February 2003 Monthly Operating Report for Turkey Point, Units 3 & 4
ML030780646
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/10/2003
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-058
Download: ML030780646 (3)


Text

PAR 10 203 L-2003-058 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2003 Operating 4.

Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and Turkey Point Plant OIH Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 3/4/2003 DATE:

Olga Hanek COMPLETED BY:

(305) 246-6607 TELEPHONE:

Reporting Period February, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 886525 12624560 Maximum Dependable Capacity' (MWe-Net) 693 Month Year-to-date Cumulative 672.0 1375.7 195915.55 No. of hours reactor was critical 672.0 1370.1 193578.6 No. of hours generator was on line (service hours) 0 0 121.8 Unit reserve shutdown hours 393041 886525 126245602 Net Electrical Energy (MWH)

UNIT SHUTDOWNS (2) Method (1) Reason 1 - Manual A - Equipment Failure (Explain) 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience to 60% to repair the 3B main Unit 3 operated at essentially 100% until 2/18/03 when power was reduced the month in preparation for feedwater pump. Unit 3 remained at approximately 60% power for the rest of the refueling outage scheduled to begin March 1, 2003.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 3/4/2003 COMPLETED BY: Olga Hanek TELEPHONE: (305) 246-6607 Reporting Period February, 2003 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Mon[n nulative 192778.7 nrioni 4 A 4 ih il =! L I, l1-+ IV OT hours reactor was__________11 NJO.

672 1416 188361.2 No. of hours generator was on line (service hours) 577.2 Unit reserve shutdown hours 0 0 481820 992719 123951809 Net Electrical Energy (MWH)

UNIT SHUTDOWNS (1) Reason (2) Method 1 - Manual A - Equipment Failure (Explain) 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operatingq Experience Unit 4 operated at essentially 100% power for the month of February 2003.

Text

PAR 10 203 L-2003-058 FPL 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2003 Operating 4.

Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and Turkey Point Plant OIH Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 3/4/2003 DATE:

Olga Hanek COMPLETED BY:

(305) 246-6607 TELEPHONE:

Reporting Period February, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 886525 12624560 Maximum Dependable Capacity' (MWe-Net) 693 Month Year-to-date Cumulative 672.0 1375.7 195915.55 No. of hours reactor was critical 672.0 1370.1 193578.6 No. of hours generator was on line (service hours) 0 0 121.8 Unit reserve shutdown hours 393041 886525 126245602 Net Electrical Energy (MWH)

UNIT SHUTDOWNS (2) Method (1) Reason 1 - Manual A - Equipment Failure (Explain) 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience to 60% to repair the 3B main Unit 3 operated at essentially 100% until 2/18/03 when power was reduced the month in preparation for feedwater pump. Unit 3 remained at approximately 60% power for the rest of the refueling outage scheduled to begin March 1, 2003.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 3/4/2003 COMPLETED BY: Olga Hanek TELEPHONE: (305) 246-6607 Reporting Period February, 2003 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Mon[n nulative 192778.7 nrioni 4 A 4 ih il =! L I, l1-+ IV OT hours reactor was__________11 NJO.

672 1416 188361.2 No. of hours generator was on line (service hours) 577.2 Unit reserve shutdown hours 0 0 481820 992719 123951809 Net Electrical Energy (MWH)

UNIT SHUTDOWNS (1) Reason (2) Method 1 - Manual A - Equipment Failure (Explain) 2 - Manual Trip/Scram B - Maintenance or Test 3 - Automatic Trip/Scram C - Refueling 4 - Continuation D - Regulatory Restriction 5 - Other (Explain)

E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operatingq Experience Unit 4 operated at essentially 100% power for the month of February 2003.