E-MAIL: (PD) Draft Program Detail Pilgrim ACRS Subcommitte Presentation.Ppt
ML071020296
Person / Time
Site: Pilgrim
Issue date: 03/28/2007
From: Ford B
Entergy Nuclear Operations
To: Perry Buckberg
NRC/NRR/ADRO/DLR
References
TAC MD3698
Download: ML071020296 (7)


Text

Per begDafi Pilgrim ACRS Subcommittee presentation.ppt Pagel1 From: "Ford, Bryan" <BFord@entergy.com>

To: "Perry Buckberg" <PHB1 @nrc.gov>

Date: 3/28/2007 12:49:13 PM

Subject:

Draft Program Detail Pilgrim ACRS Subcommittee presentation.ppt FYI

<<ENI Slides for Pilgrim ACRS Subcommittee presentation.ppt>>

§At~p\GW }00004.TM P Page i7j Mail Envelope Properties (460A9C7A.160: 12 : 45408)

Subject:

Draft Program Detail Pilgrim ACRS Subcommittee presentation.ppt Creation Date 3/28/2007 12:48:53 PM From: "Ford, Bryan" <BFord@entergy.com>

Created By: BFord@entergy.com Recipients nrc.gov OWGWPO01 .HQGWDO01 PHB 1 (Perry Buckberg)

Post Office Route OWGWPO01.HQGWD01 nrc.gov Files Size Date & Time MESSAGE 72 3/28/2007 12:48:53 PM ENI Slides for Pilgrim ACRS Subcommittee presentation.ppt 78848 Mime.822 110620 Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

Pilgrim LR Project 14 Programs in Place w/o Enhancement Boraflex Monitoring Program BWR Feedwater Nozzle Program BWR Penetrations Program BWR Vessel ID Attachment Welds Program Containment Leak Rate Program Environmental Qualification of Electric Components Program Fatigue Monitoring Program Flow-Accelerated Corrosion Program In-service Inspection Program Reactor Head Closure Studs Program Masonry Wall Program Water Chemistry Control - Auxiliary Systems Program Water Chemistry Control - BWR Water Chemistry Control - Closed Program Cooling Water Program

- Entergy

Pilgrim LR Project 16 Programs Require Enhancement

" Enhancements for 4 Programs Planned by 12/31/08

- Fire Protection Program Enhancements

- Oil Analysis Program Enhancements

- Service Water Integrity Program Enhancements

- System Walkdown Program Enhancements

" Enhancements for 7 Programs Planned by 12/31/09

- Bolting Integrity Program Enhancements

- BWR Stress Corrosion Cracking Program Enhancements

- Diesel Fuel Monitoring Program enhancements

- Instrument Air Quality Program Enhancements

- Reactor Vessel Surveillance Program Enhancements

- Structures Monitoring Program Enhancements

- Water Control Structures Monitoring Program Enhancements

- Ente-gy

Pilgrim LR Project 16 Programs Require Enhancement (Cont.)

Enhancements for 2 Programs Planned by 12/31/10

- Fire Water System Program Enhancements

- Containment In-service Inspection Program Enhancements

  • Enhancements for 3 Programs Planned by 12/31/11

- BWR CRD Return Line Nozzle Program Enhancements

- BWR Vessel Internals Program Enhancements

- Periodic Surveillance and Preventive Maintenance Program Enhancements

-. Entergy

Pilgrim LR Project 10 New Programs 4 New Programs Planned Implementation by 12/31/09

- Buried Piping and Tanks Inspection Program

- Heat Exchanger Monitoring Program

- Metal-Enclosed Bus Inspection Program

- Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) Program

  • 3 New Programs Planned Implementation by 12/31/10

- Non-EQ Inaccessible Medium-Voltage Cable Program

- One-Time Inspection Program

- Selective Leaching Program

- Entergy

Pilgrim LR Project 10 New Programs (Cont.)

  • 3 New Programs Planned Implementation by 12/31/11

- Non-EQ Instrumentation Circuits Test Review Program

- Non-EQ Insulated Cables and Connections Program

- Non-EQ Bolted Cable Connections Program

- Entergy