ML070780418

From kanterella
Jump to navigation Jump to search
CR-PNP-2000-09228, P-161C Suction Piping 98 Deg. Elbow for C Continuous SSW Hypo Pump Cracked and Leaking Into Burm Area
ML070780418
Person / Time
Site: Pilgrim
Issue date: 06/12/2000
From:
Entergy Nuclear Generation Co
To:
Office of Nuclear Reactor Regulation
References
CR-PNP-2000-09228
Download: ML070780418 (6)


Text

ET?!tWg)f Originator: CONVERTED DATA Originator Group: CONVERTED DATA Supervisor Name: CONVERTED DATA Discovered Date: 06/12/2000 0O:OO CONDITION REPORT CR-PNP-2000-09228 Originator Phone: 0 Operability Required: N Reportability Required: N Initiated Date: 06/12/2000 0O:OO Condition

Description:

MAINTENANCE DISCOVERED P-161C SUCTION PIPING 98 DEG ELBOW FOR C CONTINUOUS SSW HYPO PUMP CRACKED AND LEAKING INTO BURM AREA Immediate Action

Description:

Suggested Action

Description:

EQUIPMENT:

Tag Name Tag Suffi Name Component Code Process System Code 27 REFERENCE ITEMS:

Type Code Description CONVERTED PR PR.00.9228 TRENDING (For Reference Purposes Only):

Trend Tvpe Trend Code KEYWORDS MAINT RULE

ADMIN Enfefgy Initiated Date: 6/12/2000 0:OO Owner Group :Maint Programs Staff Current

Contact:

SHATAS, A.

Current Significance: C - CORRECTION Closed by: SHATAS, A.

6/19/2000 0:OO CR-PNP-2000-09228 Summary

Description:

MAINTENANCE DISCOVERED P-161C SUCTION PIPING 98 DEG ELBOW FOR C CONTINUOUS SSW HYPO PUMP CRACKED AND LEAKING INTO BURM AREA Remarks

Description:

PR=HPI HYPO P-161C MR10001275 PIPING CRACKED LEAKING BURM Closure

Description:

EVALUATION AND CORRECTIVE ACTION COMPLETE.

En&ygy A S S I G N M E N T S Version: 1 Significance Code: C - CORRECTION Classification Code: NON-SIGNIFICANT Owner Group: Maint Programs Staff Performed By: DeTemple,Francis J 06/19/2000 0O:OO Assignment

Description:

CONDUCT A REWORK EVALUATION FOR THE CONCERNS IDENTIFIED BY THIS PROBLEM REPORT.

DETERMINE AND IMPLEMENT REQUIRED CORRECTIVE ACTIONS.

NOTE: "AN APPARENT CAUSE ANALYSIS SHALL BE PERFORMED IF THE EVALUATION DETERMINES THAT THIS IS A REWORK ISSUE".

CR-PNP-2000-09228

Enteqg-y I CORRECTIVE ACTION 1 CR-PNP-2000-09228 CA Number:

1 Group J I Name I

MCALLISTER, S.

DeTemple,Francis J I

i _ ~ _ - __

Assigned By: Maint Programs Staff Assigned To: Maint Programs Staff Subassigned To :

Originated By: MCALLISTER, S.

Performed By: DETEMPLE, F.

7/6/2000 0O:OO:OO 6/12/2000 0O:OO:OO Subperformed By:

Approved By:

Closed By: MCALLISTER, S.

7/6/2000 0O:OO:OO Current Due Date: 08/l 8/2000 Initial Due Date: 0811 8/2000 CA Type: GENERAL Plant Constraint: NONE CA

Description:

CONDUCT A REWORK EVALUATION FOR THE CONCERNS IDENTIFIED BY THIS PROBLEM REPORT.

DETERMINE AND IMPLEMENT REQUIRED CORRECTIVE ACTIONS.

NOTE: "AN APPARENT CAUSE ANALYSIS SHALL BE PERFORMED IF THE EVALUATION DETERMINES THAT THIS IS A REWORK ISSUE".

Response

Subresponse :

CONVERTED DATA

Entqgy Closure Comments:

MEMO DETAILING THE RESULTS OF THE REVIEW AND THE CORRECTIVE ACTIONS TAKEN.

CORRECTIVE ACTION CR-PNP-2000-09228 UPON COMPLETION FORWARD A COPY TO J. GAEDTKE.

PROBLEM REPORT PROBLEM REPORT No. 00.9228.00 EVALUATION RESPONSE

1. Problem

Description:

Maintenance discovered P-161C suction piping 90-degree elbow for P-161C continuous SSW hypo pump cracked and leaking into burm area.

2. ApparentDirect Cause: Over-tightening of the PVC elbow caused cracking to occur. It was noted that great difficulty was encountered during removal of the elbow.
3. Repeat Occurrence: __ YES -X-NO A yes answer may require significance elevation based on nature and extent of problem 4.Equipment Performance Issues: System Number -HYPO-Component Number P 16 1 C-Maintenance Rule Functional Failure: -

YES -X-NO -

Unknown

5. Corrective Actions Completed (include Dates if possible): Elbow replaced. Work completed IAW temporary repair procedure 1.5.3.9 under MR 10001275 on 6-28-00.
6. Corrective Actions Required (If not required check "N/R") -X-N/R
7. Trend Data for Apparent Cause (check "N/R" if analysis deals with equipment performance only)

N/R a) Inappropriate Action (IA)

Description:

During initial installation worker tightened the PVC elbow to tight.

IA Job Title -Worker IA Group -Maint IA Department M a i n t ENTERGY X 0

Contractor Work Process -MC Key Activity F W

O&P Failure Mechanism 5 HEIA Failure Mechanism -1M Human Error Type (Circle 1): Skill BasedO Rule BasedO Knowledge Based Procedure Number(s) -N/A Event Type REW-

8. The Significance should:

Be Upgraded -X-Remain the Same If applicable, the reason for the upgraded:

Completed By: -J.

DETEMPLE Date: 6

@ OEvaluatorMentor

-- I 00-Approved By: -S.

MCALISTER Date: 7 I 6 /LOO-0 0 Manager

[7118/00; A. SHATAS] A COPY OF THIS EVALUATION WAS SENT TO J. GAEDTKE.

NOTE: P-161C SUCTION PIPING 90? ELBOW SHOWED EVIDENCE OF OVERTIGHTENING OF THE PVC ELBOW. DURING ELBOW REPLACEMENT, GREAT DIFFICULTY WAS ENCOUNTERED DURING UNTHREADING OF THE CRACKED PVC ELBOW. A NEW PVC ELBOW WAS INSTALLED AND TIGHTENED SUFFICIENT TO PREVENT LEAKAGE AT THE NPT CONNECTION.

THE 5-FUNCTION VALVE ON THE P-161C DISCHARGE PIPING WAS REPLACED WITH A SINGLE-FLTNCTION AIR BLEED VALVE DUE TO A CRACKED INLET NIPPLE CAUSED BY INSUFFICIENT PIPING SUPPORT AND PULSE VIBRATION FROM THE POSITIVE DISPLACEMENT PUMP. ADDITIONAL SUPPORT FOR P-161A AND D 1 F

l r

n T

P r

U A

a r

C T

T

~

A C

D D

T T

n D

~

T T

T n

~

T n

1 T l T E R q ? ~ E N T W A C