC & 50 Samples Identified by Cynga Completed ML17285B1881990-04-11011 April 1990 Responds to NRC 900312 Ltr Re Violations Noted in Insp Rept 50-397/90-01.Corrective Actions:Complete Job & Task Analysis Completed for Health Physics Technician Training Program & New Program Will Include Training on Fundamentals ML17285B1821990-04-0505 April 1990 Requests Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii) & (IV) to Allow Delayed Submittal of NRC Form-474, Simulation Facility Certification & to Administer Simulation Test as Upgraded,Respectively ML17285B1741990-04-0505 April 1990 Advises That NRC Approved Use of Final Feedwater Temp Reduction in Amend 77 to License NPF-21 ML20012F6141990-04-0404 April 1990 Forwards Rev 17 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML17285B2041990-03-29029 March 1990 Requests Review of Encl Topical Rept WPPSS-FTS-127,Rev 0, Qualification of Core Physics Methods for BWR Design & Analysis. Upon Rept Approval,Tech Spec Changes (Per Generic Ltr 88-16) Scheduled for Jan 1992 ML17285B1421990-03-29029 March 1990 Forwards Revised Schedule for Plant Equipment Setpoint Methodology Program Plan.Methodology Revised to Incorporate Latest ISA Std Draft.Setpoint Program Design Team for FY90 Onsite,Trained & Began Work on 900312 ML17285B1381990-03-29029 March 1990 Forwards Concluding Rept of Results Requested by Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment. Air Quality Testing Performed to Date Reveals Steadily Improving Results ML17285B1131990-03-28028 March 1990 Advises of Release of Subchannel Thermal Hydraulic Computer Code & Requests Review of VIPRE-01 Mod-02 & Issuance of SER for PWR & BWR Applications.Bwr Qualification Analyses Completed & Rept on BWR Applications Encl ML17285B1331990-03-23023 March 1990 Responds to NRC 900221 Ltr Re Violations Noted in Insp Rept 50-397/89-40.Corrective Actions:Plant Procedure 10.25.63, Emergency Lighting Insp in Process of Being Expanded to Provide Instructions & Check Sheets to Ensure Uniform Insps ML17285B1311990-03-21021 March 1990 Forwards Proposed Bases Change Re 891129 Request for Amend to Tech Spec Table 4.3.6.1, Srm/Irm Detector Not-Full-In Functional Test. Bases Change Describes Special Circumstances Re Test Exception ML17285B1291990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in LWRs & Generic Ltr 89-21 Re Status of Implementation of Usis.Tech Specs Adequate to Verify Operability of Overfill Protection Sys ML17285B1171990-03-19019 March 1990 Suppls 900102 Response Re Implementation of fitness-for-duty Program at Facility.All Items Identified as Incomplete as of 900103 Completed at End of Jan 1990 ML17285B1121990-03-15015 March 1990 Provides Level of Property & Liability Insurance Coverage for Facility,Per 10CFR50.54(w)(2) Annual Requirement ML17285B0931990-03-0202 March 1990 Forwards Supplementary Info Re 900214 Application for Amend to License NPF-21,revising Tech Spec 3.3.7.5 to Address Failed Safety/Relief Valve Position Indicators ML17285B0741990-03-0202 March 1990 Responds to NRC 900201 Ltr Re Violations Noted in Insp Rept 50-397/89-30.Corrective Action:Plant Personnel Currently in Process of Making Improvements to Plant Operations Procedure Writers Guide ML17285B0861990-03-0101 March 1990 Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01 ML17285B0581990-02-26026 February 1990 Forwards Washington Nuclear Plant-2 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989 & Amend 7 to Odcm. 1990-08-27
[Table view] |
Text
REGULATORY 'I RMATION DISTRIBUTION SYST (RIDS)
ACCESSION NBR:82020902?4 DOC ~ DATE: 8?/01/28 NOTARIZED! NO, DOCKET FACILt50-397 BYNAME WPPSS Nuclear Projecti Unit 2r Nashirigton Public Powe 05000397 AUTH AUTHOR AFF ILIATION BOUCHEYiG,D, washington 'Public Power Supply System RBCIP ~ NAME RECIPIENT AFFILIATION TEDESCOER ~ L, Assistant Director for Licensing
SUBJECT:
Requests relief from ASME Section XI requirements re welds found to be partially inaccessib'le during fit st 90K of
, preservice insp 'baseline, Remaining 10K of baseline exams should be completed before June 1982, DISTRIBUTION CODE: BOO IS COPIES:RECEIVED:LTR J ENCL > SIZE:.
