ML17272A758

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Spent Fuel Pool Cooling Sys
ML17272A758
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17272A757 List:
References
GO2-79-212, NUDOCS 7912280642
Download: ML17272A758 (2)


Text

P Washington Public Power Supply System A JOINT OPERATING AGENCY S P. O. BOX 958 3000 GaO, WASnlNOtON W*Y R>CSLaNO, WASHINOrON 99353 PHONL'509) 375 5000 November 30, 1979 G02-79-212 4

Nuclear Regulatory Commission PEcEI v[0 Region V Office of Inspection and Enforcement OEC 5 1979 Suite 202, Walnut Creek Plaza 1900 North California Boulevard Walnut Creek, CA 94596

/] Ot 6

Attention: Mr. R. H. Engelken, Director

Subject:

WPPSS NUCLEAR PROJECT NO. 2 DOCKET NUMBER 50-397 REPORTABLE DEFICIENCY - 10CFR50.55 e

References:

Letter G02-79-191 from D. L. Renberger to R. H. Engelken dated October 18, 1979, same subject

Dear Mr. Engelken:

The referenced letter documented a reportable condition in accordance with the provisions of 10CFR50.55(e) involving the WNP-2 spent fuel pool cooling system. The letter .also included an interim report of the deficiency.

The final report of action being taken to correct this condition is attached.

Please contact us if you have additional questions.

Very t~ruly yours, D. L. RENBERGEk Assistant Director Technology DLR:TRM:cd attachment: as stated CC: JM Blas - B&R w/att JJ Verderber - B&R w/att RE Snaith B&R w/att JR Lewis . BPA w/att JG Davis, Director, NRC, Washington, D.C., w/att RC Root - B&R Site w/att MJ Parise - B&R Site w/att WNP-2 files w/att GT Harper - B&R Site w/att

~g