L-2003-003, December 2002 Monthly Operating Report for Turkey Point Units 3 & 4

From kanterella
Jump to navigation Jump to search
December 2002 Monthly Operating Report for Turkey Point Units 3 & 4
ML030230719
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/13/2003
From: Mcelwain J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-003
Download: ML030230719 (3)


Text

3 JAN 1 3 200/

FPL L-2003-003 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - December 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, P.McElwaiI Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

'1k' an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 1/2/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period December, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720giS@> -1irl Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744 8760 194539.8 No. of hours generator was on line (service hours) 744 8760 192208.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 539129 6215430 125359077 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of December 2002.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 1/2/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period December, 2002 Design Electrical Rating (MWe-Net) 720 j_________________

Maximum Dependable Capacity (MWe-Net) 693 Gobs: GREttmRER Month Year-to-date Cumulative No. of hours reactor was critical 744 8393.2 191362.7 No. of hours generator was on line (service hours) 744 8370.1 186945.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 536078 5854079 122959090 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of December 2002.

Text

3 JAN 1 3 200/

FPL L-2003-003 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - December 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the December 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, P.McElwaiI Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

'1k' an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 1/2/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period December, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720giS@> -1irl Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744 8760 194539.8 No. of hours generator was on line (service hours) 744 8760 192208.5 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 539129 6215430 125359077 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of December 2002.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 1/2/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period December, 2002 Design Electrical Rating (MWe-Net) 720 j_________________

Maximum Dependable Capacity (MWe-Net) 693 Gobs: GREttmRER Month Year-to-date Cumulative No. of hours reactor was critical 744 8393.2 191362.7 No. of hours generator was on line (service hours) 744 8370.1 186945.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 536078 5854079 122959090 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of December 2002.