NOTES:2 copies all matl:PM'5000397 TITLE: PSAR/FSAR AMOTS and Related,Correspondence REC IP IENT COPIES RECIPIENT COPIES IO CODE/NAME LTTR ENCL ID CODE/blAME LTTR ENCL ACTION: A/D LICENSNG 1 0 LIC BR P2 BC 1 0 L I C BR 0? LA 1 0 AULUCKER ~ 01 1 '1 INTtERNALe ELD 1 0 IE 06 3 3 IE/DEP/EPDB 35 1 IE/DEP/EPLB 36 3 3 MPA 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 '
2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEBPO 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 3Q 1 1 NRR/OHFS/PTR820 1 1 NRR/DSI/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I /ETSB 1? 1 1 NRR/OS I/ICSB 16 1 NRR/DSI/PSB 19 1 1 NRR/OS I/RAB 22 1 1 RSB 23 1 1 NRR/OST/LGB 33 1 1 04 1 1 EXTERNAL: ACRS 41 16 16 BNl (AMDTS ONLY) 1 1 FEMA REP DI V 39 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: L'TTR 'f ENCL
~ ~
h P
It'I ht I
"'DR, 8 ', ',
B~o2o9a224 szoiis
".ADOCK;05000397
~ ~ PDR Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, g 352 (509) 372-5000
/~p S> ],
4:Q p~
CSSt~< 19@~
Docket No. 50-397 >CPPgy +ktl gy~
S t~gre Sl January 28, 1982 G02-82-121 Director, Office of Nuclear Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: R. L. Tedesco Assistant Director for Licensing Division of Licensing
Subject:
NUCLEAR PROJECT 2 ASME SECTION XI INSERVICE INSPECTION REQUEST FOR RELIEF NO. PSI-2-001
References:
a) G02-81-545, dated December 23, 1981, GD Bouchey (Supply System) to RL Tedesco (NRC), "Response to NRC Questions on the HNP-2 Preservice Inspection Program" b) Draft Memorandum, NV Johnson (NRC) to RL Tedesco (NRC),
"Meeting with HPPSS Concerning the Preservice Inspection Program on October 9, 1981" Reference a) transmitted the Supply System's responses to the Reference b) questions. This letter transmits a copy of Request for Relief from ASME Section XI requirements, PSI-2-001, which supplements responses to items 1, 2, and 13 in Reference b).
This Request for Relief represents welds found to be partially inaccessible during the first 90 percent of the Preservice Inspection (PSI) baseline.
The remaining ten percent of the PSI baseline exams should be completed peel
~ ~ 4 il
'p
R. L. Tedesco Page 2 Docket No. 50-397 before June 1982. At that time, Request for Relief PSI-2-001 will be updated to include all welds that did not meet Section XI examination requirements.
G. D. Bouchey - 370 Deputy Director, Safety and, Security DPR/sms Attachment cc: R. Auluck, NRC 0. Lageraaen, B&R NY H. R. Canter, B8R RO N. D. Lewis, EFSEC W. S. Chin, BPA F. A. HacLean, GE A. I. Cygelman, B&R RO A. Schwencer, NRC R. Feil, NRC Site R. E. Snaith, B&R NY H. R. Humm, NRC L. Santos, GE J. A. Forrest, B&R RO J. J. Verderber, B&R NY
H IJ f
A N
r i)
NOTES TO FOLLOWING WELD TABLES Isometric drawing numbers (Iso. No.) which start with a "1" such as MS-101 are Code Class 1 and Section XI Category B-J.
Isometric drawing numbers (Iso. No.) which start with a "2" such as MS-201 are Code Class 2 and Section XI Category C-F.
The entire reactor pressure vessel (RPV) was completely examined except for the small areas identified under remarks on the following RPV (category B-A) weld tables.
~ ~
RE(UEST FOR REI IEF NO. PSI-2-001 Component ASNE Class 1,Section XI Category 8-A* pressure retaining welds.
or System ~
in reactor pressure vessel. List attached.
ASNE Class 1,Section XI Category B-J 'pressure retaining welds in piping. List attached.
. ASNE Class 2,Section XI Category C-F pressure retaining welds in piping. List attached.
Code All of the subject welds were designed and fabricated to ASNE Section III Class 1 or 2. The Preservice Inspection is to be performed to the 1974 Edition SUmmer 1975 Addenda of ASNE Section XI.
Number ~cate or No.
f o 'Wel ds B-A 13 .
