Transmittal Ltr - Safety Evaluation Report with Open Items Related to the License Renewal of Pilgrim Nuclear Power Station
ML070510236
Person / Time
Site: Pilgrim
Issue date: 03/01/2007
From: Kuo P
NRC/NRR/ADRO/DLR
To: Kansler M
Entergy Nuclear Operations
Buckberg, P., PM, RLRA, 415-1383
Shared Package
ML070600795 List:
References
Download: ML070510236 (3)


Text

March 1, 2007 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1839

SUBJECT:

SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF PILGRIM NUCLEAR POWER STATION

Dear Mr. Kansler:

By letter dated January 25, 2006, Entergy Nuclear Operations, Inc., (Entergy), submitted, for the U.S. Nuclear Regulatory Commission (NRC) review, an application to renew the Pilgrim Nuclear Power Station (PNPS), operating license for up to an additional 20 years. The license renewal application (LRA) was submitted pursuant to Title 10 of the Code of Federal Regulations Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. The staff determined that the LRA was complete and acceptable for docketing on March 21, 2006.

The staff has reviewed the PNPS LRA and has developed the enclosed Safety Evaluation Report With Open Items Related to the License Renewal of the Pilgrim Nuclear Power Station, hereinafter referred to as the Safety Evaluation Report (SER). This SER reflects the status of the staffs review of the LRA, requests for additional information (RAIs), the applicants responses to the staffs RAIs and other questions related to the LRA through February 23, 2007, unless otherwise noted. Issuance of the enclosed SER is an important milestone for both the applicant and the staff.

The staff has identified open items in its review, that must be resolved before it can make a final determination on the application. SER Section 1.5 includes a listing of the open items with an explanation of the information required to satisfactorily resolve the issues. In order to resolve these items, the staff has requested additional information, as identified in the SER.

In accordance with the schedule for completing the review of the PNPS LRA, the applicant is requested to review the enclosed SER, verify its accuracy, and provide comments to the staff by April 1, 2007. The staff plans to review the current content and format of the SER for further improvement while incorporating the applicants comments. A revised SER will then be issued.

M. Kansler The staff is committed to completing the review of the PNPS SER in a timely manner. If you have any questions regarding this matter, please contact the license renewal project manager, Perry Buckberg, at 301-415-1383 or e-mail PHB1@nrc.gov.

Sincerely,

/RA/

Pao-Tsin Kuo, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Safety Evaluation Report with Open Items cc w/encls: See next page

Pkg - ML070600795, Transmittal Letter - ML070510236, SER - ML070600798 OFFICE PM:RLRA:DLR LA:DLR OGC (NLO)

(A)BC:DLR:RLRA:DLR BC:DLR:RLRC:DLR NAME PBuckberg SFigueroa SUttal RSchaaf KChang DATE 03/01/07 02/22/07 03/01/07 02/22/07 03/01/07 OFFICE BC:DSS:SCVB BC:DE:EGCB BC:DE:EEEB BC:DE:EQVB BC:DSS:SBPB NAME RDennig (via e-mail)

KManoly (via e-mail)

GWilson (via e-mail)

HHamhezee (via e-mail)

JSegala (via e-mail)

DATE 01/30/07 02/27/07 01/30/07 02/01 /07 02/27/07 OFFICE BC:DSS:SRXB BC:DCI:CVIB BC:DRA:AFPB D:DRA D:DCI NAME GCranston (via e-mail)

MMitchell (via e-mail w/comments)

SWeerakkody (via e-mail)

CHolden MEvans DATE 02/08/07 02/12/07 02/26/07 03/01/07 02/23/07 OFFICE D:DE D:DSS D:DLR NAME PHiland TMartin PTKuo DATE 02/28/07 02/27/07 03/01/07

Letter to M. Kansler from PT Kuo Dated March 1, 2007

SUBJECT:

SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF PILGRIM NUCLEAR POWER STATION DISTRIBUTION:

HARD COPY DLR R/F E-MAIL:

RWeisman GGalletti DShum SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDeEqvb RidsNrrDss RidsOgcMailCenter RidsNrrAdes PBuckberg SHoffman SUttal JShea AWilliamson JDavis KChang GWilson CAnderson, RI WRaymond, RI NSheehan, RI

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213

Pilgrim Nuclear Power Station cc:

Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Plymouth Public Library Attn: Dinah OBrien 132 South Street Plymouth, MA 02360 Duxbury Free Library ATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332 Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364 Ms. Mary Lampert Duxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332

Pilgrim Nuclear Power Station cc:

Mr. Kevin H. Bronson General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348