AUG 1 5 ZOO FPL L-2005-182 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - July 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the July 2005 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

5ez xI an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 8/4/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period July. 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) _ _720 Maximum Dependable Capacity (MWe-Net) __693_

t Month I No. of hours reactor was critical 744 No. of hours generator was on line (service hours) 744 4926.4 212002.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 519877 3471382 139010047 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A NIA N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summarv Of Monthly Operating Experience Unit 3 operated at essentially 100% powver for the month of July.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 8/4/2005 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period: July. 2005 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 I

Month 4-No. of hours reactor was critical 447.4 No. of hours generator was on line (service hours) _

386.3 ,

Unit reserve shutdown hours 0 Net Electrical Energy (MWH) 250120 ( 1996281 136597032 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20050027 07/01/2005 . 307.3 A D Continuation of being down due to Internal

._main fransormer fault 6/27/2005 20050033 07/152005 F 28.9 A 1 Shutdown the reactor per GOP-301 to repair

___ __ __ _ __ J____ __

__ ___ _ __ __ __ _ __ __ __ __ __isophase bus groundI (1)Reason (2) Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 had been shut down since 6/27/2005 from a turbine trip and subsequent reactor trip that wNas due to an internal fault in the main transformer. The transformer was replaced. Unit 4 entered mode 1 on 7/15/2005.

The unit was shut down per station procedure to repair an isophase bus ground. On 7/16/2005 the unit re-entered mode 1, reaching 100% power on 7/17/2005, and has continued operating at essentially 100% power for the month of July.