B-J 5 C-F Secti on XI Section XI requires examination of 100Ã of the pressure retaining Requirements welds in Categories B-A*, B-J and C-F be performed completely as a Preser vice Inspection'before initial plant startup. The following examinations are required:
All pressure retaining welds in Reactor vessel. volumetric 8-J Circumferential and longitudinal piping welds. volumetric Branch pipe connection welds exceeding 6-inch volumetric diameter.
Branch pipe connection welds 6-inch diameter and surface smaller.
Socket welds. surface Circumferential butt welds. volumetric Longitudinal welds joints in fittings. volumetric Branch pipe-to-, pipe welds joints. volumetric Basis for Relief is required from ASNE Section XI examination requirements Requesting on the basis of partial inaccessibility of the weld due to plant Relief design. The specific inaccessibility problem for each weld. is explained under remarks on the attached tables.
pl l
Alternative The welds (except for the following) in this request for relief'are Examinations partially inaccessible to all examination methods.
20 RHR(1) A-4 (RHR-201)
. 20 RHR(1) B-4 '(RHR-207)
These two welds will be examined by UT in the areas where PT was not possible.
. Impact on There will be no adverse impact on plant quality and safety by Plant guality doing only a partial code examination of these weld'.
and Safety The Class 1 piping welds have passed radiographic and dye penetrant examinations in accordance with Section IIi.
- 2. The Class 2 piping welds have passed radiographic examination in accordance with Section III.
- 3. The Class 1 RPV welds have passed radiographic, magnetic particle and ultrasonic examinations in accordance wi th Section III..
- 4. All of the identified welds will be subject to a system pressure test in accordance with Section XI Class 1 or 2 requirements.
- 5. Leak detection systems identify significant leakage in the areas of the subject piping welds. Appropriate operator action would occur due to leak detection system alarms.
- 6. Alternate systems can bring the reactor to a safe shutdown.
- 7. Other similar welds in the vessel or same piping run will receive full code examinations. The integrity of the pressure boundary can thus be verified by sampling.
- Category B-A per 1977 Edition Summer 1978 Addenda, this includes both Category B-A and B-B welds per 1974 Edition, Summer 1975 Addenda. Category B-A and B-B have been com-bined into B-A in later codes. The NNP-2 PSI Program considers these Category B-A so the PSI Program will be consistent with the ISI Program.
I I
l
I ~
~
) II 0 ~ ~
~ e I s 'l
~ I I ~ 'e ~ c .. c 'l
~ g ~
I 'I ~ I I ~ I I I I~ I ~
~ ~ ~ ~
I~ II I II I
~
) g
~ ~
) ) ~
I) ~ I ~ I )I 'I
~ ~ ~ ~
I ~ ~
)I I 'I 0 I ~ I I'
~
~ ~
) ~
I ~ ~
)I I 'I I ~ ~ ~
I
i CATEGORY .B-A SECTION III ISO. NO. HELD NUMBER DATA SHEET DESCRIPTION EXAM REIRRKS RPV-102 DC RPU-'090, 118, BOT HD MRD 8 32 MT, UT, RT See Note 2 080, 112, 100 108 RPV-102 DD RPU-091, 119, BOT HD MRD 9 92 MT, UT, RT See Note 2 081, 113, 101 109 RPV-102 DE RPU-092, 120, BOT HD MRD 8 152 MT, UT, RT See Note 2 082, 114, 102, 122 RPV-102 DF RPU-093, 121, BOT HD MRD 9 212 See Note 2 083, 115, 103, 123 Note. 1: Only 12" to 23" on each end of the weld, starting from the intersection of weld AJ, can be examined due to CRD penetrations and housings.
Note 2: Only 21" starting from the.: .
intersection of weld AA starting from the inter-and'4" section of weld AJ can be examined due to vessel support skirt. (Approxi- gP mately one foot is not being examined on each weld.)
TC 'rc Coo f LLNCva
~ WI e 0 :I I ISI/tits/. /Yt ttw SS L 'CLOO~I ROC IS A
4 ~ ~ ~ 4 l. 0'tf CR 10 PAOR'Rklk PLAN (LCR'tpuLL A
410 '110 V QO IkbL%% COR ttkMINLlloH\,CALIQALCION I~ 4 RCCLUCR%MSNCL.
1541 DN %%,
100 ltv CSLOCCC 0 Mat Iuplcklt5 MLIIRQCPLIR kata, 151'0 1
MAP 1 MAP R3 kf 141$ N0111$ lo bkct auo I<<L I wet II NSQ VCCLO tRCP ISNRC I IIDWN.
