ML070780491
| ML070780491 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/27/2001 |
| From: | Entergy Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| CR-PNP-2001-04238 | |
| Download: ML070780491 (4) | |
Text
CONDITION REPORT CR-PNP-2001-04238 En-zzY I
~
Originator: CONVERTED DATA Originator Group: CONVERTED DATA Supervisor Name: CONVERTED DATA Discovered Date: 09/27/200 1 0O:OO Originator Phone: 0 Operability Required: N Reportability Required: N Initiated Date: 09/27/2001 0O:OO Condition
Description:
TOUR OPR REPORTED THAT HCU 50-3 1 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENT BENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX.
CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL. REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Immediate Action
Description:
Suggested Action
Description:
EQUIPMENT:
Tag Name Tag Suffi Name Component Code Process System Code 03 REFERENCE ITEMS:
Type Code Description CONVERTED PR PR.01.4238 REACTIVITY - RELATED PNP-2001-4238
ADMIN EnteiEY I
Initiated Date: 9/27/2001 0:OO Owner Group :Plan Sched Outage Staff Current
Contact:
MILLER, R.
Current Significance: C - CORRECTION Closed by: MILLER, R.
10/4/2001 0:OO CR-PNP-2001-04238 Summary
Description:
TOUR OPR REPORTED THAT HCU 50-3 1 LEAK APPEARS WORSE. INVESTIGATED AND FOUND WATER LEAKING ACROSS JUNCTION BOX AND INTO CATCH CONTAINMENT BENEATH HCU. DETERMINED THAT WATER LEAKING PAST JUNCTION BOX UNACCEPTABLE POSSIBILITY OF FLOODING JUNCTION BOX.
CONTACTED HP AND REROUTED LEAKAGE USING A RAG AND DUCT TAPE. IT DOES THE TRICK BUT LOOKS VERY UNPROFESSIONAL. REPAIR HCU DIRECTIONAL CONTROL VALVE ASAP Remarks
Description:
PR=EF HCU 50-31 LEAK WATER CATCH CONTAINMENT RADIATION PROTECTION M. MCDONNELL Closure
Description:
SEE EVALUATION RESPONSE.
E72teqg-y A S S I G N M E N T S Version: 1 Significance Code: C - CORRECTION Classification Code: NON-SIGNIFICANT Owner Group: Plan Sched Outage Staff Performed By: Edelhauser,James E Assignment
Description:
EVALUATE SCHEDULING THE REPAIRS FOR HCU 50-3 1.
CR-PNP-2001-04238 10/04/200 1 0O:OO
Entefgy CA Number:
1 I
-. __- -- - _ _ - ~ - - _ _
I Group Name Assigned By: Plan Sched Outage Staff Assigned To: Maint Plant Production Staff EDELHAUSER, J.
Edelhauser,James E CORRECTIVE ACTION CR-PNP-2001-04238 Subassigned To :
~~
~~
Originated By: EDELHAUSER, J.
Performed By: EDELHAUSER, J.
Subperformed By:
Approved By:
Closed By: EDELHAUSER, J.
9/27/2001 0O:OO:OO 10/4/2001 0O:OO:OO 10/4/2001 0O:OO:OO Current Due Date: 12/03/2001 Initial Due Date: 12/03/2001 CA Type: GENERAL Plant Constraint: NONE CA
Description:
EVALUATE SCHEDULING THE REPAJRS FOR HCU 50-3 1.
Response
Subresponse :
CONVERTED DATA Closure Comments:
MEMO DETAILING THE RESULTS OF THE REVIEW AND THE CORRECTIVE ACTIONS TAKEN.
[ 10/04/2001; J.Edelhauser] Problem Report relates to leaking HCU 50-3 1 Direction Control Valve Block. The priority of related Maintenance Request 01 117275 was elevated and the work was schedule earlier. The work has now been completed and the maintenance request is in Post Work Test status.
No further action is required to close the Problem Report.
Jim Edelhauser Scheduling Supervisor X8059