ML17272A989

From kanterella
Jump to navigation Jump to search
Forwards Amend 9 to FSAR
ML17272A989
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/27/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Youngblood R
Office of Nuclear Reactor Regulation
Shared Package
ML17272A991 List:
References
GO2-80-109, NUDOCS 8006110135
Download: ML17272A989 (5)


Text

REGULAT INFORMATION DISTRIBUTIO TEM (RIDS)

ACCESSION. NBR:8006110135 DOO ~ DATE; 80/05/27 NOTARIZED; NO DOCKET ¹ FACIL:50-397 BYNAME WPPSS Nuclear Projecti Unit 2i Washington Public Powe 05000397 AUTH AUTHOR AFFILIATION RENBERGERiD.L, Washington Public Power'upply System RECIP ~ NAME RECIPIENT AFFILIATION Office of>> Nuclear Reactor Regulation YOUNGBLOODiR,J. Licensing, Branch 1 SUBJECT! Forwards Amend 9 to FSAR ~

SIZE:~~

4 DISTRIBUTION CODE: BOO IS COPIES RECEIVED:LTR Qr ENCL Q TITLE> PEAR/PEAR ANDTS end Releted Correspondence NOTES 9 PO ' 2- CoLG ~L>>=

RECIP'IENT COPIES, RECIPIENT "

COPIES ID CODE/NAME LTTR ENCL ID LTTR ENCL M L~4~+

COD//NAME'D ACTION: 05 PM 1 0 i~/ ~g

~ 1 1 BC 1 0 LA L.~mH 0 INTERNAL! 01 REG FILE 1 1 02 NRC PDR 1 1 06 I L E 3 3 08 OPERA LIC BR 1 09 GEOSC IEN BR 10 GAB 1 . 1 11 MECH ENG BR 1 1 12 STRUC ENG BR 1 1 13 MATL ENG BR 2 2 15 REAC SYS BR 1 i 16 ANALYSIS BR 1 1 17 CORE PERF BR 1 1 18 AUX SYS BR 1 1 19 CONTAIN SYS 1 20 I.L C SYS BR 1 1 21 POWER SVS BR 1 1 22 AD SITE TECH 1 0 26 ACCDNT ANLYS 1 1 27 EFFL TRT SYS 1 1 28 RAD ASMT BR 1 1 29 KIRKWOOD 1 1' AD FOR ENG 1 0 AD PLANT SYS 0 AD SITE ANLYSIS 1 0 AD/CORE" L CONT 1" 0 DIRECTOR NRR 1 0 HYDRO METEOR BR 2 2 MPA 1 0 OELD 0 EXTERNAL: 03 LPDR 1 1 00 NSIC 1. 1 30 ACRS 10 10 il OAR~ /6 Jul ga >gag

+9 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL

F

~ ~ ~

f t 0 v O Ii ~

C CC - IC ~ I ff H

Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 950 3000 GSO, WASHWeVON WAV R>CHL.AN0, WASHiNSVarC 99352 PRONS (509) 375 5000 G02-80-109 May 27, 1980 Docket No. 50-397 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing

Subject:

WPPSS NUCLEAR PROJECT NO. 2 FSAR AMENDMENT 9

Dear Mr. Youngblood:

The Washington Public Power Supply System herewith submits sixty (60) copies of Amendment 9 to its Final Safety Analysis Report.

Pursuant to 10CFR2.101, we will, within ten (10) days of filing, furnish to you an affidavit reflecting our distribution of this amendment to your designated distribution list.

Very truly yours, D. L. RENBERGER Assistant Director-Technology DLR:CDT:cph cc: JJ Verderber B8R, N.Y.

HR Canter - B8R, N.Y.

RC Root B&R, Site J. Ellwanger - B&R, N.Y.

FA MacLean - GE, San Jose E. Chang - GE, San Jose NS Reynolds - Debevoise & Liberman o M. Izaak - WPPSS, N.Y. ~yb ND Lewis - EFSEC, Olympia, Wa.

JR Lewis - BPA WNP-2 Files So ocr so/3 Di

STATE 'OF 'ASHINGTON) WPPSS NUCLEAR PROJECT NO. 2

) ss FSAR ANENDNENT NO. 9 COUNTY OF BENTON )

D. L. RENBERGER, Being first duly sworn, deposes and says: That he is the Assistant Director, Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEH, the applicant herein; that he is authori zed to submit the fore-going on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED , 1980 D. L. RENBERGER On this day personally appeared before me D. L. RENBERGER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIYEN under my hand and sea'I thts ~today of , 1980 Not ry Pu sc in and for t State of Washington Residing at

a l

S>>

)

E i ~ 4 I I

I