NLD NLC N'SL
- 3. MRP Rl lS 'L~g 10 '3ia IN Dttlll Il (
140 0
'110 340 HKD~
~tl 311 '15 WIOR OV 30 CCCCIN 'klolt Ilckl MRP NIL CI kqtk CCNCCQ.IL DIMCNSIONLLLV
~ 10 tf0 po'0 ISmR
+ 5C.ILL LO X 4.
Rtf(RCNCSD.
COR Dt'ILIL5 OF Notllt ASSCMOL'V $ $ $
4141 CHICO) RPV ~ 115.
1'Io'Cia OCI $ 5$ IO'ov
~CL SCL 33 110 2lo P.
0 p
ul'1 l CLOTS I SCL
- 2. ll oQf oo
$ . CLAOOIIICv PAtCH LOCAIIQNLC LC,SIC0210 LDW CLAHCLS LIP.
AC ARL 11 PNS 110'lk NLC ICLC I44D CfL Natal l 3 III 00 At, ~ 4 5) '150't, t SCw I~ I'Af.
HI0 SO ISI 330 AI. AR\ CL Aovvt IRC 1%0 314 N01.3.L't5,
~
O ~EL SSR (5I I N0 I t 4)
AC ~\L $ $~4. SI'L 315 1$ 0 'Ll~
llov + 4$ PIII f) p ucc QN
~1 t00 0
%tv
\LIP 0
Lopv RF 0 NQL Nltk
+52'XL 3%1 '0 RftfatNCIS NllD N IIQ NL1 \ ats'ltt I 4 ~l% I . O SURNS I,Rot DRLVIINCC Cot AC I 'IY Co 0 C t M4$ 0 Rtu 1 10't III
(<<t uIIC5 I I I) ~L 'Ill ~ CLA
~ I Yl AS ~St. 540 ts
~ - ~(sta Naca a) cL 53510ttII-80110 M ACI IVC CCRC SALC I'I0 tlo' I'IO 00 0 "i 0 150 0IK 330 0 0 Ntl ~ N'lR 0
Ntfv 0
NIF 0 140 0
Nat Nl4 0
Nlk N'Ia
~CL S34
~g. 533'L
'%33 HI%@
3'IS'0 '1'15 135 N1I N acs bC 'bb OVICAC 'KN'ICALt ILRl Stl '3 4.
331.3L'03 '111 'SL PL tll. S'L Df 151131 QC DD 11 .SL PC.
~E 5~1% 4 R0110M NCLD 0 110'%0 OVAllffCLASS.
INOR.Y,NLNNLN 1 ASMf COOI CLASS DRARNINIIILcI 1
DA(t, L.LWI1%
OOI SI0C VICVI WASHINGTON PUBLIC POWER IHISORAWINO IS INftNOIOSON SUPPLY SYSTEM t
CISI IN NISI RV ICI AND INN RVIC f VVCCVVho WVCHWGCCPC VCJCI INSttCIION tROORAMS ONLY.
NOM NOM MAIL CAL Wut 1 MAICRIAL tltlNO SYSIIM 0 IA IINC SCI I 'WALL INK St ICI S ICAICON litt ~ LOCK NO Wtlo ~ COMSONCNI IotNIHCCAIIONOIAORAM CIISI tl $ $ 1 4 vfcl fcf ltwlclscl Atfvvc NII II\4 It cuacill Ifk Q~LIOA fatavAIQC ICLUI 25 I ~5k 4)v SSS 4%% Cp uo'. ~ 1 I.QIS A%ala UICARIRC ~ ACuvt CICC EiV II IIII I llucla RCILLCLtnta\ flail UAI. APPCD Notta 4 I 5 Rtch(%OR P R(4 AC)RF. V'ESS(L ROLL. Ogl 0 CSSUCD 'FOR CISC 341-1 I ILSU%0 FOIL INSORMILIION'ONLY OWONO, RQV 101 IIIV R OAIC RIVIMON
C
~~
No it%
0
- 1. R(VCR (0 tROCARLIA t(LII( CAIL(40(r (ABa(S COQ.C'ILLMINk(IONCailoAJIVIN SLA(aa 4$ 0aIIRLMLNI\
I: FCR OCIAILS or Nottl( tatfcMOLV 5CC 04 RDV 111 a($ Vv Ot 0
NI ot 16 XTo 0NS 40 Oa DN C
2(Sa~ /$ (a S'jC NLS Isle tlolt I) 00 OG HIICHINCIS AN aL(4$
/
/
OHI DR
/
/
1'aaa
/ I I I
'I LSO ok I zt1'T0 I 00 Tot la(ko kv\(NISLC tv) I 0 Nl0 I I OL O'LLN 'IICW
/
GuppoRT SKIRT C>AT i AI
/ AA N'LL 0
Dt OC
'I'41 g
