L-2003-089, March 2003 Monthly Operating Report for Turkey Point Units 3 & 4

From kanterella
Jump to navigation Jump to search
March 2003 Monthly Operating Report for Turkey Point Units 3 & 4
ML031130411
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/15/2003
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-089
Download: ML031130411 (3)


Text

APR 1 5 2 FPL L-2003-089 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - March 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the March 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

4 an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 4/4/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period March, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 ________c___A___

Maximum Dependable Capacity (MWe-Net) 693 A d A ___a_______h_

Month Year-to-date Cumulative No. of hours reactor was critical 105.5 1481.2 196021 No. of hours generator was on line (service hours) 77.5 1447.6 193656.1 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 28123 914648 126273725

_____________________________________ -a .i.

UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating ExDerience Unit 3 performed a scheduled shutdown from 60% power on 3/1/03 for refueling and returned to power operation on 3/28/03.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 4/4/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period March, 2003 Design Electrical Rating (MWe-Net) 720 ___________gd___

Maximum Dependable Capacity (MWe-Net) 693 t Month Year-to-date Cumulative No. of hours reactor was critical 744 2160 193522.7 No. of hours generator was on line (service hours) 744 2160 189105.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 527840 1520559 124479649 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of March, 2003.

Text

APR 1 5 2 FPL L-2003-089 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - March 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the March 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

4 an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 4/4/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period March, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 ________c___A___

Maximum Dependable Capacity (MWe-Net) 693 A d A ___a_______h_

Month Year-to-date Cumulative No. of hours reactor was critical 105.5 1481.2 196021 No. of hours generator was on line (service hours) 77.5 1447.6 193656.1 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 28123 914648 126273725

_____________________________________ -a .i.

UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating ExDerience Unit 3 performed a scheduled shutdown from 60% power on 3/1/03 for refueling and returned to power operation on 3/28/03.

DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 4/4/2003 COMPLETED BY: David Lafleur TELEPHONE: (305) 246-7150 Reporting Period March, 2003 Design Electrical Rating (MWe-Net) 720 ___________gd___

Maximum Dependable Capacity (MWe-Net) 693 t Month Year-to-date Cumulative No. of hours reactor was critical 744 2160 193522.7 No. of hours generator was on line (service hours) 744 2160 189105.2 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 527840 1520559 124479649 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of March, 2003.