ML17275A632

From kanterella
Jump to navigation Jump to search
Forwards Amend 11 to Fsar.Affidavit Will Be Provided within 10 Days
ML17275A632
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/08/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Youngblood R
Office of Nuclear Reactor Regulation
Shared Package
ML17275A633 List:
References
GO2-80-220, NUDOCS 8010170120
Download: ML17275A632 (6)


Text

REGULAT 'Y INFORMATION DISTRIBUTIO "YSTEM (RIDS)

ACCESSION NBR: 8010170120 DOC ~ DATE: 80/10/08 NOTARIZED: YES DOCKE'T FACIL:50-397 WPPSS Nuclear. Projecti Unit 2i Wash,ington Public Powe 05000397 AUTH'AME AUTHOR AFFILIATION RENBKRGERiD ~ LE Washington Public Power Supply System RKC IP ~ NAME RECIPIENT AFFILIATION YOUNGBLOODgR ~ J ~ Licensing Branch 1

SUBJECT:

Forwards Amend 11 to FSAR ~ Affidavit will be provided within 10 CODE! B001S days'ISTRIBUTION COPIES RECEIVED: LTR ~

EiVCLi Ojl SIZE;, 5-~goo TITLE.: PSAR/FSAR AMDTS and Related Correspondence NOTES:PM: 2 copies of all material. 05000397 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LiTTR ENCL ID CODE/NAME LTTR ENCL ACTION: A/D LICENSNG 1, 0 YOUNGBLOODiB 1 0 RUSHBROOKgMe 1 0 LYNCHiD, 04 1 1 INTERNAL: ACCID EVAL, BR?6 1 1 AUX SYS BR 07 1 1 CHEM ENG BR 08 1 1 CONT SYS BR 09 1 1 CORE". PERF BR 10 1 EFF TR SYS BR12 1 1 EMERG PREP 22 1 0 EQUIP QUAL BR13 1 1 GEOSC IENCES 14 HUM FACT ENG BR HYD/GEO BR 15 '21 1 2 IH C SYS BR 16 1

1 1

1 I8E

  • 06 3 3 LIC GUID BR 1 1 LIC QUAL'R 1 1 MATL.'NG BR 17 1 1 MECH ENG BR 18 1, 1" MPA 1 0 NRC PDR 02 1 1 OELD 1 0 OP LIC BR 1 POWER SYS BR 19 1 1 PROC/TST REV 20 1 1 QA BR 21 1 l SS BR22 1 1 REAC SYS BR 23 1 1 FIL 01 1 SIT ANAL BR 2Q 1 1 KNG BR25 1 SYS INTERAC. BR 1 1 EXTERNAL: ACRS 27 16 16 LPDR 03 NSIC 05 1 1 OCr 8O rheo NUMBER OF COPIES REQUIRED: LTTR PB ENCL, Lgi'OTAL.

s.L

h f f LL f ff g

fh T

I )I 4 O~f~V t-

'0

Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. Box Qee 3000 Gco. WASHINCTOH WAY RICHLAND, WASHINCTON 99352 PHDNS (509) 375.5000 G02-80-220 October 8, 1980 Docket No. 50-397 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Nr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing

Dear Hr. Youngblood:

Subject:

WPPSS Nuclear Project,No. 2 FSAR Amendment ll The Washington Public Power Supply System herewith submits sixty (60) copies of Amendment 11 to its Final Safety Analysis Report.

Pursuant to 10CFR2.101, we will, within ten (10) days of filing, furnish to you an affidavit ref'lecting our distribution of this amendment to your designated distribution list.

Yery truly yours, D. L. Renberger Assistant Director Technology DL'R:CDT:cph CC: JJ Yerderber - B&R, NY HR Canter - B&R, NY J. Ellwanger - B&R, NY, RC Root B&R', Site FA HacLean - CiE E. Chang - GE NS Reynolds - Debevoise & Liberman N. Izaak - WPPSS, NY ND Lewis - EFSEC, Olympia JR Lewis - BPA WNP-2 Files 5 IIxoxTo I g, O

df A ll 4I

STATE OF*WASHINGTON)

) ss FSAR AMENDMENT NO. 11 COUNTY OF BENTON D. L. RENBERGER, Being first duly sworn, deposes and says: That he is the Assistant Director, Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the fore-going on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED 8 ~~ 7, TDGD D. L. RENBERGER On this day personally appeared before me D. L. RENBERGER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIYEN under my hand and seal this g day of a

u otary Pu sc 'n n o the State of Washington Residing at

r~ ' a

+p P~ I I" I