ML070780188
| ML070780188 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 03/26/1999 |
| From: | Entergy Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| CR-PNP-1999-09102 | |
| Download: ML070780188 (2) | |
Text
I CONDITION REPORT 1 CR-PNP-1999-09102 Originator: CONVERTED DATA Originator Group: CONVERTED DATA Supervisor Name: CONVERTED DATA Discovered Date: 03/26/1999 0O:OO Originator Phone: o Operability Required: N Reportability Required: N Initiated Date: 03/26/1999 0O:OO Condition
Description:
NCR 99-19 FOR 2 LOOSE 2 DIA. TORUS ANCHOR BOLT EXTENSIONS AT TORUS SADDLE SUPPORT BETWEEN BAYS 12 & 13 AND CORROSION OF BASEPLATES EXCEEDING 10% OF BASE METAL THICKNESS.
Immediate Action
Description:
Suggested Action
Description:
EQUIPMENT:
Tag Name REFERENCE ITEMS:
Tvpe Code CONVERTED PR Tag: Suffi Name Component Code Process System Code 50 Description PR.99.9102
I ADMIN CR-PNP-1999-091 02 Initiated Date: 3/26/1999 0:OO Owner Group :Eng DE Mech Civil Struct Staff Current
Contact:
SHATAS, A.
Current Significance: C - CORRECTION Closed by: SHATAS, A.
4/2/1999 0:OO Summary
Description:
NCR 99-19 FOR 2 LOOSE 2" DIA. TORUS ANCHOR BOLT EXTENSIONS AT TORUS SADDLE SUPPORT BETWEEN BAYS 12 & 13 AND CORROSION OF BASEPLATES EXCEEDING 10% OF BASE METAL, THICKNESS.
Remarks
Description:
PR=EF NCR 99-19 TORUS ANCHOR BOLTS BASE METAL,
-SUPORT-Closure
Description:
EVALUATION AND CORRECTIVE ACTION COMPLETE.