L-2004-284, November 2004 Monthly Operating Report for Turkey Point, Units 3 and 4

From kanterella
Jump to navigation Jump to search
November 2004 Monthly Operating Report for Turkey Point, Units 3 and 4
ML043560174
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/15/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-284
Download: ML043560174 (3)


Text

DEC 1 5 2004 FPL L-2004-284 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - November 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

IX' an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3

.I DATE: 12/03/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period November. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) - - 720 l:- Am _---__ ___- - _-- -_i-- ; __

Maximum Dependable Capacity (MWe-Net) 693 I

'Month Year-to-date Cumulative No. of hours reactor was critical 8.7 -6477.8 209011 No. of hours generator was on line (service hours) 0 6396.7 206537.2 Unit reserve shutdown hours - - 0 0 121.8 Net Electrical Energy (MWH) 0 4463145 135267790 UNIT SHUTDOWNS (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summarv Of Monthlv Operatina Experience Unit 3 has been shut down since September 26, 2004 and was down the entire month of November for the Cycle 21 refueling outage.

I DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 12/03/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period November, 2004 Design Electrical Rating (MWe-Net) 720 ;_, ,t '-_ ad Maximum Dependable Capacity (MWe-Net) 693 _ _1-_"_-______:

Month Year-to-date Cumulative No. of hours reactor was critical 720 7998.9 207418.7 No. of hours generator was on line (service hours) 720 7945.5 202923.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 516763 5569556 134091124 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of November, 2004.

Text

DEC 1 5 2004 FPL L-2004-284 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - November 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

IX' an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3

.I DATE: 12/03/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period November. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) - - 720 l:- Am _---__ ___- - _-- -_i-- ; __

Maximum Dependable Capacity (MWe-Net) 693 I

'Month Year-to-date Cumulative No. of hours reactor was critical 8.7 -6477.8 209011 No. of hours generator was on line (service hours) 0 6396.7 206537.2 Unit reserve shutdown hours - - 0 0 121.8 Net Electrical Energy (MWH) 0 4463145 135267790 UNIT SHUTDOWNS (1) Reason (2) Method A- Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summarv Of Monthlv Operatina Experience Unit 3 has been shut down since September 26, 2004 and was down the entire month of November for the Cycle 21 refueling outage.

I DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 12/03/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period November, 2004 Design Electrical Rating (MWe-Net) 720 ;_, ,t '-_ ad Maximum Dependable Capacity (MWe-Net) 693 _ _1-_"_-______:

Month Year-to-date Cumulative No. of hours reactor was critical 720 7998.9 207418.7 No. of hours generator was on line (service hours) 720 7945.5 202923.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 516763 5569556 134091124 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of November, 2004.