Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Initial Response of 800808 Indicated Review Due by 800915.Due to Delay in Obtaining Info,Review Will Be Completed 801103
ML17275A621
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/09/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-80-196, IEB-79-03A, IEB-79-3A, NUDOCS 8010080576
Download: ML17275A621 (2)


Text

Ag~l. pig Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. Box 9BB 3000 Gso. WAs><<Nero~ Wiv RicHaANo. W*SHINoroN 52 QCNON m+50+ 75 5000 September 9, 1980, G02-80-196 Docket No. 50-397 tlr, R. H. Engelken, Director U. S. Nuclear Regulatory Commission Region V 1990 N. California Boulevard Suite 202 Walnut Creek Plaza Walnut Creek. California 94596

Dear tlr. Engelken:

Subject:

WPPSS NUCLEAR PROJECT NO. 2 RESPONSE TO IE BULLETIN 79-'03A

Reference:

Letter, Ser. G02-80-174, D. L. Renberger (WPPSS) to R. H. Engelken (NRC), same subject, dated August 8, 1980.

In the referenced letter, we indicated our intention to complete a review of contractor material lists by September 15, 1980. Due to a delay in obtaining a complete material listing from two piping con-tractors, it is now anticipat'ed that the review will not be completed until November 3, 1980.

Very truly yours,

~~ /e c(~.~

D. L. Renberger Assistant Director, Technology cc: Office of ISE, Division of RCI-Washington, D.C.