ML17275A575

From kanterella
Jump to navigation Jump to search
Forwards Amend 10 to Fsar.Affidavit of Distribution Will Be Furnished within 10 Days of Filing.Affidavit & Burns & Roe Errata Sheet Encl
ML17275A575
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/08/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML17275A572 List:
References
GO2-80-170, NUDOCS 8009090680
Download: ML17275A575 (6)


Text

REGULATOR" INFORMATION DISTRIBUTION S"STEM (RIDS)

ACCESSION NBR:8009090680 DOC ~ DATE: 80/08/08 NOTAR ZED: NO . DOCKET FACIL:50-397 WPPSS Nuclear ProJect~ Unit 2i Washington Public Powe 05000397 AUTH'AME AUTHOR AFFILIATION RENBERGERiD.LE Washington Public Power Supply System REC IP ~ NAME RECIPIENT AFFILIATION gPg)

YOUNGBLOODgB ~ J ~ Licensing Branch 1

SUBJECT:

Forwards Amend 10 to FSAR.Affjdavit of djstribution will be rnished within 10 days of filing. Affidavit 8 Burns 8 Roe errata sheet anal.

DISTRIBUTION CODE: B001S TITLE:

g COPIES RECEIVED:LTR PSAR/FSAR AMDTS and Related 3 ENCL p~:

(fan SIZE: S Correspondence o'~+0 NOTES:PM: 2 cooies of all material. 05000397 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACT'ION: A/D LI CENSNG 1 0 YOUNGBLOODiB 1 0 RUSHBROOKgM ~ 0 LYNCHpD ~ 09 1 1 INTERNAL: ACCID EVAL BR26 1 1 AUX SYS BR 07 1 1 CHEM ENG BR 08 1 1 CONT SYS BR 09 1 1 CORE PERF BR 10 1 1 EFF TR SYS BR12 1 1

~

EMERG PREP 22 1 0 EQUIP QUAL'R13 1 1 GEOSCIENCES 14 1 1 HYD/GEO BR 15 1 1 IE C SYS BR 16 1 1 ILE 06 3 3 MATL ENG BR 17 1 1 MECH ENG BR 18 1 1 MPA 1 0 NRC PDR 02 1 1 OELD 1 0 POWER SYS BR 19 1 1 PROC/TST REV 20 1 1 QA BR 21 1 1 RA S S BR22 1 1 REAC SYS BR 23 1 01 1 1 SIT ANAL BR 2Q 1 1 ENG BR25 1 1 EXTERNAL: ACRS 27 16 16 LPDR 03 1 1 NSIC 05 1 1 SEP 12 ling TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL

C>

e

Washington Public Power Supply System A JOINT OPERATING AGENCY P. o. eox 958 3000 Gso. wAs~iNcroN w*v RicHiANo. wAsHiNcro~ 99352 PHoNs F509) 375 5000 August 8, 1980 Docket No. 50-397 G02-80-170 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing

Dear Mr. Youngblood:

Subject:

WPPSS Nuclear Project No. 2 FSAR Amendment 10 The Washington Public Power Supply System herewith submits sixty (60) copies of Amendment 10 to its Final Safety Analysis Report.

Pursuant to 10CFR2.101, we will, within ten (10) days of filing, furnish to you an affidavit reflecting our distribution of this amendment to your designated distribution list.

Very truly yours,

. Renber er Assistant r or Technology DLR:CDT:cph cc: JJ Verderber - 88R, NY HR Canter - 88R, NY RC Root - 88R, site J. Ellwanger - B8IR,NY FA MacLean - GE, San Jose E. Chang - GE, San Jose NS Reynolds - Debevoise 8 Liberman M. Izaak - WPPSS,,NY ND Lewis - EFSEC, Olympia, Wa. 5 JR Lewis - BPA Files WNP-2 3/<o 5 00909 0 III

K STATE OF WASHINGTON)

WPPSS Nuclear Project No. 2

) FSAR Amendment 10 OF BENTON ss'OUNTY

)

G.. F. BAILEY, Being first duly sworn, deposes and says: That he is the Manager, Technical'ivision, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED , 1980 F. AILEY On this day personally appeared before me G. F. BAILEY to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the 'same as his free act and deed for the uses and purposes therein mentioned.

GIYEN under my hand and seal this 1

day of ~ ., 1980.

ry lac in for the State

~

No P and of Washington, Residing at ~~ c4- QM

J

- t