1\0 OVAIIIYCIASS. Attat COOC CI.ASS BOTTOM I(CAD ACC%,IARL'I ktv) CNGII; Fa LVAC DHAWN:VAMAW DA'lt 1 IS %4 (NSIO( O'LLN VICVe WAS)IINGTON PUBLIC POWER THIS DIIAWINGIS INTtHDto IOII SUPPLY SYSTEM OSC W tACSCIIVICC ANO LNSIHVICC Aa & aao waHvaCICN aaat IN ltt I t C ION ROC 4 AN 5 DN L Y Noal CAL IAHA IIAI I IIIAL NATL 'SIDCA tltINGSYSICN OIA WALL SttCIIICAIHHI Tvtt NO W t I 0 ~ CoaltONLNI IWI THA IOINIIIICATION OIACHAII
'IOt IICko Nk $ (t,si Sk 50B CaR B NOT% 1
~
Cl ta
~ II II 0
g IAAt 15 IHtatall0 Aoot No (~
IaaC I. SHHLI Oa(%CO 1(%%co CCRC(c Oo(IOMRCLO 15( Nk sk 04 R'0 CS NOT% 1 IIILC.
~
RrkCCOR. PLCE5BuRR VRS(aru
'top ( csotxolv( NrAo atl ~ Los lltV 1.
A ST(II CSSO'CO COQ. LNCORMLT'l014 ONLI Owo NO. ROV 107. ~ ~
NO DAIS HCVISION OY CH Attv
'v j
CATEGORY B-J and C-F DATA SEC. SECTION III ISO. NO. WELD NUtlBER SHEET X I DESCRI PT ION EXAM REfORKS NO. EXAM RHR-201 20 RHR(1) A-4 RHP 190 PT Pipe to Reducer RT No surface exam 330 -30 due to permanent obstruction (6" not examined). Alternate exam UT from 1 side.
RHR-207 18 RHR(1) B-7/ RHP-154 PT Branch Connector RT 1'," around 0 not examined due to perman-6 RHR(7)-2 ent (welded harlger) inter'ference.
RHR-207 20 RHR(1) B-4 RHP-201 PT Pipe to Elbow RT No surface exam 330 30 due to perman-ent obstruction (6" not examined).
Alternate exam UT from 1 side.
RHR-207 18 RHR(1) B-42 RHP-201 PT Pipe to Elbow 4" around 180 RT No exam obstructed by permanent hanger.
RFW-101 18 RFW(1) A-4 FWP-046 PT Pipe to Reducer RT/PT 2>~" around 0 not examined-welded "N" stamp.
RHR-106 12 RHR(1) B-11LDO. RHU-075 Elbow Seam 4" to 5'," due UT RT/PT No exam to branch connection (13;" not examined).
RRC-101 24 RRC(2) A-8LDI RRU-101 Elbow Seam 18" to 19" due to instrument UT RT/PT No exam line interference (1". not examined).
RRC-101 24 RRC(2) A-8LDO RRU-101 UT Elbow Seam RT/PT No exam 38" to 40" due to branch conn@etio (2" not examined).
RRC-102 24 RRC(1) B-6LDI RRU-112 UT Tee Seam RT/PT No exam 17" to 18" due to fitting (1" not examined).
4 RST F0R RELIEF 110. PSI-2-001 I J4i q, I 4
1I ILQ ~" IJ JI I4PJJtf44JIlJ' yII )Iy'l i (Ill"$
(%~
i 20 RHR (1) A-4 18 RHR (1) B-7/6 RHR (7=)-2
~ J 4 Jl I
'4 JC
/)
IIJ 4 4
4.
SP, I'Pg P 6,,
44\
20 RHR(1) B-4 18 RHR(l) B-42
J 4
PEST FOR RELIEF NO. PSI-2-001 4
}to 4 I IP II I
~>>
l OtOIt,
,,I4 18 RFW(1) A-4 12 RHR(1) B-11LDO 4I, 4T P
o J IV(
Cl Jl 3
o
.F I vlf it I I, J
II 24RRC(2)A-8LDI 24RRC(2)A-8LDO
RE(T FOR RELIEF NO. PSI-2-001 gj 24 RRC(l)B-6 LDI
1t a
4 4